ML20078N694
| ML20078N694 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 10/14/1983 |
| From: | NRC |
| To: | |
| Shared Package | |
| ML20078N697 | List: |
| References | |
| TAC-52499, NUDOCS 8311020004 | |
| Download: ML20078N694 (4) | |
Text
' p a = e c.,
</
\\
UNITED STATES
[ ~.".,, I i NUCLEAR REGULATORY COMMISSION a
i WASHINGTON, D. C. 20555 1, 5. " ' !
.- y ALABAMA POWER COMPANY DOCKET NO. 50-348 JOSEPH M. FARLEY NUCLEAR PLANT, UNIT N0. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 34 License No. 'IPF-2 1.
The Nuclear Regulatory Commission (the Commission) nas found that:
A.
The application for amendment by Alabama Power Company (the licensee) dated October 11, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I:
B.
The facility will operate in confonnity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; I
D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the oublic; l
and l
E.
The issuance of this amendment is in acconJance with 10 CFR Part l
51 of the Connaission's regulations and all applicable requirements have been satisfied.
l l
1 l
8311020004 831014 fDRADOCK 05000348 l
1 4
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 34 TO FACILITY OPERATING LICENSE NO. NPF-2 DOCKET N0. 50-348 Revise Appendix A as follows:
RGmove Pages Insert Pages 3/4 3-56 3/4 3-56 3/4 3-55 3/4 3-55*
1 i
I f
- Included for convenience only I
I i
,, -, - -. -.. ~.
....,n.,,,,
~,.
n-,-
- - ~.,
-. - ~, ~..,., - ~ -.., -.. _ _.
O t
TABLE 3.3-10 (Continued)
==
h
=
E MINIMUM OPERABLE i'i INSTRUMENT CHANNEL SENSOR LOCATION CHANNELS
--e
. PSH-2853 G,H Recycle Evaporator Room El.121 ft.
1 I,J Corridor E1. 121 ft.
1 1
2.
Flooding Detectors i
a.
LSH 2828 A,B,C Main Steam Room El. 127 ft.
2 i
l b.
LSH 2829 A,B,C Main Steam Room El. 127 ft.
2 l
i w
Y m
m l
i 2
}
g
)
.b
=
\\
1
INSTRUMENTATION ACCIDENT MONITORING INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.8 The accident monitoring instrumentation channels shown in Table 3.3-11 shall be 0FERABLE.
APPLICABILITY: MODES 1, 2 and 3.
ACTION:
a.
With the namber of OPERABLE accident monitoring channels less than the Required Number of channels shown in Table 3.3-11, res+ ore the inoperatie channel to OPERABLE status within 7 days or be in at least H0T SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
b.
With the number of OPERABLE accident monitoring channels less than the Minimum Channels OPERABLE requirements of Table 3.3-11; restore the inoperable channel (s) to OPERABLE status within 48# hours or be in, at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
c.
The provisions of Specification 3.0.4 are not applicable.
SURVEILLANCE REQUIREMEMTS 4.3.3.8 Each accident monitoring instrumentation channel shall be demonstrated UPERABLE by performance of the CHANNEL CHECK and CHANNEL CALIBRATION operations at the frequencies shown in l
Table 4.3-7.
d+
- A one-time only change for Item 14 of Table 3.3-11 allows power operation to continue with one channel inoperable until the fifth refueling outage scheduled to begin during the January / February 1984 timeframe. During this period the provisions of Specification 3.0.5 are not applicable.
- A one-time only change for Item 14 of Table 3.3-11 allows power operation to continue with neither channel 0PERABLE for up to seven days until the fifth refueling outage scheduled to begin during the January / February 1984 timeframe.
s FARLEY-UNIT 1 3/4 3-56 Amendmen't No. 34
._, _