Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000247/LER-1984-005, :on 840602,during Refueling Outage,Msivs MS-1-21 & MS-1-24 Failed to Close within 5 S,Per Tech Specs. Caused by Packing Friction Resulting from Shaft Lubricant Loss.Valves Will Be Overhauled + (15:51:21, 13 December 2024)
- ML20092P291 + (15:51:22, 13 December 2024)
- ML20092P286 + (15:51:23, 13 December 2024)
- ML20092P289 + (15:51:23, 13 December 2024)
- ML20092P285 + (15:51:24, 13 December 2024)
- ML20092P284 + (15:51:25, 13 December 2024)
- ML20092P283 + (15:51:26, 13 December 2024)
- ML20092P280 + (15:51:27, 13 December 2024)
- ML20092P279 + (15:51:28, 13 December 2024)
- ML20092P278 + (15:51:29, 13 December 2024)
- ML20092P273 + (15:51:29, 13 December 2024)
- AECM-84-0323, Forwards Suppl to Monthly Operating Rept for May 1984 & Revs 2 & 3 to Offsite Dose Calculation Manual, Describing Change to Radwaste Treatment Sys + (15:51:30, 13 December 2024)
- ML20092P267 + (15:51:31, 13 December 2024)
- ML20092P264 + (15:51:31, 13 December 2024)
- 05000280/LER-1984-013, :on 840601,w/RCS Solid,At 145 F & 325 Psig,Porv Cycled in Response to Overpressure Condition While Placing Charging Sys in Svc.Caused by Personnel Error + (15:51:34, 13 December 2024)
- NRC-84-0100, Forwards Addl Qualification Testing Info for Class IE/non- Class IE Devices Used in Core Cooling Monitor Sys,Per License Condition 9(c) of License NPF-25.Safe Operation at Rated Full Power Assured + (15:51:35, 13 December 2024)
- ML20092P257 + (15:51:36, 13 December 2024)
- ML20092P260 + (15:51:36, 13 December 2024)
- ML20092P253 + (15:51:37, 13 December 2024)
- ML20092P252 + (15:51:38, 13 December 2024)
- ML20092P249 + (15:51:38, 13 December 2024)
- 05000219/LER-1984-012, :on 840604,emergency Diesel Generator 1 Day Tank Level High/Low Alarm Received.Generator 1 Shut Down, Resulting in Both Emergency Diesel Generators Inoperable Simultaneously.Caused by Repositioned Switch + (15:51:40, 13 December 2024)
- ML20092P247 + (15:51:41, 13 December 2024)
- ML20092P246 + (15:51:42, 13 December 2024)
- ML20092P245 + (15:51:42, 13 December 2024)
- ML20092P244 + (15:51:43, 13 December 2024)
- ML20092P243 + (15:51:44, 13 December 2024)
- ML20092P242 + (15:51:45, 13 December 2024)
- ML20092P241 + (15:51:45, 13 December 2024)
- ML20092P239 + (15:51:46, 13 December 2024)
- ML20092P238 + (15:51:47, 13 December 2024)
- ML20092P234 + (15:51:47, 13 December 2024)
- ML20092P227 + (15:51:48, 13 December 2024)
- W3P84-1811, Agrees to Complete Continuing Study of Single Failures of Control Sys & Correct Resulting Deficiencies Prior to Startup Following First Refueling.Action Should Close Out SER Open Item 7.1.2(6) + (15:51:49, 13 December 2024)
- ML20092P225 + (15:51:49, 13 December 2024)
- ML20092P220 + (15:51:51, 13 December 2024)
- ML20092P221 + (15:51:51, 13 December 2024)
- ML20092P218 + (15:51:52, 13 December 2024)
- ML20092P216 + (15:51:53, 13 December 2024)
- ML20092P211 + (15:51:54, 13 December 2024)
- ML20092P210 + (15:51:54, 13 December 2024)
- ML20092P209 + (15:51:55, 13 December 2024)
- ML20092P208 + (15:51:56, 13 December 2024)
- ML20092P205 + (15:51:56, 13 December 2024)
- ML20092P204 + (15:51:57, 13 December 2024)
- AECM-84-0181, Responds to NRC Re Violations Noted in IE Insp Repts 50-416/84-01 & 50-417/84-02.Corrective Actions: Emergency Plan Procedure 10-S-01-05, General Emergency, Revised + (15:51:58, 13 December 2024)
- 05000280/LER-1984-015, :on 840613,control Room Operator Observed Loss of Main Feed Pump a & Lowering of Steam Generator Water Levels.Caused by Loosening of Bearing Capscrews.Capscrew & Bolt Torque Specified in Maint Procedure + (15:52:00, 13 December 2024)
- AECM-84-0127, Responds to NRC Re Violations Noted in IE Insp Repts 50-416/84-01 & 50-417/84-02.Corrective Actions:Rev to Emergency Plan Procedure 10-S-01-05, General Emergency, Prepared for Issuance by 840615 + (15:52:01, 13 December 2024)
- ML20092P182 + (15:52:01, 13 December 2024)
- W3P84-1805, Forwards Proposed FSAR Chapter 14 Changes Re Venting of Sys During Hydrostatic Testing & Testing of nonsafety-related Supplementary Chilled Water Sys.Changes Will Be Incorporated in Future FSAR Amend + (15:52:02, 13 December 2024)
- ML20092P177 + (15:52:03, 13 December 2024)