C ' - one First National Plaza, Chicago. Ilknois
,.,c' Commonwealth Edison
/
- h)
=
~
$(,/. Address Reply 12 Post Offico Box 76' 7 Chicago, lilinois 60690 December 17, 1982 Mr. James G. Keppler, Regional Administrator Directorate of Inspection and Enforcement - Region III U.S. Pluclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137
Subject:
Dresden Station Units 2 and 3 Quad Cities Station Units 1 and 2 Final Status Report of I.E.
I j
Bulletin 79-14 Evaluations l
l NRC Docket Nos. 50-237, 50-249, 50-254, and 50-265 References (a):
J. G. 'Keppler letter to Cordell Reed dated July 14, -1982 (Confirmatory Action Lette r).
(b):
T. J. Rausch letter to J.
G.
Keppler dated October 1,1982.
Dear Mr. Keppler:
Item 3 o f the referenced Dresden Units 2 and 3 and Quad Cities Units 1 and 2 Confirmatory Action Letter (CAL) required Commonwealth Edison to identify to Region III portions of systems described in part 1 of the CAL which failed to meet FSAR require-ments.
An initial listing of these portions under NUTECH's responsibility was provided in Reference (b).
At that time it was misinterpreted that all of the analyses listed f ailed to meet FSAR criteria, which was not the case.
Provided in Attachments 1 and 2 to this letter are complete and final listings o f NUTECH portions which did not meet FSAR criteria.
Item 3 of the CAL is now considered complete.
Please address any questions you may have concerning this matter to this office.
Very truly yours, h
+%
[%4 Thomas J. Rausch Nuclea r Licensing Administrato r 1m Attachments cc:
Region III Inspector - Dresden
. Region III Inspector - Quad Cities f PDR ADOCK8212280110 821217 1
~
O PDR _
h@b2$g
[d //
05000237 pouin.
g<,
Dresden Station FSAR Discrepancies Nutech Nuclear Safe Shutdown Path Analyses Dresden-Unit 2 Dresden Unit 3 l
D2.04 (MK-1): LPCI C/D Suction D3.04 (MK-I): LPCI C/D Suction D2.09.1 (MK-I): LPCI C/D & Core Spray 03.09.1 (MK-I): LPCI'C/D & Core Spray D2.14.1 (MK-I): LPCI C/D Discharge D3.14.2 (79 14): LPCI C/D Discharge D2.14.2 (79-14): LPCI C/D Discharge 23110/3
, w:
Quad Cities Station FSAR Discrepancies Nutech Nuclear Safe Shutdown Path Analyses-
{
Quad Cities Unit _1 Quad Cities Unit 2 Ql.02 (MK-l): ECCS Suction Header Q2.02 (MK-I): ECCS Suction Header Ql.05 (MK-1): RHR A/B Suction Q2.05 (MK-I): RHR A/B Suction Ql.06 (MK-I): RHR C/D Suction Q2.11.2 (79-14): RHR C/D Discharge Ql.ll.1 (MK-I): RHR C/D Discharge Q2.11.3 (79-14): RHR C/D Discharge Ql.11.2 (79-14): RHR C/D Discharge i
l l