Provides Final Status Rept of IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. Complete & Final Listings of Portions of Sys Failing to Meet FSAR Requirements Under Nutech Responsibility Encl
ML20079J120
Person / Time
Site: Dresden, Quad Cities, 05000000
Issue date: 12/17/1982
From: Rausch T
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-SSINS-6820 5609N, IEB-79-14, NUDOCS 8212280110
Download: ML20079J120 (3)


Text

_____

C ' - one First National Plaza, Chicago. Ilknois

,.,c' Commonwealth Edison

/

- h)

=

~

$(,/. Address Reply 12 Post Offico Box 76' 7 Chicago, lilinois 60690 December 17, 1982 Mr. James G. Keppler, Regional Administrator Directorate of Inspection and Enforcement - Region III U.S. Pluclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Dresden Station Units 2 and 3 Quad Cities Station Units 1 and 2 Final Status Report of I.E.

I j

Bulletin 79-14 Evaluations l

l NRC Docket Nos. 50-237, 50-249, 50-254, and 50-265 References (a):

J. G. 'Keppler letter to Cordell Reed dated July 14, -1982 (Confirmatory Action Lette r).

(b):

T. J. Rausch letter to J.

G.

Keppler dated October 1,1982.

Dear Mr. Keppler:

Item 3 o f the referenced Dresden Units 2 and 3 and Quad Cities Units 1 and 2 Confirmatory Action Letter (CAL) required Commonwealth Edison to identify to Region III portions of systems described in part 1 of the CAL which failed to meet FSAR require-ments.

An initial listing of these portions under NUTECH's responsibility was provided in Reference (b).

At that time it was misinterpreted that all of the analyses listed f ailed to meet FSAR criteria, which was not the case.

Provided in Attachments 1 and 2 to this letter are complete and final listings o f NUTECH portions which did not meet FSAR criteria.

Item 3 of the CAL is now considered complete.

Please address any questions you may have concerning this matter to this office.

Very truly yours, h

+%

[%4 Thomas J. Rausch Nuclea r Licensing Administrato r 1m Attachments cc:

Region III Inspector - Dresden

. Region III Inspector - Quad Cities f PDR ADOCK8212280110 821217 1

~

O PDR _

h@b2$g

[d //

05000237 pouin.

g<,

Dresden Station FSAR Discrepancies Nutech Nuclear Safe Shutdown Path Analyses Dresden-Unit 2 Dresden Unit 3 l

D2.04 (MK-1): LPCI C/D Suction D3.04 (MK-I): LPCI C/D Suction D2.09.1 (MK-I): LPCI C/D & Core Spray 03.09.1 (MK-I): LPCI'C/D & Core Spray D2.14.1 (MK-I): LPCI C/D Discharge D3.14.2 (79 14): LPCI C/D Discharge D2.14.2 (79-14): LPCI C/D Discharge 23110/3

, w:

Quad Cities Station FSAR Discrepancies Nutech Nuclear Safe Shutdown Path Analyses-

{

Quad Cities Unit _1 Quad Cities Unit 2 Ql.02 (MK-l): ECCS Suction Header Q2.02 (MK-I): ECCS Suction Header Ql.05 (MK-1): RHR A/B Suction Q2.05 (MK-I): RHR A/B Suction Ql.06 (MK-I): RHR C/D Suction Q2.11.2 (79-14): RHR C/D Discharge Ql.ll.1 (MK-I): RHR C/D Discharge Q2.11.3 (79-14): RHR C/D Discharge Ql.11.2 (79-14): RHR C/D Discharge i

l l