Application for Amend to License R-103,increasing Stable U-235 Possession Limit from 45 Kg to 60 Kg & Increasing U-235 Temporary Possession Limit to 75 Kg Until 970331
ML20078N501
Person / Time
Site: University of Missouri-Columbia
Issue date: 02/07/1995
From: Mckibben J, Meyer W
MISSOURI, UNIV. OF, COLUMBIA, MO
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
NUDOCS 9502150369
Download: ML20078N501 (5)


Text

--

n.

s

  • e Research Reactor Center II Research Park Columtna, Missouri 65211 MP UNIVERSITY OF MISSOURI-COLUMBIA 3{$82 February 7,1995 Director of Nuclear Reactor Regulation ATI'N: Document Control Desk U.S. Nuclear Regulatory Commission Mail Station P1-37 Washington, DC 20555

REFERENCE:

Docket 50-186 University of Missouri Research Reactor License R-103

SUBJECT:

Requested Change to University of Missouri Research Reactor Facility License No. R-103 The University of Missouri Research Reactor (MURR) requests approval of an amendment to make the following revision to Facility Operating License Number R-103:

2.B.(2) Pursuant to the Act,10 CFR Part 70," Domestic Licensing of Special Nuclear Material," and the Commission Order dated September 27,1985, to receive, possess, and use up to 60 kilograms of contained uranium-235 of any enrichment, providing that less than 5 kilograms of this amount be unitradiated; up to 80 grams of plutonium-beryllium neutron source; up to 20 grams of plutonium-239 in the form of sheets enclosed in aluminum for use in connection with operation of the reactor; up to 40 grams of plutonium enriched to 90%

plutonium-242 in the form of a rod sealed in a stainless steel can for use in connection with operation of the reactor; and to possess, but not separate, such special nuclear material as may be produced by the operation of the facility subject to the following:

(a) The limit for possession, receipt, and use of contained uranium-235 of any enrichment is temporarily increased, until May 31,1997, to 75 kilograms, providing that less than 5 kilograms of t' tis amount be unirradiated, for the purpose of maintaining uninterrupted reactor operation pending the establishment of a capability for off-site shipment of spent fuel and the actual shipment of the spent fuel accumulated prior to the establishment of that capability. -

(b) The licensee shall, as part ofits annual reporting requirements, report the status of the establishment of shipping capability and other activities '

relevant to the use of this temporary increase in the possession limit.

r; i i l s >

9502150369 950207 PDR ADOCK 05000186 g g P PDR I COLUMBIA KANSAS CITY ROLLA ST. LOUIS U l'  !

l ma wvam1.nm,w k

e Letter to Director of Nuclear Reactor Regulation February 7,1995 Page two Two changes in the present license as amended are requested.

1. The first requested change is to increase the stable uranium 235 possession limit from 45 kilograms to 60 kilograms.

Until five years ago, spent fuel shipping was regularly scheduled through the Department of Energy (DOE) at 24 elements per year. This was consistent with MURR's nominal fuel usage of 24 to 26 elements per year and resulted in little or no increase to the base inventory of fuel elements in cycle required for MURR to operate on its 150 hours0.00174 days <br />0.0417 hours <br />2.480159e-4 weeks <br />5.7075e-5 months <br /> per week schedule.

In recent years, spent fuel shipping has become irregular and unpredictable for reasons outside MURR control. The DOE has many times altered schedules to juggle the spent fuel shipping needs of university and DOE researcif reactors with the need to accept and store foreign spent fuel. This has caused accumulation at MURR of more spent fuel elements than preferred before we are allowed to ship.

Over the last five years, the shipping irregularity has required MURR to request and NRC to evaluate and approve five different amendments associated with various temporary possession limits (Amendments 19,21,22,24 and 26).

Our present 60 kilogram temporary possession limit (License Amendment No.

26) expires May 31,1995. The attached graph (dashed line) shows that even if we make three spent fuel shipments, as tentatively scheduled, we will not be able to get below our historic 45 kilogram uranium-235 possession limit. For the foreseeable future, until we are able to resume more regular and increased spent fuel shipments to reduce the backlog of elements stored at MURR, we anticipate the possessed uraniu- 235 will vary between 40+ and 60 kilograms.

We request the increna m the stable uranium-235 possession limit to 60 kilograms understanding that if DOE provides spent fuel shipping capability on a more continuous basis, we would request returning the stable uranium-235 possession limit to 45 kilograms.

2. The second requested change is to increase the uranium-235 temporary possession limit to 75 kilograms because of recent delays and uncertainties in .

spent fuel shipments. We require authorization for more than the 60 kilogram limit to receive new elements in June and August 1995, because we are not being allowed to ship as planned earlier this year (see attached Department of t Energy letter). A 75 kilogram limit will allow uninterrupted reactor operation into early 1997.

A similar temporary 75 kilogram limit was requested by MURR March 8,1991, I and was evaluated by the NRC as the basis for Amendment No. 21 to Facility License R-103.

Letter to Direct.or of Nuclear Reactor Regulation February 7,1995 Page thr'ee These changes to the license will not require changes to the Physical Security Plan for MURR. Criticality aspects of fuel storage at MURR are not changed by the requested amendment.

We respectfully request an expedient review of this application for relief from this situation. It is uncertain when a stab'e Department of Energy resolutior, will be available. Itis outside of MURR's cor, trol. If there are any questions, please call Roland Hultsch (314-882-5205) or me (314 382-5203).

Sincerely, L

Walt A. Meyer, Jr.

Reactor Manager

$0 p

'+ -fl ALL }

CHRISTIC M. ERRANTE

'vNA NOTAkY PUBUO STATE CF MISSOLRI COGE Ca#3TY bI J. Charles McKibben m cw=m rm m. i4.ms Associate Director bjb attachments xc: USNRC, Region III

\

University of Missouri Research Reactor (MURR)

U-235 possess 5d '

(kg) 75  !

N r -J

% l i

i r-I 70-  !

[j l

rj 65- N l r ~~~~j

'm' -

l 1

r _j 60 * '

l l r ~~j N

l rj l

55- l  !

i e Projected curves after 1 Feb 95 rI

[l l 0 ------

Assumes three spent fuel shipments in 1995 l

50-7 _ _l

, !l I g 3 1 L.- J

, , , , , , , i i i i I I I ' ' ' ' ' ' ' '

J F M A M J J A S O N D; J F M A M J J A S O N D; J F 1995

[.

  • Department of Energy Savannah River Operations Office o .

j 6 P.O. Box A Aiken, South Carolina 29802

[

JAN 06199g g .

The University of Missouri-Columbia Research Reactor Facility Attn.: Mr.Roland A.Hultsch Research Park Columbia, Missouri 65211

Dear Mr. Hultsch:

L

SUBJECT:

Delays in Shipment of Spent Nuclear Fuel (SNF) to the Department of Energy's Savannah River Site (SRS) i Recently there have been concems raised about the criticality safety of SRS's main SNF rec facility, the Receiving Basin for Offsite Fuels (RBOF). As a result, we are undertaking a rigorou ,

criticality rebaselining effort in this facility that involves visualinspection and documentation o l

existing conditions as well as revised criticality calculations as required.

Because of the uncertainties associated with continued receipt of SNF into RBOF at this time, we have been forced to delay and reschedule many shipments, including the planned shipment from l the Missouri University Research Reactor. Under our current schedule, we are now planning to  !

receive the SNF from your facility in the August,1995 time frame.  ;

If this schedule delay causes significant impacts to your facility such as reactor shutdown, i significant increases m personnel radiation exposures, or major im, acts to experiments, ple document this impacts in a letter to me as soon as possible. We wil; work with you to minimize these impacts. t I appreciate your patience and cooperation in this important program.

If you have any questions please feel free to give me a call at 803-557-3759.

Sincerely, Wilham D. Clark, Manager RSFD:WDC Spent Nuclear Fuel Program CE-95-0027 i cc: Gary W. Stout, pal Corporation l