%s EDISON Docket No. 50-346 Rcmoo p. cnouse va emm License No. NPF-3 L4191259-5221 Serial No. 1058 June 29, 1984 Director of Nuclear Reactor Regulation Attention:
Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Stolz:
This is in response to your letter dated April 23, 1984, (Log No. 1497) concerning response to Generic Letter 81 Natural Circulation Cool-down. Toledo Edison was requested to provide a schedule for requested information to assure that the intent of Generic Letter 81-21 is met for Davis-Besse Nuclear Power Station Unit 1.
Toledo Edison is a member of the B&W Owner's Analysis Subcommittee. They meet in early June and will develop a position on Natural Circulation Cooldown. The report will address the cooldown rate for both lower and raised loop B&W plants. The owner group position will be submitted by the owner's group or the individual utility in September.
Toledo Edison will either endorse the submitted report or submit it separately by the end of September, 1984.
Very truly yours, f/h _ v_
RPC: GAB:tmf cc: DB-1 NRC Resident Inspector 8407060giy4M k PDR ADO PDR P