6 DUKE POWER GOMPANY P.O. HOX 33180 CHARLOTTE, N.C. 28242 "2 "; "2" MT;"1 July 3, 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414
Dear Mr. Denton:
Mr. T. M. Novak's letter of May 25, 1984 transmitted the " Draft" Catawba Unit 1 Technical Specifications. Subsequent letters dated June 8 and 22,1984 trans-mitted a number of revised specifications.
As shown by Attachment 1, the Catawba Unit 1 Technical Specifications have been under development for over three years. The development process began soon after the McGuire Unit 1 Technical Specifications were issued on January 23, 1984.
Drafts of Catawba Unit 1 Technical Specifications were distributed for review by the station, the Design Engineering Department and Westinghouse.
NRC/ Region II and NRC/0NRR's Reactor Systems Branch and Instrumentation and Control Systems Branch have each conducted reviews of the Catawba Unit 1 Technical Specifications.
As noted in Mr. Novak's letter, certain items are still under review. A number of proposed revisions have been submitted by Duke Power for inclusion in the Catawba Unit 1 Technical Specifications but have not been included in a formal response from the staff. These include letters dated June 25 (3 letters),
June 28,andJune29(2 letters),1984. Additional items submitted prior to these-letters are listed in Attachment 2.
Based on the extensive preparation and review effort that has gone into the development of the Catawba Unit 1 Technical Specifications, Duke Power Company certifies that, to the best of our knowledge, the " Draft" Catawba Unit 1 Technical Specifications, as revised and subject to incorporation of those items iden"fied above, accurately reflect the as-built plant and the Catawba FSAn.
Furthermore, we are not aware of any conflicts between the
" Draft" Catawba Unit 1 Technical Specifications and the NRC staff's SER analyses.
Very truly yours,
?*
W E.c Q.
H. B. Tucker t
ROS/rbs 8407060072 840703 PDR ADOCK 05000413 Attachme'nt A
PDR 8
1
' I d
'Mr.. Harold R. D:nton, Director J.luly. 3,1984 -
Pagm'2-cc: Mr. James P. O'Reilly, Regional Administ:rator U. S. N'iclear Regulatory Commission
. Region II 101 14arietta Street, NW, Suite 2900 Atlanta, Georgia -30323 NRC Resident Inspector Catawba Nuclear Station Mr. Robert Guild, Esq.
Attorney-at-Law P. 0. Box 12097
. Palmetto Alliance
~
21351 Devine Street Columbia, South Carolina 29205-Mr. Jesse L. -Riley Carolina Environmental Study Group 854 Henley Place Charlotte, North Carolina 28207 l
j l
J
Mr. Harold R. Denton, Dir:ctor July 3, 1984 Paga 3 HAL B. TUCKER, being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this Certification of the Catawba Unit 1 Technical Specifications, and that all statements end matters set forth therein are true and correct to the best of his knowltJge.
d
~Hal B. Tucker, Vice President Subscribed and sworn to before me this 3rd day of July,1984.
Cd
~
Ad
~"
Notary Public My Commission Expires:
f~
f I
i 4
r
ATTA0fBT 1 CATAWBA TE0f1ICAL S KCIFICATIONS MILESTONES ttGUIRE UNIT 1 TECH SPECS ISSUED 1/23/81 CATAWBA TECH SKCS DISTRIBUTED FOR REVIEW BY 4/30/81 WESTINGHOUSE, CNS, AND DESIGN ENGINEERING INITIAL REVIBi C0ftENTS FR0ii hESTINGH00SE 7/22/81 CATAWBA TECH SRCS DISTRIBUTED FOR INTERNAL USE ORIGINAL 10/19/82 REV. 1 1/4/83 REV. 2 3/11/83 REV. 3 8/19/83 FcGUIRE UNITS 1 AND 2 TECH S ECS ISSUED 3/3/83 PROPOSED CATAWBA TECH SKCS StBilTTED FOR NRC 5/20/83 REVIEW NRC'S FIRST DRAFT OF CATAWBA TECH S CS DISTRIBlRED 12/7/83 FOR NRC STAFF REVIB4 NRC SITE VISIT TO DISCUSS CATAWBA TECH SRCS 2/6-8/84 CATAWBA PROOF AND REVIEW TECH SRCS ISSLED 3/84 NRC/ REGIONS II AUDIT OF CATAWBA TECH S KCS 3/26-30/84 i
WETING Willi RSB & ICSB ON CATAWBA TECH SKCS 5/18/84 6/13/84 CATAWBA DRAFT TECH S K CS ISSUED 5/25/84 6/8/84 6/22/84
ATTACHMENT 2 Catawba Nuclear Station - Unit 1 Draft Technical Specifications Outstanding Change Requests Specification Description Date Submitted 3/4.7.12 Deletion of Area Temperature Monitoring 6/5/84 3'4.3.4 Deletion of Applicability in Modes 2 6/5/84 and 3 for Turbine Overspeed Protection 3/4.1.1.1 Boron Dilution 6/7/84 3/4.1.1.2 6/21/84 3/4.7.14 Standby Shutdown System 6/5/84 6/28/84 3/4.8.1 Diesel' Generator expection 4/4/84 B3/4.1.3
' Movable control assemblies, Digital Rod Position System 3.4.6.2 Operational Leakage (deletion of ND 5/4/84 valves, total leakage) 6/28/84 3.7.8 Snubbers-6/20/84 3.3.3.6 Radiation Monitoring-6/20/84 Table 3.3-10 Nomenclature 4
m__