Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080P874 + (13:49:00, 14 December 2024)
- ML20080P872 + (13:49:01, 14 December 2024)
- ML20080P871 + (13:49:02, 14 December 2024)
- BECO-LTR-95-026, Submits FFD Program Performance Data for Period of 940701- 1231 + (13:49:03, 14 December 2024)
- ML20080P869 + (13:49:03, 14 December 2024)
- 0CAN098310, Forwards Updated Radiological Effluent Tech Specs & Offsite Dose Calculation Manual,Per 830510 Request.Implementation Date of 850101 Established + (13:49:05, 14 December 2024)
- ML20080P864 + (13:49:05, 14 December 2024)
- ML20080P858 + (13:49:06, 14 December 2024)
- ML20080P855 + (13:49:06, 14 December 2024)
- 05000362/LER-1983-106-01, /01L-0:on 830907,surveillance Testing Resulted in Unsatisfactory Float Voltage for Pilot Cells 11 & 13 & Unsatisfactory Total Battery Terminal Voltage.Caused by Personnel Error + (13:49:08, 14 December 2024)
- 05000443/LER-1994-019, :on 940124,voluntary LER for Electrical Relay Failures Occurred.Caused by Damaged Roller Bearings on Relay Coil Assembly.Replaced All Installed GE Hea Relays W/Electroswitch LOR-1 + (13:49:11, 14 December 2024)
- RA-95-0037, Forwards Summary of Description of Proposed Vehicle Control Measures & Vehicle Bomb Comparison.Encl Withheld + (13:49:11, 14 December 2024)
- 05000361/LER-1983-075-03, /03L-0:on 830828,regulating Control Element Assembly Group 6 Exceeded Time Allowed for long-term steady-state Insertion Limit.Caused by Use of Assemblies to Control Axial Shape Index Oscillations + (13:49:13, 14 December 2024)
- ML20080P848 + (13:49:14, 14 December 2024)
- ML20080P847 + (13:49:15, 14 December 2024)
- 05000361/LER-1984-004, :on 840116,train a Containment Purge Isolation Sys Spuriously Actuated.Caused by Subgroup Relay Actuation Voltage Transient on ESF Bus.No Corrective Action Planned as Minor Transients Expected in Test + (13:49:16, 14 December 2024)
- 05000361/LER-1983-120-03, /03L-0:on 830829 & 31,flow Control Valve 2FV-0318 for Iodine Removal Sys Failed to Open & Declared Inoperable.Caused by Cracked O-ring Allowing High Pressure Oil to Leak to Low Pressure Side + (13:49:18, 14 December 2024)
- ML20080P842 + (13:49:19, 14 December 2024)
- ML20080P841 + (13:49:20, 14 December 2024)
- BECO-84-029, Forwards Rev 1 to GE BWR Supplemental Reload Licensing Submittal for Pilgrim Nuclear Power Station,Unit 1,Reload 6. Rev Corrects Error Noted on Page 13 Re Plant Response to MSIV Closure + (13:49:21, 14 December 2024)
- ML20080P834 + (13:49:21, 14 December 2024)
- ML20080P831 + (13:49:22, 14 December 2024)
- ML20080P829 + (13:49:22, 14 December 2024)
- ML20080P828 + (13:49:23, 14 December 2024)
- ML20080P822 + (13:49:25, 14 December 2024)
- ML20080P827 + (13:49:25, 14 December 2024)
- ML20080P817 + (13:49:26, 14 December 2024)
- ML20080P816 + (13:49:26, 14 December 2024)
- ML20080P808 + (13:49:28, 14 December 2024)
- ML20080P795 + (13:49:29, 14 December 2024)
- ML20080P797 + (13:49:29, 14 December 2024)
- GO2-95-037, Forwards Summary Description of Proposed Vehicle Control Measures as Required by 10CFR73.55(c)(7) & Results of Vehicle Bomb Comparison as Required by 10CFR73.55(c)(8). Encl Withheld + (13:49:30, 14 December 2024)
- ML20080P793 + (13:49:31, 14 December 2024)
- ML20080P789 + (13:49:31, 14 December 2024)
- ML20080P784 + (13:49:32, 14 December 2024)
- NRC-95-4410, Forwards Y-12 Technical Data Sheet 2.2.10, U-2 Molybdenum Alloy, in Response to RAI 210.121 of NRC + (13:49:32, 14 December 2024)
- ML20080P778 + (13:49:34, 14 December 2024)
- ML20080P783 + (13:49:34, 14 December 2024)
- ML20080P775 + (13:49:35, 14 December 2024)
- ML20080P773 + (13:49:36, 14 December 2024)
- PY-CEI-NRR-1919, Forwards Results of Vehicle Bomb Comparison & Vehicle Control Measures.Encl Withheld + (13:49:37, 14 December 2024)
- ML20080P768 + (13:49:38, 14 December 2024)
- ML20080P765 + (13:49:38, 14 December 2024)
- ML20080P763 + (13:49:41, 14 December 2024)
- ML20080P755 + (13:49:43, 14 December 2024)
- ML20080P758 + (13:49:43, 14 December 2024)
- U-602423, Annual Environ Operating Rept Jan-Dec 1994 + (13:49:44, 14 December 2024)
- ML20080P751 + (13:49:45, 14 December 2024)
- ML20080P746 + (13:49:45, 14 December 2024)
- DCL-95-046, Submits Summary Description of Proposed Vehicle Control Measures Per 10CFR73.55.Encl Withheld + (13:49:46, 14 December 2024)
- NRC-95-0018, Annual Operating Rept Jan-Dec 1994 for Fermi 2 + (13:49:46, 14 December 2024)
- ML20080P742 + (13:49:47, 14 December 2024)