Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20095B024 + (13:51:23, 13 December 2024)
- ML20095B016 + (13:51:24, 13 December 2024)
- ML20095B019 + (13:51:24, 13 December 2024)
- ML20095B014 + (13:51:25, 13 December 2024)
- 2CAN049207, Requests Approval of 920330 & 0410 Applications for Amend to License NPF-6,changing TS Re Sleeving Process for SG Tube Repair.Approval Requested by 920425 to Allow Entry Into Operating Mode 4 (Hot Shutdown) + (13:51:26, 13 December 2024)
- ML20095B008 + (13:51:26, 13 December 2024)
- DCL-92-085, Forwards Response to NRC Re Violations Noted in Insp Repts 50-275/92-02 & 50-323/92-02 Concerning Failure to Properly Search Individual at Access Control Point to Protected Area.Response Withheld + (13:51:27, 13 December 2024)
- ML20095B005 + (13:51:28, 13 December 2024)
- ML20095B003 + (13:51:29, 13 December 2024)
- 05000271/LER-1992-012, :on 920331,setpoints of Four Degraded Grid Undervoltage Relays Found Below TS Limits.Caused by Setpoint Drift Outside Extremely Tight Tolerance Band.Relays Reset to Specified Voltage Range + (13:51:31, 13 December 2024)
- 05000413/LER-1992-003-03, :on 920316,RN Pump 2A Was Declared Inoperable. Caused by Pump Running for 40 Min in Low Flow Condition. Evaluation of Need for Procedure Changes & Shift Briefings Underway + (13:51:33, 13 December 2024)
- ML20095A990 + (13:51:35, 13 December 2024)
- 05000440/LER-1992-004, :on 920321,RWCU Sys Containment Isolation Occurred as Result of High Sys Differential Flow.Caused by Unexpected Steam Void in RWCU Regenerative Hxs.Ts Change Submitted on 911030 & Computer Monitoring Program Changed + (13:51:40, 13 December 2024)
- U-601962, Forwards Monthly Operating Rept for Mar 1992 for Clinton Power Station,Unit 1.Corrected Values for Gross Electrical Energy Generated for Months of Jul 1987 & Jan & Oct 1988 Stated + (13:51:41, 13 December 2024)
- PY-CEI-NRR-1480, Forwards LERs 92-004-00 & 92-006-00 + (13:51:42, 13 December 2024)
- 05000414/LER-1992-004-01, :on 920314,personnel Discovered That Limit Switch Contacts Were in Incorrect Position.Cause Not Determined.Wr 92017000 01 Completed & TT/1/A/9200 65 Was Successfully Completed + (13:51:44, 13 December 2024)
- LD-92-049, Transmits CESSAR-DC Flow Diagram Matrix for Auxiliary Sys. Encl Tables Specify CESSAR-DC Figure Corresponding to Each Drawing & Whether Each Figure Is New or replacement.W/93 Oversize Drawings + (13:51:46, 13 December 2024)
- LD-92-050, Submits Section 6.2.5 of Design Certification Discussing Layout of Hydrogen Mitigation Sys Igniter Locations + (13:51:51, 13 December 2024)
- ML20095A963 + (13:51:51, 13 December 2024)
- ML20095A960 + (13:51:52, 13 December 2024)
- RBG-36742, Monthly Operating Rept for Mar 1992 for River Bend Station, Unit 1 + (13:51:53, 13 December 2024)
- LD-92-051, Forwards Selection of Control Motion for ABB-C-E Sys 80+ Std Design. Rept Identifies & Discusses Hypothetical Rock Outcrop Spectrum & Control Motions + (13:51:54, 13 December 2024)
- ML20095A952 + (13:51:54, 13 December 2024)
- ML20095A945 + (13:51:56, 13 December 2024)
- ML20095A941 + (13:51:57, 13 December 2024)
- ML20095A937 + (13:51:58, 13 December 2024)
- 1CAN049209, Informs That Dl Fowler,License SOP-43382,no Longer Needs to Maintain Operating License & Requests That License Be Withdrawn + (13:51:59, 13 December 2024)
- ST-HL-AE-4056, Forwards 2RE02 Inservice Insp Summary Rept for Repairs & Replacements,Addendum-1,South Texas Project Electric Generating Station,Unit 2 + (13:51:59, 13 December 2024)
- ML20095A929 + (13:52:00, 13 December 2024)
- ML20095A926 + (13:52:01, 13 December 2024)
- PY-CEI-NRR-1473, Submits Schedule for Response to NRC SER on Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping + (13:52:02, 13 December 2024)
- ML20095A919 + (13:52:03, 13 December 2024)
- 2CAN049206, Monthly Operating Rept for Mar 1992 for Arkansas Nuclear One,Unit 2 + (13:52:04, 13 December 2024)
- ML20095A913 + (13:52:04, 13 December 2024)
- PY-CEI-NRR-1476, Monthly Operating Rept for Mar 1992 for Perry Nuclear Power Plant + (13:52:05, 13 December 2024)
- ML20095A907 + (13:52:07, 13 December 2024)
- ML20095A901 + (13:52:08, 13 December 2024)
- ML20095A895 + (13:52:09, 13 December 2024)
- ML20095A889 + (13:52:10, 13 December 2024)
- 0CAN049209, 1991 Annual Financial Rept + (13:52:11, 13 December 2024)
- NG-95-3121, Forwards Licensing TR Demonstrating Applicability of Option I-D as Appropriate Long Term Stability Solution for DAEC, Request for TS Changes & Proprietary Technical Description of Odysy.Proprietary Technical Description Withheld + (13:52:12, 13 December 2024)
- 05000353/LER-1991-017, :on 911115,oil Leak Discovered in HPCI Sys Which Could Have Prevented Sys from Maintaining Reactor in Safe Shutdown Condition.Caused by Local Defect in Section of Tube.Line Replaced W/Hard Pipe Line + (13:52:14, 13 December 2024)
- 1CAN049208, Provides Results of ISI Performed on Once Through SGs During Mar,1992 Using Std Bobbin Coil Technique + (13:52:16, 13 December 2024)
- ML20095A876 + (13:52:16, 13 December 2024)
- ML20095A851 + (13:52:17, 13 December 2024)
- 05000457/LER-1992-002-08, :on 920315,removal of Fuses Caused Feedwater Isolation for SGs 2B & 2C.Caused by Personnel Error.Out of Svc Card Number for Fuse Number Was Transposed & Wrong Fuses Were Removed + (13:52:19, 13 December 2024)
- ML20095A846 + (13:52:20, 13 December 2024)
- ML20095A839 + (13:52:27, 13 December 2024)
- ML20095A827 + (13:52:29, 13 December 2024)
- ML20095A806 + (13:52:30, 13 December 2024)
- RC-95-0299, Application for Amend to License NPF-12,consisting of Change Request 94-02,incorporating Revs to 10CFR20 Corrections of Bases 3/4 11-1 + (13:52:32, 13 December 2024)
- ML20095A799 + (13:52:33, 13 December 2024)