Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-16-767, Interim Deficiency Rept DR-142 Re Bellows Assembly of Relief Valve Supplied by Crosby Valve Co.Investigation Incomplete. Next Rept Will Be Submitted by 840329 + (04:26:38, 15 December 2024)
- ML20079J154 + (04:26:38, 15 December 2024)
- ML20079J151 + (04:26:39, 15 December 2024)
- ML20079J149 + (04:26:40, 15 December 2024)
- ML20079J148 + (04:26:40, 15 December 2024)
- ML20079J147 + (04:26:41, 15 December 2024)
- ML20079J141 + (04:26:42, 15 December 2024)
- ML20079J138 + (04:26:42, 15 December 2024)
- 05000301/LER-1982-010-03, /03L-0:on 821110,during Surveillance Test TS-11, Secondary Boric Acid Heat Tracing Circuits Found Inoperable. Caused by Internal Defect Which Tripped Breaker 1B52-429A. Breaker Replaced + (04:26:44, 15 December 2024)
- ML20079J136 + (04:26:45, 15 December 2024)
- 05000301/LER-1982-010, Forwards LER 82-010/03L-0 + (04:26:46, 15 December 2024)
- ML20079J133 + (04:26:46, 15 December 2024)
- ML20079J130 + (04:26:48, 15 December 2024)
- ML20079J127 + (04:26:48, 15 December 2024)
- ML20079J124 + (04:26:50, 15 December 2024)
- ML20079J122 + (04:26:51, 15 December 2024)
- ML20079J120 + (04:26:52, 15 December 2024)
- RBG-16-766, Interim Deficiency Rept DR-92 Re Category I Stainless Thermowells Supplied by Pyco,Inc.Investigation Incomplete. Next Rept Will Be Submitted by 840229 + (04:26:52, 15 December 2024)
- ML20079J118 + (04:26:53, 15 December 2024)
- ML20079J116 + (04:26:53, 15 December 2024)
- 05000346/LER-1982-060, Revised LER 82-060/03T-1:on 821111,during Steam & Feedwater Sys (SFS) Rupture Control Monthly test,48-volt Dc Power Supply in SFS Channel 2 Failed.Caused by Component Failure. Channel 2 re-energized + (04:26:54, 15 December 2024)
- ML20079J111 + (04:26:55, 15 December 2024)
- 05000260/LER-1982-037-03, /03L-0:on 821122,while Performing Local Leak Rate Tests During Refueling Outage,Total as-found Leakage from Primary Containment Found Greater than Allowable,Per Tech Spec 4.7.A.2.g.Caused by Deterioration of Valve Seating + (04:26:57, 15 December 2024)
- ML20079J105 + (04:26:58, 15 December 2024)
- ML20079J099 + (04:26:59, 15 December 2024)
- ML20079J095 + (04:27:03, 15 December 2024)
- ML20079J091 + (04:27:04, 15 December 2024)
- RBG-48012, Submittal of Emergency Implementing Procedure Revision + (04:27:04, 15 December 2024)
- ML20079J089 + (04:27:05, 15 December 2024)
- ML20079J090 + (04:27:05, 15 December 2024)
- 05000260/LER-1982-037, Forwards LER 82-037/03L-0 + (04:27:06, 15 December 2024)
- ML20079J087 + (04:27:06, 15 December 2024)
- 3F0184-20, Forwards Second Quarterly Progress Rept,Crystal River Studies & Plan of Study Summary Per Tech Specs,App B, Part Ii,Section 3.2,submitted to EPA + (04:27:07, 15 December 2024)
- ML20079J069 + (04:27:08, 15 December 2024)
- ML20079J072 + (04:27:08, 15 December 2024)
- ML20079J066 + (04:27:12, 15 December 2024)
- ML20079J063 + (04:27:13, 15 December 2024)
- ML20079J060 + (04:27:13, 15 December 2024)
- ML20079J051 + (04:27:14, 15 December 2024)
- ML20079J043 + (04:27:14, 15 December 2024)
- 05000316/LER-1983-123-03, /03L-0:on 831220,output from Bistable 2FB-512B Fluctuated at Trip & Reset Points.Cause Not Stated.Bistable Replaced + (04:27:16, 15 December 2024)
- NLS8400039, Responds to Re Use of Topical Rept Nedo 20566, GE Analytical Model for Loss-of-Coolant Analysis in Accordance W/10CFR50,App K. Rept Provides Basis for Analysis of Core Standby Cooling Sys & Initial LOCA + (04:27:17, 15 December 2024)
- ML20079J037 + (04:27:17, 15 December 2024)
- ML20079J035 + (04:27:18, 15 December 2024)
- 05000316/LER-1983-123, Forwards LER 83-123/03L-0 & LER 83-111/03X-1 + (04:27:22, 15 December 2024)
- ML20079J032 + (04:27:22, 15 December 2024)
- 0CAN018409, Forwards Documentation Supporting 831230 Request for Exemption from Requirement for full-scale Emergency Planning Exercise in 1984,per Region IV Emergency Planning Staff Request + (04:27:23, 15 December 2024)
- ML20079J027 + (04:27:23, 15 December 2024)
- ML20079J021 + (04:27:24, 15 December 2024)
- 05000346/LER-1982-062-03, /03L-0:on 821117,discharge Check Valve CV-186 Stuck During ST 5065.02,rendering Hydrogen Dilution Blower 1-1 Inoperable.Caused by Design/Fabrication Error.New Valve Installed + (04:27:26, 15 December 2024)
- 05000346/LER-1982-062, Forwards LER 82-062/03L-0 + (04:27:27, 15 December 2024)
- ML20079J001 + (04:27:31, 15 December 2024)