Washington Public Power Supply System /882 gg 0
Box 1223 Elma, Washington 98541 (206)482 4428 j7 pf,,
2'0 Docket No. 50-508 Sgf,
December 15, 1982 G03-82-1281 U. S. Nuclear Regulatory Commission, Region V Office of Inspection and Enforcement 1450 Maria Lane, Suite 260 Walnut Creek, California 94596-5368 Attention:
Mr. D. M. Sterr berg Chief, Reactor Projects Branch No. 1
Subject:
NRC INSPECTION AT WNP-3 IE REPORT NO. 50-508/82-19 ITEM OF NONCOMPLIANCE (50-508/82-19/01)
ABSENCE OF QA APPROVAL ON QUICK FIX PCP
Reference:
NRC Letter, Docket No. 50-508, Mr. D. M. Sternberg to Mr. R. S. Leddick, NRC Inspection at Washington Nuclear Project No. 3, dated November 15, 1982.
The referenced letter identified an item of noncompliance found as a result of the October 1-31, 1982 inspections conducted by W. G. Albert at WNP-3.
The Supply System hak received the A/E's response regarding the subject item; however, the additional review and investigation required to deter-mine the extent of the problem has not been completed, Specifically, an evaluation by Ebasco is in progress to determine if the problem was an isolated occurrence.
It is anticipated that this evaluation will be com-pleted by January, 1983. Upon ccmpletion of the Supply System review, a i
report of corrective / preventive actions and date of full compliance will be provided to your office by January 31, 1983.
Should you have any questions or desire further information, please contact me directly.
7 r
'h R. S. Leddick (760)
Program Director, WNP-3 DRC:nj cc:
J. Adams - NESCO D. Smithpeter - BPA Ebasco - New York WNP-3 Files - Richland i
i
[ 8212280121 821215
}
l PDR ADOCK 05000508 i
C PDR I-
--- _