Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20097E722 + (12:30:42, 13 December 2024)
- ML20097E718 + (12:30:43, 13 December 2024)
- ML20097E712 + (12:30:46, 13 December 2024)
- ML20097E713 + (12:30:46, 13 December 2024)
- ML20097E709 + (12:30:47, 13 December 2024)
- ML20097E705 + (12:30:53, 13 December 2024)
- 05000265/LER-1990-010-03, :on 901015,reactor Scram Occurred Due to Turbine Trip from Moisture Separator High Level.Caused by Partially Blocked Drain Line on 2C Moisture Separator Level Switch.Level Switches Cleaned + (12:30:55, 13 December 2024)
- ML20097E697 + (12:30:56, 13 December 2024)
- ML20097E694 + (12:30:57, 13 December 2024)
- ML20097E696 + (12:30:57, 13 December 2024)
- ML20097E687 + (12:31:01, 13 December 2024)
- ML20097E693 + (12:31:01, 13 December 2024)
- ML20097E673 + (12:31:02, 13 December 2024)
- ML20097E668 + (12:31:02, 13 December 2024)
- ML20097E667 + (12:31:04, 13 December 2024)
- ML20097E665 + (12:31:05, 13 December 2024)
- ML20097E659 + (12:31:06, 13 December 2024)
- ML20097E637 + (12:31:07, 13 December 2024)
- ML20097E657 + (12:31:07, 13 December 2024)
- ML20097E630 + (12:31:08, 13 December 2024)
- ML20097E618 + (12:31:09, 13 December 2024)
- ML20097E623 + (12:31:09, 13 December 2024)
- 05000445/LER-1992-010, :on 920509,analog Channel Operational Test Not Performed Prior to Startup to Verify power-range Neutron Flux Low Setpoint.Caused by Personnel Error.Task Team Formed to Review Surveillance Test Process + (12:31:11, 13 December 2024)
- ML20097E583 + (12:31:12, 13 December 2024)
- ML20097E567 + (12:31:13, 13 December 2024)
- ML20097E565 + (12:31:14, 13 December 2024)
- 0CAN088413, Forwards Final Response to 821112 & 840306 Requests for Addl Info Re Control of Heavy Loads.Response Addressed NRC Concerns for Unit 1 Inservice Insp Tool Lift Rig & Unit 2 Reactor Maint Structure Lift Beam & Hydraset + (12:31:15, 13 December 2024)
- ML20097E557 + (12:31:15, 13 December 2024)
- ML20097E538 + (12:31:16, 13 December 2024)
- LD-92-073, Forwards marked-up Draft Defense Against Common Mode Failures in Digital Instrumentation & Control Sys, Per 920601 Meeting W/Nrc + (12:31:17, 13 December 2024)
- ML20097E522 + (12:31:17, 13 December 2024)
- ML20097E510 + (12:31:18, 13 December 2024)
- ML20097E501 + (12:31:19, 13 December 2024)
- ML20097E496 + (12:31:19, 13 December 2024)
- ML20097E493 + (12:31:20, 13 December 2024)
- ML20097E484 + (12:31:21, 13 December 2024)
- ML20097E478 + (12:31:21, 13 December 2024)
- 3F0692-04, Forwards Relief Request 92-010 to Permit Use of Guidelines for Selection of Sample Populations Provided in ASME Operation & Maint of Nuclear Plants,Part 4 (OM-4),1987 as Alternative for Snubbers That Fail Inservice Tests + (12:31:22, 13 December 2024)
- ML20097E461 + (12:31:23, 13 December 2024)
- ML20097E466 + (12:31:23, 13 December 2024)
- ML20097E457 + (12:31:24, 13 December 2024)
- ML20097E453 + (12:31:25, 13 December 2024)
- ML20097E448 + (12:31:26, 13 December 2024)
- ML20097E443 + (12:31:26, 13 December 2024)
- ML20097E433 + (12:31:27, 13 December 2024)
- ML20097E431 + (12:31:28, 13 December 2024)
- HL-2236, Forwards Response to Items Included in Table 1 & Addl Justification for Items Included in Table 3 of . Revised Relief Requests Reflecting Proposed Changes Re Second 10-yr Insp Interval IST Program SE Also Encl + (12:31:31, 13 December 2024)
- ML20097E418 + (12:31:32, 13 December 2024)
- ML20097E415 + (12:31:33, 13 December 2024)
- ML20097E387 + (12:31:34, 13 December 2024)
- ML20097E386 + (12:31:35, 13 December 2024)
- ML20097E377 + (12:31:37, 13 December 2024)