- ML20074A321 + (08:12:59, 15 December 2024)
- ML20074A319 + (08:12:59, 15 December 2024)
- ML20074A310 + (08:13:00, 15 December 2024)
- 05000277/LER-1983-008-03, /03L-0:on 830407,HPCI High Steam Flow Isolation Switch DPIS-2-23-77 Setpoint Found Above Tech Spec Limit. Caused by Setpoint Drift of Barton Model 288.Instrument Recalibr,Tested & Returned to Svc + (08:13:01, 15 December 2024)
- ML20074A291 + (08:13:02, 15 December 2024)
- 0CAN048301, Responds to NRC Re Violations Noted in IE Insp Repts 50-313/82-36 & 50-368/82-37.Corrective Actions:Form 1609.010A Re Calculation of Max Permissible Concentration Revised to Require Health Physics Supervisor Signature + (08:13:03, 15 December 2024)
- ML20074A278 + (08:13:04, 15 December 2024)
- 05000298/LER-1983-004-03, /03L-0:on 830409,during Sp 6.1.4,contacts of Relay 917-5A-K7D Failed to Open.Cause Not Determined.Relay Coil Replaced & Proper Operation Verified.All Ac Hfa Relays on Essential Sys Will Be Tested During Spring 1983 Outage + (08:13:05, 15 December 2024)
- ML20074A265 + (08:13:06, 15 December 2024)
- 05000298/LER-1983-004, Forwards LER 83-004/03L-0.Detailed Event Analysis Submitted + (08:13:07, 15 December 2024)
- ML20074A258 + (08:13:07, 15 December 2024)
- ML20074A254 + (08:13:10, 15 December 2024)
- RBG-14-974, Final Deficiency Rept DR-91 Re Misapplication of Bethlehem Steel Load Indicating Washer in Structural Steel Slip Connection in Reactor Bldg.Initially Reported on 830111. Condition Determined Not Reportable Per 10CFR50.55(e) + (08:13:10, 15 December 2024)
- 05000313/LER-1983-010, Forwards LER 83-010/03L-0 + (08:13:15, 15 December 2024)
- RBG-14-975, Interim Deficiency Rept DR-108 Re Bergen-Paterson Pipe Support Std Components Nonconformance W/Design Drawings. Initially Reported on 830406.Investigation Ongoing.Interim or Final Rept Will Be Submitted by 830621 + (08:13:15, 15 December 2024)
- RBG-14-941, Interim Deficiency Rept DR-106 Re Interstate Steel,Hub Inc, Regal & Welded Tube of America Documentation for Class 1, A-500,Grade B Tube Steel.Initially Reported on 830404. Investigation Ongoing.Next Rept by 830707 + (08:13:17, 15 December 2024)
- ML20074A228 + (08:13:17, 15 December 2024)
- ML20074A222 + (08:13:18, 15 December 2024)
- ML20074A226 + (08:13:18, 15 December 2024)
- 05000315/LER-1983-031-03, /03L-0:on 830407,while Attempting to Exit Upper Containment,Outer Door of Personnel Airlock Would Not Open. Caused by Interlock Cable Being Out of Adjustment.Cable Replaced + (08:13:20, 15 December 2024)
- 05000315/LER-1983-031, Forwards LER 83-031/03L-0 + (08:13:21, 15 December 2024)
- ML20074A204 + (08:13:21, 15 December 2024)
- ML20074A203 + (08:13:22, 15 December 2024)
- ML20074A202 + (08:13:23, 15 December 2024)
- ML20074A201 + (08:13:24, 15 December 2024)
- ML20074A200 + (08:13:24, 15 December 2024)
- ML20074A197 + (08:13:25, 15 December 2024)
- RBG-14-908, Final Deficiency Rept DR-23 Re HPCS Diesel Generator Radioactive Heat Loss Value Used in Sizing of HPCS Room Cooling Fans.Initially Reported on 820212.GE Committed to Change Heat Load Data in Manuals for Diesel Engines + (08:13:25, 15 December 2024)
- 05000277/LER-1983-009-03, /03L-0:on 830324,during Surveillance Testing,Smoke Detector in Drywell Failed to Provide Audible Alarm Code or Annunciate in Control Room.Caused by Defective Detector Circuit Board.Board Replaced,Tested & Returned to Svc + (08:13:27, 15 December 2024)
- ML20074A158 + (08:13:28, 15 December 2024)
- RBG-14-940, Responds to IE Bulletin 80-16, Potential Misapplication of Rosemount,Inc Models 1151 & 1152 Pressure Transmitters W/ Either a or D Output Codes. Pressure Transmitters Not Employed in safety-related Applications + (08:13:28, 15 December 2024)
- ML20074A152 + (08:13:29, 15 December 2024)
- ML20074A153 + (08:13:29, 15 December 2024)
- ML20074A148 + (08:13:30, 15 December 2024)
- ML20074A147 + (08:13:31, 15 December 2024)
- 05000316/LER-1983-040-03, /03L-0:on 830422,CCW West HX Outlet to Miscellaneous Svc Valves Failed to Operate within Inservice Insp (ISI) Time Limits.Caused by Infrequent ISI Testing. ISI Testing Frequency Increased from Quarterly to Monthly + (08:13:32, 15 December 2024)
- RBG-14-942, Interim Deficiency Rept DR-107 Re Category I Air Circuit Breakers W/Trip Coils of Higher Range than Shown on Bill of Matls.Initially Reported on 830404.Investigation Incomplete. Next Rept Will Be Submitted by 830614 + (08:13:33, 15 December 2024)
- 05000316/LER-1983-040, Forwards LER 83-040/03L-0 + (08:13:35, 15 December 2024)
- ML20074A139 + (08:13:35, 15 December 2024)
- ML20074A128 + (08:13:36, 15 December 2024)
- ML20074A129 + (08:13:36, 15 December 2024)
- ML20074A125 + (08:13:37, 15 December 2024)
- ML20074A124 + (08:13:37, 15 December 2024)
- ML20074A106 + (08:13:38, 15 December 2024)
- ML20074A098 + (08:13:40, 15 December 2024)
- ML20074A097 + (08:13:41, 15 December 2024)
- LD-83-044, Forwards Amend 8 to CESSAR-F.List of Rev Topics Encl + (08:13:43, 15 December 2024)
- ML20074A095 + (08:13:43, 15 December 2024)
- ML20074A078 + (08:13:44, 15 December 2024)
- ML20074A074 + (08:13:45, 15 December 2024)
- 05000333/LER-1983-017-03, /03L-0:on 830414,Nine Mile Point-South Oswego 115kV Line 5 Tripped & Locked Out,Removing One Reserve Power Supply from Svc.Caused by Line Automatically Isolating When Tower Hold Down Guy Pulled Out of Ground + (08:13:47, 15 December 2024)
- 05000333/LER-1983-017, Forwards LER 83-017/03L-0 + (08:13:48, 15 December 2024)