Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20096E691 + (12:57:39, 13 December 2024)
- ML20096E689 + (12:57:43, 13 December 2024)
- NRC-96-4621, Forwards Draft of AP600 SSAR Subsection 6.2.4.Draft Reflects Recent Passive Autocatalytic Recombiner Performance Data + (12:57:45, 13 December 2024)
- ML20096E684 + (12:57:49, 13 December 2024)
- ML20096E674 + (12:57:50, 13 December 2024)
- ML20096E661 + (12:57:50, 13 December 2024)
- ML20096E660 + (12:57:51, 13 December 2024)
- ML20096E657 + (12:57:52, 13 December 2024)
- ML20096E653 + (12:57:53, 13 December 2024)
- ML20096E655 + (12:57:53, 13 December 2024)
- ML20096E642 + (12:57:54, 13 December 2024)
- ML20096E651 + (12:57:54, 13 December 2024)
- ML20096E635 + (12:57:55, 13 December 2024)
- ML20096E632 + (12:57:56, 13 December 2024)
- ML20096E628 + (12:57:57, 13 December 2024)
- ML20096E630 + (12:57:57, 13 December 2024)
- ML20096E626 + (12:57:58, 13 December 2024)
- ML20096E619 + (12:57:59, 13 December 2024)
- ML20096E624 + (12:57:59, 13 December 2024)
- L-96-000, Forwards fitness-for-duty Performance Data for Period Ending 951231 + (12:58:00, 13 December 2024)
- ML20096E613 + (12:58:00, 13 December 2024)
- U-602540, Monthly Operating Rept for Dec 1995 for Clinton Power Station Unit 1 + (12:58:01, 13 December 2024)
- 05000413/LER-1984-003-03, :on 840729,two Control Rod Drive Assemblies (CRDA) Failed to Lock After Being Latched.Reactor Bldg Crane Removed Inoperable Crdas,In Violation of Tech Specs.Caused by Personnel Error + (12:58:03, 13 December 2024)
- PLA-2280, Responds to NRC Re Violations Noted in Insp Repts 50-387/84-18 & 50-388/84-22.Corrective Actions: Surveillance Procedures Changed to Include Verification Signatures When Required + (12:58:04, 13 December 2024)
- ML20096E595 + (12:58:05, 13 December 2024)
- 05000327/LER-1984-049, :on 840815,interactions Found on Various safety-related Sys That Were Not in Compliance w/10CFR50,App R.Fire Watches Established.Corrective Action Schedule Expected by 850101 + (12:58:07, 13 December 2024)
- ML20096E581 + (12:58:08, 13 December 2024)
- ML20096E587 + (12:58:08, 13 December 2024)
- ML20096E574 + (12:58:09, 13 December 2024)
- TXX-9209, Supplemental & Final Deficiency Rept CP-88-036 for Units 1 & 2,respectively Re Chemical Vol & Control Sys Charging Pumps Alternate Min Flow Recirculating Piping.Final Rept for Unit 2 Not Reportable Under 10CFR50.55(e) or 10CFR21 + (12:58:10, 13 December 2024)
- ML20096E558 + (12:58:10, 13 December 2024)
- ML20096E552 + (12:58:11, 13 December 2024)
- ML20096E538 + (12:58:11, 13 December 2024)
- ML20096E532 + (12:58:13, 13 December 2024)
- ML20096E524 + (12:58:14, 13 December 2024)
- ML20096E510 + (12:58:15, 13 December 2024)
- B15501, Proposed Tech Specs,Allowing Use of performanced-based Containment Leakage Testing Requirements Described in 10CFR50,App J,Option B + (12:58:16, 13 December 2024)
- ML20096E497 + (12:58:16, 13 December 2024)
- ML20096E482 + (12:58:17, 13 December 2024)
- 05000374/LER-1984-049, :on 840801,stationmen Gained Access to High Radiation Areas Through Use of Producton Level Keycards After High Radiation Cards Failed to Work.Caused by Personnel Failure to Change Door Status + (12:58:19, 13 December 2024)
- ML20096E470 + (12:58:20, 13 December 2024)
- ML20096E451 + (12:58:22, 13 December 2024)
- ML20096E466 + (12:58:22, 13 December 2024)
- ML20096E433 + (12:58:25, 13 December 2024)
- TXX-4295, Forwards Responses to Seismic & Dynamic Qualification Audit Questions,Per 840823 Telcon + (12:58:26, 13 December 2024)
- ML20096E423 + (12:58:27, 13 December 2024)
- TXX-4286, Submits Eighth Biweekly Update on Status of Important Schedules Re Issues for Facility Fuel Load in Late Sept 1984.Info Represents Status Through 840818 + (12:58:27, 13 December 2024)
- ML20096E415 + (12:58:28, 13 December 2024)
- SNRC-1073, Forwards Temporary Procedure Tp 21.001.02, On-Shift Advisor Training,Duties & Responsibilities & Results of Shift Operator Exams.All Five Candidates Certified + (12:58:28, 13 December 2024)
- ML20096E404 + (12:58:29, 13 December 2024)
- PLA-2236, Forwards Response to Violations Noted in Insp Repts 50-387/84-14 & 50-388/84-16.Corrective Actions:Valves 157197,157200,157203 & 157206 Locked Closed & check-off List Appropriately Changed + (12:58:30, 13 December 2024)
- ML20096E387 + (12:58:30, 13 December 2024)