Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20078N821 + (05:18:11, 15 December 2024)
- ML20078N825 + (05:18:11, 15 December 2024)
- ML20078N805 + (05:18:12, 15 December 2024)
- ML20078N810 + (05:18:12, 15 December 2024)
- BECO-LTR-95-020, Forwards Rev 32 to Procedure 8.7.3, Secondary Containment Leak Rate Test. Secondary Leak Rate Test Satisfactorily Performed 941121.Test Verified Secondary Containment Integrity as Defined by PNPS TS 4.7.C.1 + (05:18:13, 15 December 2024)
- ML20078N802 + (05:18:13, 15 December 2024)
- ML20078N765 + (05:18:14, 15 December 2024)
- ML20078N752 + (05:18:15, 15 December 2024)
- LD-95-005, Forwards Proprietary Sys 80+ Parameter List for Safety Analyses. Encl Withheld + (05:18:16, 15 December 2024)
- ML20078N727 + (05:18:18, 15 December 2024)
- ML20078N723 + (05:18:19, 15 December 2024)
- ML20078N720 + (05:18:20, 15 December 2024)
- ML20078N708 + (05:18:20, 15 December 2024)
- TAC:52499 + (05:18:21, 15 December 2024)
- ML20078N698 + (05:18:22, 15 December 2024)
- ML20078N694 + (05:18:26, 15 December 2024)
- ML20078N667 + (05:18:27, 15 December 2024)
- ML20078N685 + (05:18:27, 15 December 2024)
- ML20078N664 + (05:18:28, 15 December 2024)
- ML20078N648 + (05:18:29, 15 December 2024)
- ML20078N661 + (05:18:29, 15 December 2024)
- B13888, Submits Response to Review of RI-91-A-0037 Issues 1 & 3 Concerning Plant Activities + (05:18:30, 15 December 2024)
- 05000275/LER-1983-006, Updated LER 83-006/01T-1:on 830510,possible Undersize Condition Discovered on Reactor Coolant Piping Weld WIB-RC-2-17 During Ultrasonic Testing.Weld Confirmed to Be Above Min Wall Requirements Mechanically + (05:18:31, 15 December 2024)
- ML20078N600 + (05:18:32, 15 December 2024)
- 05000271/LER-1983-025-01, /01P-0:on 830928,during Normal Operation,Main Steam Line Radiation Monitor RM-17-251A Trip Setpoint Greater than 3 Times Normal Background at Rated Power.Caused by Inadequate Procedure.Trips Reset + (05:18:35, 15 December 2024)
- ML20078N548 + (05:18:39, 15 December 2024)
- ML20078N547 + (05:18:40, 15 December 2024)
- ML20078N544 + (05:18:41, 15 December 2024)
- ML20078N543 + (05:18:41, 15 December 2024)
- 05000333/LER-1983-037-03, /03L-0:on 830915,while Conducting Surveillance Testing on Drywell High Pressure Switches for Reactor Protection & Auto Depressurization Sys,Setpoint Found Less Conservative That Tech Specs.Setpoint Adjusted + (05:18:43, 15 December 2024)
- ML20078N513 + (05:18:44, 15 December 2024)
- ML20078N524 + (05:18:44, 15 December 2024)
- 05000280/LER-1983-043-03, LER83-043/03L-0:on 830914,following Reactor Trip,Flow Control Valve (FCV) Failed to Close Upon Receipt of Feedwater Isolation Signal.Caused by Malfunctioning Solenoid Valve & FCV-1488 Restricted by Antirotation Device + (05:18:46, 15 December 2024)
- ML20078N510 + (05:18:46, 15 December 2024)
- ML20078N509 + (05:18:47, 15 December 2024)
- 05000361/LER-1995-001, :on 950116,two Firewatch Contractors Were Involved in Physical Altercation.Caused by Firewatch Union Accounting/Financial Matter.No Firewatch Postings Were Missed + (05:18:49, 15 December 2024)
- ML20078N505 + (05:18:50, 15 December 2024)
- 05000289/LER-1983-028-01, /01T-0:on 830920,manual Inside Containment Isolation Valve IA-V20 in Instrument Air Sys Found Open. Caused by Threaded Stem Bushing Backed Partially Out of Yoke & Paint Buildup on Stem.Parts Replaced + (05:18:51, 15 December 2024)
- ML20078N501 + (05:18:52, 15 December 2024)
- ML20078N489 + (05:18:53, 15 December 2024)
- ML20078N492 + (05:18:53, 15 December 2024)
- ML20078N486 + (05:18:54, 15 December 2024)
- 05000318/LER-1983-053-03, /03L-0:on 830914,control Power Fuse for Starter Cabinet Blew,Causing Containment Cooler 21 to Trip.Caused by Rowan 2084-EPRI-1120 Indicating Light Socket Short Circuit. Socket Replaced + (05:18:55, 15 December 2024)
- BECO-LTR-95-015, Requests Relief from ASME Code,Section Xi,Articles IWC-2500 & IWF-2500 Insp Requirements for Class 2 Rhr/Fpc Intertie Piping Welds & Supports + (05:18:56, 15 December 2024)
- B15111, Forwards Rev 0 to Millstone Nuclear Power Station Unit 2 COLR Cycle 13 + (05:18:57, 15 December 2024)
- ML20078N475 + (05:18:57, 15 December 2024)
- ML20078N468 + (05:18:58, 15 December 2024)
- 05000334/LER-1983-024-03, /03L-0:on 830918,during Core Subcooling Monitor Surveillance Test to Check Channel Behavior,Monitor Found to Be Reading Erroneously.Caused by Loose Connector within Unit.Connector Repaired + (05:18:59, 15 December 2024)
- 05000374/LER-1995-001-06, :on 950112,unit 2 in Operational Condition 1 at 100% Power,Eccs & Reactor Core Isolation Cooling Low Level Initiation Occurred Resulting in Rcic.Caused by Incorrect Test Vent Valve Being Opened + (05:19:01, 15 December 2024)
- ML20078N462 + (05:19:02, 15 December 2024)
- ML20078N450 + (05:19:04, 15 December 2024)