|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217F9921999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20216E4881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Grand Gulf Nuclear Station.With ML20211A6921999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20209G0691999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20196A1161999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Grand Gulf Nuclear Station.With ML20206Q4831999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Grand Gulf Nuclear Station Unit 1.With ML20205P8771999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20207K5141999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20206R9501998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20198E2481998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20195F4801998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20154K2391998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Grand Gulf Nuclear Station Unit 1.With ML20153B2161998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20237B6661998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Grand Gulf Nuclear Station,Unit 1 ML20236R0231998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Grand Gulf Nuclear Station,Unit 1 ML20249B1251998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Grand Gulf Nuclear Station,Unit 1 ML20247F3591998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Grand Gulf Nuclear Plant,Unit 1 ML20217A0291998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Grand Gulf Nuclear Sation,Unit 1 ML20216J2021998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Grand Gulf Nuclear Station,Unit 1 ML20203A2891998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Grand Gulf Nuclear Station ML20198P1121997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Grand Gulf Nuclear Station,Unit 1 ML20203K4031997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Grand Gulf Nuclear Station,Unit 1 ML20199K0611997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Grand Gulf Nuclear Station,Unit 1 ML20198J8911997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Grand Gulf Nuclear Station,Unit 1 ML20210V0621997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for GGNS ML20210K5671997-07-31031 July 1997 Monthly Operating Rept for July 1997 for GGNS ML20149K0621997-06-30030 June 1997 Monthly Operating Rept for June 1997 for GGNS ML20148L2591997-05-31031 May 1997 Monthly Operating Rept for May 1997 for GGNS Unit 1 ML20141E3541997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Grand Gulf Nuclear Station Unit 1 ML20137X7881997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Grand Gulf Nuclear Station,Unit 1 ML20147E6201997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Grand Gulf Nuclear Station,Unit 1 ML20134Q2281997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Grand Gulf Nuclear Station,Unit 1 ML20133M1111996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Grand Gulf Nuclear Station,Unit 1 ML20132H1281996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Grand Gulf Nuclear Station Unit 1 ML20134M0571996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Grand Gulf Nuclear Station Unit 1 ML20129B6881996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Grand Gulf Nuclear Station Unit 1 ML20117P2621996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Grand Gulf Nuclear Station ML20116N1851996-07-31031 July 1996 Monthly Operating Rept for July 1996 for GGNS Unit 1 ML20115H0661996-06-30030 June 1996 Monthly Operating Rept for June 1996 for GGNS ML20112J1881996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Grand Gulf Nuclear Station Unit 1 ML20111B2381996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Grand Gulf Nuclear Station Unit 1 ML20106J8921996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Grand Gulf Nuclear Station Unit 1 ML20106H0851996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Grand Gulf Nuclear Station,Unit 1 ML20100G8641996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for GGNS Unit 1 ML20096E6261995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Grand Gulf Nuclear Station Unit 1 ML20095F4051995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Grand Gulf Nuclear Station ML20094L0531995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for GGNS Unit 1 ML20093E6211995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Grand Gulf Nuclear Station ML20087K0011995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Grand Gulf Nuclear Station ML20086K0371995-06-30030 June 1995 Monthly Operating Rept for June 1995 for Grand Gulf Nuclear Station Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217F9921999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20212F5641999-09-23023 September 1999 SER Concluding That All of ampacity-related Concerns Have Been Resolved & Licensee Provided Adequate Technical Basis to Assure That All of Thermo-Lag Fire Barrier Encl Cables Operating within Acceptable Ampacity Limits ML20211Q3171999-09-0909 September 1999 Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996 ML20216E4881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Grand Gulf Nuclear Station.With ML20211A6921999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20209J1961999-07-12012 July 1999 Special Rept 99-001:on 990528,smoke Detectors Failed to Alarm During Performance of Routine Channel Functional Testing.Applicable TRM Interim Compensatory Measure of Establishing Roving Hourly Fire Patrol Was Implemented ML20196K4981999-07-0101 July 1999 Safety Evaluation Authorizing PRR-E12-01,PRR-E21-01, PRR-P75-01,PRR-P81-01,VRR-B21-01,VRR-B21-02,VRR-E38-01 & VRR-E51-01.Concludes That Alternatives Proposed by EOI Acceptable ML20209G0691999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20196A1161999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Grand Gulf Nuclear Station.With ML20206Q4831999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Grand Gulf Nuclear Station Unit 1.With ML20206J1201999-04-30030 April 1999 Redacted ME-98-001-00, Pressure Locking & Thermal Binding Test Program on Two Gate Valves with Limitorque Actuators ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205P8771999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20207K5141999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20206T7991999-01-31031 January 1999 Iodine Revolatizitation in Grand Gulf Loca ML20207A8301998-12-31031 December 1998 1998 Annual Operating Rept for Ggns,Unit 1 ML20206R9501998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20206D7721998-12-31031 December 1998 South Mississippi Electric Power Association 1998 Annual Rept ML20198E2481998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20195F4121998-11-13013 November 1998 Rev 16 to GGNS-TOP-1A, Operational QA Manual (Oqam) ML20195C4841998-11-0606 November 1998 SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program ML20195C2791998-11-0505 November 1998 BWR Feedwater Nozzle Inservice Insp Summary Rept for GGNS, NUREG-0619-00006 ML20195F4801998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20155C1351998-10-26026 October 1998 Rev B to Entergy QA Program Manual ML20154K2391998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Grand Gulf Nuclear Station Unit 1.With ML20155F1961998-09-0101 September 1998 Engineering Rept for Evaluation of BWR CR Drive Mounting Flange Cap Screw ML20153B2161998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20237B6661998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Grand Gulf Nuclear Station,Unit 1 ML20236R0231998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Grand Gulf Nuclear Station,Unit 1 ML20155J0811998-05-31031 May 1998 10CFR50.59 SE for Period Jan 1997 - May 1998 ML20249B1251998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Grand Gulf Nuclear Station,Unit 1 ML20248B6261998-05-11011 May 1998 Rev 6 to Grand Gulf Nuclear Station COLR Safety-Related ML20217Q6701998-05-0606 May 1998 SER Approving Proposed Postponement of Beginning Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) at Grand Gulf for Circumferential Shell Welds for Two Operating Cycles ML20206J1271998-04-30030 April 1998 Pressure Locking Thrust Evaluation Methodology for Flexible Wedge Gate Valves ML20247F3591998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Grand Gulf Nuclear Plant,Unit 1 ML20217M8951998-04-30030 April 1998 QA Program Manual ML20217P8281998-04-0707 April 1998 Safety Evaluation Accepting Relief Authorization for Alternative to Requirements of ASME Section Xi,Subarticle IWA-5250 Bolting Exam for Plants,Per 10CFR50.55a(a)(3)(i) ML20217P0381998-04-0606 April 1998 Safety Evaluation Supporting Amend 135 to License NPF-29 ML20217A0291998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Grand Gulf Nuclear Sation,Unit 1 ML20216J4211998-03-18018 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Grand Gulf Nuclear Station ML20216J2021998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Grand Gulf Nuclear Station,Unit 1 ML20203A2891998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Grand Gulf Nuclear Station ML20247B4111997-12-31031 December 1997 1997 Annual Financial Rept for South Mississippi Electric Power Association ML20203H9741997-12-31031 December 1997 1997 Annual Operating Rept, for Ggns,Unit 1 ML20198P1121997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Grand Gulf Nuclear Station,Unit 1 ML20203B5581997-12-0404 December 1997 Special Rept 97-003:on 971111,valid Failure of Div 2 EDG Occurred,Due to Jacket Water Leak.Failure Reported,Per Plant Technical Requirements Manual Section 7.7.2.2 ML20203K4031997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Grand Gulf Nuclear Station,Unit 1 ML20199H3711997-11-19019 November 1997 SER Accepting Approving Request Relief from Requirements of Section XI, Rule for Inservice Insp of NPP Components, of ASME for Current or New 10-year Inservice Insp Interval IAW 50.55(a)(3)(i) of 10CFR50 ML20199F3431997-11-18018 November 1997 SER Accepting Rev 15 of Operational Quality Assurance Manual for Grand Gulf Nuclear Station,Unit 1 1999-09-09
[Table view] |
Text
r Attachment 1 to AECM-84/0323 ,
Page 1 of 2 OPERATING DATA REPORT SUPPLEMENTAL INFORMATION MAJOR CHANGES TO RADIOACTIVE WASTE TREATMENT SYSTEMS Design Change Package (DCP) 84/4074, Radwaste Trans'fer Lines from Liquid Radwaste to Vendor Connection Station.
A. Summary of 10 CFR 50.59 Considerations The probability of an occurrence or the consequence of an accident or.
malfunction of equipment important to safety previously evaluated in the Final Safety Analysis Report will not be increased because: The design change as described below, does not affect any direct safety function or system important to safety, previously evaluated in the FSAR.
Therefore, the probability of an occurrence or the consequence of a malfunction of equipment important to safety will not be increased. The postulated worst case failures (radwaste tank rupture and piping leaks) analyzed in FSAR sections 15.7.2 and 15.7.3 envelope the occurrence and consequence of postulated accidents due to this design change.
Therefore, the probability of an occurrence or the consequence of an accident will not be increased.
The possibility for an accident or malfunction of a different type than those previously evaluated in the Final Safety Analysis Report will not be created because: All potentially radioactive portions of the transfer line system are located within the radwaste building and designs were developed in accordance with the related' guidance in Branch Technical Position ETSB 11-1 of NRC Standard Review Plan 11.2.
Therefore, use of the radwaste transfer line system will not result in releases which differ from those previously predicted in FSAR sections 15.7.2 and 15.7.3 nor will there be a change to the maximum exposure to an individual in the unrestricted area.
The margin of safety, as defined in the basis for the Technical Specifications will not be reduced because: The design change does not change the limiting conditions for operation, applicability, actions, or surveillance requirements as' defined in the basis for Technical Specifications 3/4.11.1, 3/4.11.3, 6.12, 6.13, and 6.15.
B. Reason for Change In an effort to develop an efficient and reliable system for processing radwaste at Grand Gulf Nuclear Station (GGNS), the liquid radwaste transfer lines, as described below, will provide the capability to install mobile / portable filtration equipment to~ facilitate maintenance outages, unusually large waste volumes, and emergency operations. The transfer lines will also provide testing capabilities for alternative state-of-the-art filtration equipment and future system enhancements.
~
0407060130 840703 PDR ADOCK 05000416 R pm _
etQdbl-
Attachment I to AECM-84/0323 Page 2 of 2 C. Detailed Description of Change This DCP requires modification of the existing liquid radwaste (017) system at GGNS, such that process piping can be used for transferring liquid radwaste directly to a vendor filtration processing station located in the radwaste building rail / truck bay. Liquid waste can be transferred from the floor drain collector tank, the equipment drain collector tanks, and the waste surge tanks. The modifications can provide a permanent alternate filtration capability regardless of future modifications to the liquid radwaste system.
D. Response to GGNS Technical Specificaiton 6.15, (1.d), (1.e), (1.f), and (1.g).
Since this change involves only interface piping for transfer of liquid radwaste and does not impact waste processing capabilities (except to increase flexibility) or effluent releases, predicted releases of radioactive materials in liquid and gaseous effluents and/or solid waste quantities should not differ as a result of this change. Accordingly, expected maximum exposures to an individual in the unrestricted area and to the general population are also unaffected by this change. Since all of the transfer piping is contained within the radwaste building,-any potential for radiological consequences due to spills'is encompassed by the existing, and still limiting, tank failure analyses presented in the FSAR. Pipe routing is consistent with the design radiation zones and ALARA principles such that no additional exposure to plant operating personnel is anticipated as a result of this change.
4 I
etQdb2'