Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20095B550 + (13:49:31, 13 December 2024)
- ML20095B546 + (13:49:32, 13 December 2024)
- BVY-92-044, Responds to NRC Re Violations Noted in Insp Rept 50-271/92-04.Corrective Actions:Alarm Response Sheet Revised to Remove Misleading Statements & Specifically State That HPCI Should Be Considered Inoperable Anytime Inverter Trips + (13:49:33, 13 December 2024)
- ML20095B530 + (13:49:34, 13 December 2024)
- ML20095B529 + (13:49:34, 13 December 2024)
- ML20095B521 + (13:49:35, 13 December 2024)
- ML20095B509 + (13:49:36, 13 December 2024)
- ML20095B517 + (13:49:36, 13 December 2024)
- ML20095B507 + (13:49:37, 13 December 2024)
- ML20095B483 + (13:49:38, 13 December 2024)
- ML20095B478 + (13:49:40, 13 December 2024)
- ML20095B476 + (13:49:40, 13 December 2024)
- ML20095B472 + (13:49:41, 13 December 2024)
- ML20095B466 + (13:49:42, 13 December 2024)
- ML20095B438 + (13:49:43, 13 December 2024)
- ML20095B458 + (13:49:43, 13 December 2024)
- ML20095B427 + (13:49:45, 13 December 2024)
- ML20095B418 + (13:49:46, 13 December 2024)
- ML20095B416 + (13:49:47, 13 December 2024)
- ML20095B408 + (13:49:48, 13 December 2024)
- ML20095B405 + (13:49:51, 13 December 2024)
- HL-2161, Comments on NRC SE on Second 10-yr Insp Interval IST Program & Requests mid-April Meeting or Telcon to Address Items.Tables Categorizing Subj Comments Encl + (13:49:52, 13 December 2024)
- ML20095B395 + (13:49:53, 13 December 2024)
- ML20095B394 + (13:49:54, 13 December 2024)
- ML20095B388 + (13:49:55, 13 December 2024)
- 0CAN049207, Forwards Revised Summary Data Point Library & Completed Detailed Database Required by NUREG-1394,per + (13:49:56, 13 December 2024)
- 05000423/LER-1992-008-01, :on 920317,plant Personnel Verified That Eight Valves Not Included in Svc Water Sys TS Valve Lineup.Caused by Procedure Deficiency.Change to Valve Lineup Procedure Written & Valves Verified in Correct Position + (13:49:58, 13 December 2024)
- 05000374/LER-1992-005-04, :on 920322, 2A DG Auto Started & RHR 2B Low Pressure Cooling Injection, 2C Low Pressure Cooling Injection & RCIC Sys Received Initiation Signals.Caused by Spike in Instrument Line.Procedure Revised + (13:50:01, 13 December 2024)
- ML20095B357 + (13:50:03, 13 December 2024)
- SNRC-1936, Advises That Util Endorses Request by Lilco to Amend Indemnity Agreement,Dtd 910429.Util Requests That NRC Amend Indemnity Agreement 87 to Replace Lilco W/Long Island Power Authority + (13:50:04, 13 December 2024)
- ML20095B315 + (13:50:07, 13 December 2024)
- ML20095B321 + (13:50:07, 13 December 2024)
- IR 05000329/1982014 + (13:50:23, 13 December 2024)
- ML20095B293 + (13:50:24, 13 December 2024)
- ML20095B288 + (13:50:25, 13 December 2024)
- ML20095B263 + (13:50:29, 13 December 2024)
- ML20095B250 + (13:50:30, 13 December 2024)
- ML20095B247 + (13:50:32, 13 December 2024)
- ML20095B245 + (13:50:32, 13 December 2024)
- ML20095B241 + (13:50:33, 13 December 2024)
- ML20095B237 + (13:50:34, 13 December 2024)
- B51956, 8R/9R Bobbin Voltage (S/N) Growth Rate Calculations + (13:50:35, 13 December 2024)
- ML20095B210 + (13:50:35, 13 December 2024)
- 3F1295-03, Forwards Responses to NRC 951024 RAI Re TS Change Request 203 Concerning Small Vol Eddy Current Indication Disposition.Rept B51956-R1, Crystal River 3 8R/9R Bobbin Voltage (S/N) Growth Rate Calculations Also Encl + (13:50:38, 13 December 2024)
- 1CAN049202, Forwards Scoping Evaluation for Arkansas Nuclear One,Unit 1 Reactor Coolant Pumps Per Requirments of ASME Code Case N-481, Consisting of 1986 & 88 Insp Results & 1986 & 88 Fracture Mechanics Evaluations.W/One Oversize Drawing + (13:50:40, 13 December 2024)
- ML20095B157 + (13:50:43, 13 December 2024)
- ML20095B128 + (13:50:44, 13 December 2024)
- 05000498/LER-1992-003-01, :on 920314,reactor Trip Occurred from Momentary False Reactor Coolant Low Flow Trip Signal.Caused by Failure to Follow Procedures.Shift & Unit Supervisors Briefed. Reactor Trip Prevention Policy Established + (13:50:46, 13 December 2024)
- NRC-92-0028, Revises 911029 Response to Concerns Noted in Exam Rept 50-341/OL-91-01.Informs That Measures Taken to Strengthen Exam Security & Prevent Inadvertent Compromise.List of Outstanding Commitments & Required Changes Encl + (13:50:51, 13 December 2024)
- HL-2142, Documents Verbal Agreement Between Util & NRR Re Technical Questions on Physical Installation of Containment Hardened Vent,Per Generic Ltr 89-16.Schematic of Proposed Torus Hardened Vent Mod Encl + (13:50:52, 13 December 2024)
- ML20095B112 + (13:50:53, 13 December 2024)