Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B11170, Forwards Response to Auxiliary Systems Branch Draft SER Open Items ASB-10 & ASB-11 Re Control of Heavy Loads + (17:37:32, 13 December 2024)
- ML20091D452 + (17:37:32, 13 December 2024)
- ML20091D439 + (17:37:33, 13 December 2024)
- ML20091D437 + (17:37:34, 13 December 2024)
- PY-CEI-NRR-1467, Provides Update on Action Plan Re Suppression Pool Stainless Steel Cladding Sensitization Issue Outlined in 801006 Deviation Analysis Rept.Electrochemical Monitoring of Heat Affected Zones of Pool Welds Completed + (17:37:34, 13 December 2024)
- ML20091D426 + (17:37:35, 13 December 2024)
- ML20091D424 + (17:37:36, 13 December 2024)
- ML20091D416 + (17:37:36, 13 December 2024)
- ML20091D413 + (17:37:37, 13 December 2024)
- W3P84-1492, Forwards Response to 840518 Request for Addl Info Re Reactor Sys Branch Questions on Tech Specs,Including Reactor Protective Instrumentation Setpoints & RCS Process Variable Limiting Conditions for Operation + (17:37:38, 13 December 2024)
- NRC-84-0087, Forwards Amplification of Revised Response to Reactor Sys Branch Question 6 Re Pressurizer Level.Amplification of Response to Question 15 Will Be Forwarded Under Separate Cover + (17:37:39, 13 December 2024)
- ML20091D398 + (17:37:40, 13 December 2024)
- 05000370/LER-1992-002-06, :on 920305,train B Experienced Inadvertent Esfa.Caused by Defective Procedure & Inappropriate Actions. Personnel Counselled & Governing Procedure to Be Revised + (17:37:42, 13 December 2024)
- ML20091D387 + (17:37:43, 13 December 2024)
- ML20091D386 + (17:37:44, 13 December 2024)
- 05000354/LER-1992-004-01, :on 920308,during Design Change Implementation, Channel B ECCS Actuation Led to Engineered Safety Sys Actuation.Caused by Design Deficiency & Personnel Errors. Design Change Tested & Personnel Counselled + (17:37:45, 13 December 2024)
- BVY-92-055, Advises That Util Performed Rv Head Insp During Outage to Address Concerns Raised in GE SIL 539 & Discovered Possible Cracking in Cladding of RPV Head.No Evidence That Structural Integrity of RPV or Vessel Head Compromised.Evaluation Encl + (17:37:47, 13 December 2024)
- ML20091D379 + (17:37:48, 13 December 2024)
- ML20091D375 + (17:37:48, 13 December 2024)
- ML20091D373 + (17:37:49, 13 December 2024)
- 05000334/LER-1992-004, :on 920306,results of Formal Calculation Indicated Possibility of Degraded Diesel Generator Ventilation Sys.Caused by Design Deficiency During Original Plant Const.Fan Start Circuits Modified + (17:37:51, 13 December 2024)
- 05000412/LER-1992-002-01, :on 920305,alarm Received Indicating 480-volt Emergency Bus in Trouble.Caused by Ground on Bus Due to Internal Motor Fault.Fan Control Switch Placed in Lockout & Fan Motor Shipped to Vendor for Rewinding + (17:37:53, 13 December 2024)
- ML20091D368 + (17:37:55, 13 December 2024)
- ML20091D364 + (17:37:55, 13 December 2024)
- 05000282/LER-1992-004-01, :on 920306,discovered Failure to Perform Full Flow Test of turbine-driven Auxiliary Feedwater Pumps.Caused by Personnel Error.Comprehensive Review of Testing Requirements Being Conducted + (17:37:57, 13 December 2024)
- ML20091D319 + (17:37:59, 13 December 2024)
- ML20091D310 + (17:38:00, 13 December 2024)
- ML20091D299 + (17:38:00, 13 December 2024)
- ML20091D293 + (17:38:01, 13 December 2024)
- B14079, Discusses Region I Augmented Insp Team Insp Rept 50-336/91-81,concerning Failure of Moisture Separator Reheater Drain Line Elbow at Millstone Unit 2 on 911106 + (17:38:02, 13 December 2024)
- ML20091D291 + (17:38:02, 13 December 2024)
- ML20091D287 + (17:38:03, 13 December 2024)
- ML20091D275 + (17:38:04, 13 December 2024)
- ML20091D273 + (17:38:04, 13 December 2024)
- ML20091D271 + (17:38:06, 13 December 2024)
- ML20091D262 + (17:38:07, 13 December 2024)
- ML20091D261 + (17:38:08, 13 December 2024)
- ML20091D257 + (17:38:10, 13 December 2024)
- ML20091D256 + (17:38:12, 13 December 2024)
- ML20091D225 + (17:38:13, 13 December 2024)
- RBG-17-875, Forwards Rev 12 to FSAR (Filed in PDR Category K) & Environ Qualification Document (Filed in PDR Category a) + (17:38:13, 13 December 2024)
- ML20091D224 + (17:38:14, 13 December 2024)
- AECM-84-0310, Withdraws Listed Proposed Tech Specs.Items Will Be Resubmitted by Process Outlined in T Novak + (17:38:15, 13 December 2024)
- ML20091D223 + (17:38:15, 13 December 2024)
- ML20091D218 + (17:38:16, 13 December 2024)
- B11180, Forwards Revised Responses to Power Sys Branch Mechanical Series Questions.Responses Consist of marked-up FSAR Pages + (17:38:17, 13 December 2024)
- ML20091D206 + (17:38:18, 13 December 2024)
- ELV-03618, Comment Supporting Proposed Rule 10CFR2 Re Policy & Procedure for Enforcement Actions + (17:38:19, 13 December 2024)
- ML20091D177 + (17:38:19, 13 December 2024)
- ML20091D176 + (17:38:20, 13 December 2024)
- ML20091D173 + (17:38:21, 13 December 2024)