Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20091P597 + (16:47:47, 13 December 2024)
- ML20091P594 + (16:47:48, 13 December 2024)
- ML20091P593 + (16:47:49, 13 December 2024)
- ML20091P590 + (16:47:49, 13 December 2024)
- ML20091P589 + (16:47:51, 13 December 2024)
- TXX-3618, Forwards Analysis of Intermediate Cover Size 3 Inch,Type JHF,11 - Stage Pacific Pump Safety Injection Svc, Per 840414 10CFR50.55(e) Rept + (16:47:54, 13 December 2024)
- ML20091P586 + (16:47:55, 13 December 2024)
- ML20091P579 + (16:47:56, 13 December 2024)
- ML20091P576 + (16:47:57, 13 December 2024)
- ML20091P578 + (16:47:57, 13 December 2024)
- ML20091P567 + (16:47:59, 13 December 2024)
- ML20091P572 + (16:47:59, 13 December 2024)
- ML20091P565 + (16:48:00, 13 December 2024)
- ML20091P562 + (16:48:01, 13 December 2024)
- ML20091P557 + (16:48:01, 13 December 2024)
- ML20091P553 + (16:48:02, 13 December 2024)
- 05000348/LER-1991-012, :on 911229,discovered That RHR Suction Valve Automatic Isolation Test Did Not Include Verification That RCS Suction Valves Could Be Opened from Control Board.Caused by Procedural Inadequacies.Procedure Revised + (16:48:05, 13 December 2024)
- ML20091P548 + (16:48:06, 13 December 2024)
- ML20091P546 + (16:48:07, 13 December 2024)
- ML20091P542 + (16:48:08, 13 December 2024)
- 05000251/LER-1984-006-01, :on 840505,during Scheduled Refueling Outage, Actuation of Bus Stripping Relays Occurred on 4 Kv Bus. Caused by Personnel Accidentally Jarring or Shorting Electrical Auxiliary Contact Pair + (16:48:10, 13 December 2024)
- ML20091P540 + (16:48:12, 13 December 2024)
- ML20091P536 + (16:48:14, 13 December 2024)
- ML20091P533 + (16:48:16, 13 December 2024)
- ML20091P530 + (16:48:17, 13 December 2024)
- W3P84-1607, Suppls & Discusses R Beker Concerns Re Questions 640.17-22.FSAR Changes Which Will Be Implemented in Future Amend Per 10CFR50.71(e) Requirements + (16:48:18, 13 December 2024)
- 05000416/LER-1984-028, :on 840507,during Storm,Arcing Occurred Across Open Disconnect for 500 Kv Switchyard Breaker,Causing Loss of Power Which Resulted in Reactor Water Cleanup Reactor Isolation.Plant Shut Down + (16:48:20, 13 December 2024)
- 05000327/LER-1984-033, :on 840511,automatic Reactor Trip on lo-lo Level Experienced in Steam Generator 2 Following Turbine Trip.Caused by Broken Linkage on Steam Dump Valve 1-FCV-1-107.Linkage Replaced + (16:48:23, 13 December 2024)
- 05000305/LER-1984-010, :on 840507,during Power escalation,lo-lo Level Setpoint Reached in Steam Generator 1B,initiating Reactor Trip.Caused by Operator Attempting to Stabilize Level Oscillation.No Corrective Actions Necessary + (16:48:25, 13 December 2024)
- ML20091P500 + (16:48:26, 13 December 2024)
- ML20091P495 + (16:48:26, 13 December 2024)
- 05000369/LER-1984-015, :on 840426,during Performance of Rod Control Cluster Assembly Drop Timing,Rod B-12 Failed to Indicate Correct Position.Caused by Defective Detector/Encoder Card. Card Replaced & Drop Timing Completed + (16:48:28, 13 December 2024)
- ML20091P488 + (16:48:29, 13 December 2024)
- ML20091P485 + (16:48:32, 13 December 2024)
- ML20091P484 + (16:48:32, 13 December 2024)
- ML20091P473 + (16:48:33, 13 December 2024)
- ML20091P472 + (16:48:35, 13 December 2024)
- ML20091P466 + (16:48:37, 13 December 2024)
- ML20091P468 + (16:48:37, 13 December 2024)
- ML20091P464 + (16:48:39, 13 December 2024)
- ML20091P465 + (16:48:39, 13 December 2024)
- ML20091P461 + (16:48:41, 13 December 2024)
- ML20091P456 + (16:48:42, 13 December 2024)
- ML20091P460 + (16:48:42, 13 December 2024)
- ML20091P452 + (16:48:43, 13 December 2024)
- ML20091P445 + (16:48:47, 13 December 2024)
- ML20091P440 + (16:48:56, 13 December 2024)
- ML20091P431 + (16:49:04, 13 December 2024)
- ML20091P427 + (16:49:04, 13 December 2024)
- ML20091P424 + (16:49:06, 13 December 2024)
- 05000373/LER-1995-005-06, :on 950208,discovered That Samples of Diesel Fuel Required by TS 4.8.1.1.2.c.2 Not Taken Due to Failure to Properly Implement Changes to TS 4.8.1.1.2.c.2 Sampling Requirements.Sampling Procedures Revised.W/O Ltr + (16:49:11, 13 December 2024)