Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20087P057 + (18:52:54, 13 December 2024)
- ML20087P053 + (18:52:55, 13 December 2024)
- ML20087P052 + (18:52:55, 13 December 2024)
- ML20087P049 + (18:52:57, 13 December 2024)
- ML20087P046 + (18:52:57, 13 December 2024)
- ML20087P040 + (18:52:58, 13 December 2024)
- 0CAN128304, Forwards Public Version of Amend 9 to Emergency Plan.W/O Encl.W/Jm Felton 840323 Release Memo + (18:52:59, 13 December 2024)
- ML20087P032 + (18:52:59, 13 December 2024)
- ML20087P029 + (18:53:00, 13 December 2024)
- ML20087P028 + (18:53:01, 13 December 2024)
- ML20087P025 + (18:53:01, 13 December 2024)
- ML20087P024 + (18:53:03, 13 December 2024)
- ML20087P023 + (18:53:04, 13 December 2024)
- ML20087P022 + (18:53:05, 13 December 2024)
- ML20087P020 + (18:53:06, 13 December 2024)
- ML20087P019 + (18:53:07, 13 December 2024)
- ML20087P007 + (18:53:08, 13 December 2024)
- ML20087P002 + (18:53:12, 13 December 2024)
- DCL-84-067, Forwards Response to NRC Request to Identify & Provide Basis for Acceptance of Welded ASTM A-325 Bolting in Pipe Support Design,Per 840119 Site Visit + (18:53:13, 13 December 2024)
- ML20087N999 + (18:53:15, 13 December 2024)
- ML20087N997 + (18:53:16, 13 December 2024)
- ML20087N996 + (18:53:17, 13 December 2024)
- ML20087N995 + (18:53:17, 13 December 2024)
- ML20087N994 + (18:53:18, 13 December 2024)
- ML20087N993 + (18:53:19, 13 December 2024)
- ML20087N988 + (18:53:20, 13 December 2024)
- ML20087N984 + (18:53:21, 13 December 2024)
- ML20087N983 + (18:53:22, 13 December 2024)
- NRC-84-0053, Forwards Justification for Interim Operation for Seismic Qualification of Model 581A Differential Pressure Indicating Switch Not Included in NSSS Qualification Program.Final Resolution of Issues Expected by June 1984 + (18:53:22, 13 December 2024)
- ML20087N980 + (18:53:23, 13 December 2024)
- ML20087N956 + (18:53:24, 13 December 2024)
- ML20087N973 + (18:53:24, 13 December 2024)
- B11094, Forwards marked-up Page to Draft SER Chapter 18.0, Human Factors Engineering, Correcting Errors Re Response Ltr & Commitment Dates + (18:53:25, 13 December 2024)
- ML20087N938 + (18:53:26, 13 December 2024)
- A03654, Forwards Amend 2 to Probabilistic Safety Study + (18:53:27, 13 December 2024)
- ML20087N932 + (18:53:27, 13 December 2024)
- ML20087N928 + (18:53:28, 13 December 2024)
- ML20087N926 + (18:53:29, 13 December 2024)
- ML20087N925 + (18:53:30, 13 December 2024)
- 05000285/LER-1984-002, :on 840303,during Scheduled Refueling Shutdown, Five Main Steam Safety Valves Failed to Lift within +/- 1% of Tech Specs.Caused by Normal Drift of Valve Setting.Test Revised + (18:53:32, 13 December 2024)
- 05000272/LER-1984-009, :on 840229,technical Discrepancy Confirmed by Bechtel in Design Elevation Calculations for Svc Water Intake Structure.Caused by Design Error.Design Change Will Be Made to Raise Level of Air Intake Louvers + (18:53:34, 13 December 2024)
- ML20087N916 + (18:53:36, 13 December 2024)
- ML20087N914 + (18:53:37, 13 December 2024)
- ML20087N910 + (18:53:38, 13 December 2024)
- ML20087N881 + (18:53:45, 13 December 2024)
- ML20087N876 + (18:53:46, 13 December 2024)
- ML20087N879 + (18:53:46, 13 December 2024)
- ML20087N874 + (18:53:50, 13 December 2024)
- ML20087N871 + (18:53:51, 13 December 2024)
- ML20087N869 + (18:53:52, 13 December 2024)
- ML20087N864 + (18:53:53, 13 December 2024)