. - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ - _ _ _ _ _
U y
i i
DeneW C. Shelton 300 Ma$sen Amue Vce PreWor0 Nuclear bledo OH 43%2K101 D a tonne (419)249 2300 Docket Number 50-346 i
?
License Number NPF-3
[
I serial Number 2009 January 28, 1992 United States Nuclent Regulatory Commission l
Document Control Desk f
Vashington, D. C.
20555 Subjects Davis-Desse Nuclear Pover Station Reactor Containment-Building Integrated Leak Rate Test Summary Report
(.entlement In accordance with IDCFR50 Appendix J, Paragraph V.B. enclosed is the Reactor Containment Building Integrated Leak Rate Test report for the i
Davis-Besse Nuclear Power Station, Unit Number 1 Reactor containment i
Building.
The results of the test show that the actual measured i
containment vessel leakage, when the containment essel is pressurized
'to the peak enlculated accident pressure, is less than 75 percent of the maximum allovable leakage assumed in the safety analysis.
Should further information be required, please contact Mr. R. V. Schrauder, Manager - Nuclear Licensing, at (419) 249-2366.
t Very trulv yours,
' C:=3 PVS/dlm Enclosure o
cci
'A.-B. Davis, Regional Administrator, NRC Region III I
L J. B.'Hopkins.-NRC Senior Project Manager V. Levis, DB-1-NRC Senior Resident Inspector i.
-Utility Radiological Safety Board 9202030175-920128 I
PDR ADOCK 05000346 hl l
-p PDR l