Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000219/LER-1991-001, :on 910301,deluge Sys Taken Out of Svc W/O Establishing Continuous Fire Watch.Caused by Personnel Error.Continuous Fire Watch Assigned & Lessons Learned Lecture Given to Fire Watch Personnel + (06:23:39, 15 December 2024)
- ML20077J910 + (06:23:40, 15 December 2024)
- ML20077J909 + (06:23:40, 15 December 2024)
- ML20077J906 + (06:23:41, 15 December 2024)
- 05000374/LER-1991-005-02, :on 910621,RCIC Declared Inoperable Due to Discovery of Failure of Pressure Differential Switch.Caused by Ruptured Diaphragm.Replacement Switch Installed,Calibr & Functionally Tested Satisfactory + (06:23:46, 15 December 2024)
- ML20077J898 + (06:23:47, 15 December 2024)
- ML20077J897 + (06:23:48, 15 December 2024)
- B13891, Requests Relief from ASME Code Section XI Re Repair to Pipe 3SWP-030-334-3 at Millstone Unit 3 + (06:23:49, 15 December 2024)
- ML20077J893 + (06:23:50, 15 December 2024)
- ML20077J876 + (06:23:51, 15 December 2024)
- NLS9100474, Forwards Iowa Power,Inc 1990 Annual Rept to Sec on Form 10-K & Iowa Power Analysts Info Sheet as Evidence of Guarantee of Payment of Deferred Premiums + (06:23:52, 15 December 2024)
- 05000327/LER-1991-013-01, :on 910613,penetration Seal Discovered Inoperable Due to Deficient Procedure.Root Cause Unknown. Training Conducted to Familiarize Personnel W/Fire Compartmentation Requirements + (06:23:56, 15 December 2024)
- ML20077J840 + (06:23:57, 15 December 2024)
- 2CAN079106, Forwards Simulator Exam Scenarios to Be Conducted on Plant Simulator on 910815.Ack Receipt of Support of Waiver of License Exam for Cg Anderson.W/O Encl + (06:23:58, 15 December 2024)
- BECO-91-098, Forwards Rev 9A to Pilgrim Nuclear Power Station Core Operating Limits Rept (Cycle 9) + (06:23:58, 15 December 2024)
- 05000324/LER-1991-005-03, :on 910630,ESF Actuations Occurred.Caused by Voltage Regulator Transient W/Failure of Primary Containment Isolation Solenoid Operated Valves.Solenoids for 2-G16-F003 & 2-16-F004 Replaced + (06:24:00, 15 December 2024)
- RBG-35381, Forwards Response to NRC 910430 Request for Info Re Maint of Transmission Line right-of-way by Periodic Removal of Tall Growing Trees & That Pesticides or Herbicides Will Not Be Used + (06:24:07, 15 December 2024)
- ML20077J818 + (06:24:08, 15 December 2024)
- ML20077J802 + (06:24:08, 15 December 2024)
- 05000341/LER-1991-015, :on 910627,reactor Scram Occurred Due to Overheating at Main Transformer 2A.Caused by Offsite Util Maint Personnel Reassembling Isophase Bus Housing Incorrectly.Instruction Revised + (06:24:10, 15 December 2024)
- PY-CEI-NRR-1373, Responds to NRC Re Violations Noted in Insp Rept 50-440/91-02.Corrective Actions:Operator Conducting Test Disciplined & Counseled W/Respect to Necessity of Attention to Detail & Procedural Compliance + (06:24:11, 15 December 2024)
- ML20077J783 + (06:24:12, 15 December 2024)
- ML20077J787 + (06:24:12, 15 December 2024)
- 05000285/LER-1991-014, :on 910629,radiation Monitor RM-054A Discovered Out of Svc.Caused by Personnel Error.Test OP-ST-SHIFT-0001 Revised to Include check-off When All Radiation Monitors Calibrated + (06:24:14, 15 December 2024)
- 3F0791-17, Responds to SALP Rept 50-302/91-07.Budgets Approved & Util in Process of Purchasing Security Equipment + (06:24:15, 15 December 2024)
- 05000423/LER-1991-016, :on 910624,control Switch for Power Operated Relief Valve Discovered Inoperable.Caused by Inadequate Info Detailing Precise Switch.Individuals Involved Counseled on Need to Verify Proper Switch Functions + (06:24:16, 15 December 2024)
- ML20077J766 + (06:24:17, 15 December 2024)
- ML20077J765 + (06:24:18, 15 December 2024)
- ML20077J764 + (06:24:18, 15 December 2024)
- 05000333/LER-1991-008, :on 910625,fire Barrier Manway Discovered Opened W/O Fire Watch.Caused by Personnel Error.Counseling of Personnel & Labeling of Removable Fire Barrier Penetration Seals Completed + (06:24:20, 15 December 2024)
- RBG-35-380, Rev 5B to River Bend Station Pump & Valve Inservice Testing Program Plan. Relief Requests Encl + (06:24:21, 15 December 2024)
- HL-1666, Forwards Rev 9C to Fsar,Fire Hazards Analysis & Fire Protection Program for Ei Hatch Units 1 & 2 + (06:24:22, 15 December 2024)
- ML20077J719 + (06:24:22, 15 December 2024)
- 05000416/LER-1991-006-03, :on 910625,automatic Actuation of RWCU Sys, Div 2 Containment Isolation Valves Occurred During Lightning Strike to 500 Kv Transmission Line.Caused by Voltage Spike.No Corrective Actions Warranted + (06:24:24, 15 December 2024)
- ML20077J704 + (06:24:27, 15 December 2024)
- ML20077J703 + (06:24:28, 15 December 2024)
- ML20077J699 + (06:24:29, 15 December 2024)
- ML20077J698 + (06:24:30, 15 December 2024)
- ML20077J692 + (06:24:30, 15 December 2024)
- ML20077J689 + (06:24:31, 15 December 2024)
- ML20077J688 + (06:24:31, 15 December 2024)
- ML20077J685 + (06:24:32, 15 December 2024)
- ML20077J686 + (06:24:32, 15 December 2024)
- LD-83-074, Forwards Computer Simulation of Natural Circulation Cooldown + (06:24:33, 15 December 2024)
- ML20077J680 + (06:24:34, 15 December 2024)
- ML20077J682 + (06:24:34, 15 December 2024)
- W3P83-2609, Forwards Proprietary & Nonproprietary Final Assessment of Waterford-3 Fuel Structural Integrity Under Faulted Conditions, Per Ser.Proprietary Version Withheld (Ref 10CFR2.790).Affidavit Encl + (06:24:35, 15 December 2024)
- ML20077J678 + (06:24:36, 15 December 2024)
- ML20077J676 + (06:24:36, 15 December 2024)
- ML20077J674 + (06:24:38, 15 December 2024)
- ML20077J668 + (06:24:39, 15 December 2024)