P O !!an 4 Sh,ppmggnt PA 1$077 MO4 June 8, 1992 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operatim Report U. S. Nuclear Regulatory Caramission Document Control Desk Washirgton, D.C.
20555 Gentlemen:
/
In accordance with Appendix A,
TechnL'al Specifications, the Monthly Operatirq Report is subnitted for Unit 1 and Unit 2 for the month of Fby,1992.
'Ihe " Unit Shutdowns and Power Reductions" sheet for Unit 2 inadvertantly listed the report month as
" March 1992" in the April 1992 Monthly Operating Report. Attached is a corrected sheet, very truly youra,
/
. D. Sieber ice President Nuclear Group DI'J/ lng Enclosures cc: NRC Regional Office King of Prussia, PA I
Y L
9206120186 920531
-( )
DR ADOCK 0500 4
/
l k
NARRATIVE
SUMMARY
OF MJtfIHLY OPERATDM EXPERIDE
. UNIT 1 MAY 1992 May 1
'Ihe Unit cperated at a naminal value of 100% outptt.
thruxb my 14 My 15 At 2100 hourc the Unit 'ocumenced a scheduled load reduction to appsocimately 30^
output to permit work on the Main Feedwater Reguaatim Valves.
e my 16 At 0215 hours0.00249 days <br />0.0597 hours <br />3.554894e-4 weeks <br />8.18075e-5 months <br /> the Unit achieved approximately 30% output.
May 17 The: Unit-continued to: operate at approximately 30% output to
~
permit work on the Main Feedwater Regulati g Valves. At 0115 hours0.00133 days <br />0.0319 hours <br />1.901455e-4 weeks <br />4.37575e-5 months <br />, shutdown bank control rod G-3-was declared inoperable-due to rod position indication and primary voltage readings indicating greater than the ' 'hchnical Specification 3.1.3.1 limit -of 12 steps. - Following re-calibration of control' rod G-3 rod position indication, the shutdown bank was returned to operable status at 0750 hours0.00868 days <br />0.208 hours <br />0.00124 weeks <br />2.85375e-4 months <br />. Following conpletion of work on the Main Feedwater Regulating Valves,. power amealation to a ncminal value of 100% output was v
.uKm-d at 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br />.
May 18
'Ihe Unit achieved 100% output at 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br />.
May 19
'Ihe Unit operated at a ncminal value of 100% output, th 1ogh
-May 31
____.____m_...-.___m-__._.__.__
AVERA'E IAILY INIT ICWER 1EVEL DOCKET NO.
50-334 LMIT -BVPS Unit 1 IATE -June 3. 1992 025 UlrED BY
' David T. Joneg__
TEIERONE (412)-393-7612-POTT 1H MAY 1992 EAY AVERAGE [AILY POWER 1EVEL IRY AVERAGE IRILY KMER ILVEL -
(PNe-Net)
-(PMe-Net)-
1 817 17 204 2
800
-18 788 3
813
-19 813 4
813 20 817 5
821 21 808 6
808 22.
817 7
813 23' 808 8
817 24-821' 9
808 25 821 10 808 26 821 11 808 27 821 12 800 28 '-
821 13 804 29 817 14 813
-30 821 15 -
792 31E 821 16 167' INSITUCI' IONS: =
On this. format,. list the average' daily unit power level PNe-Net for each day :in-the reporting month. Canpute to the nearest whole megawatt.
4 OPERATING DATA' REPORT DOCKET NO.:
50'334 REPORT DATE:
06/02/92 COMPLETED BY: DAVID T. JONES-TELEPHONE:-
(412) 393 7612 OP': RATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: MAY 1992
- 3. LICENSED THERMAL POWER (MWt):
2652"
- 4. NAMEPIATE RATING (Gross MWe):
923-
- 5. DESIGN ELECTRICAL RATING (Net _MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860-
- 7. MAX. DEPENDABLE CAPACITY.(Net MWe):
810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST-REPORT, GIVE REASONS:
4 9. POWER LEVEL TO VHICH RESTRICTED; IF ANY--(Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N /A THIS MONTH
' YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
744,0 3647.0 140999.0
- 12. NO. OF HRS.--REACTOR WAS CRITICAL:
-744.0 3647.0 88970.6
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0-0.0
-4482.8 14.- HOURS GENERATOR WAS ON LINE:-
744.0 3647.0 87078.2
- 15. UNIT RESERVE SHUTDOWN HOURS:
. L O.0.
0.0 0.0~
d
- 16. CROSS THERMAL ENERGY GEN. (MWH):
1878892.0 9475815.0 207987991.5
- 17. GROSS ELECT. ENERGY GEN. (MWH):
609410.0-3110660.0
- 66909063.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
- 573990.0- _
2936500.0 62504050.0
- 19. UNIT SERVICE FACTOR: (PERCENT)
'100.0 100.0--
63.8
- 20. UNIT AVAILABILITY FACTOR:(PERCENT)-
100,0:
'100.0-63.8
- 92.4 961.4 55.7-
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0=
36.1 24, SHUTDOWS ' SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE 0F-STARTUP:
26 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
' FORECAST ACHIEVED INITIAL CRITICALITY N/A-N/A INITIAL ELECTRICITY N/A-
_ _ N/A COMMERCIAL OPERATION N/A N/A-
s, UNIT SHUTDOWNS AND POWER REDUCTIONS (>20%)
Docket No.
50-334 unit Name BVP5 Unit el Date June 3, 1992 Completed By David T.
Jones REPORT MONTd PAY 1992 Telephone (412) 393-7612 l
)
Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.
Date Type 1 (Hours)
Reason 2 Down Reactor 3 Report #
Code 4 Code 5 Prevent Recurrence 3
920515 S
0 8
5 N/A CH V'.VEM Unit reduced output from 100% to approximately 30% for maintenance work on the main feedwater regulating watwes.
l 1
2 3
4 F-Forced Reason:
Method:
Exhibit F-Instructions for S-Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry Sheets B-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File
,C-Refueling 3-Automatic Scram (NUREG0161).
D-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exam 5-Reduc t ion 5
'F-Administrative 9-Other Exhibit R-Same Source.
G-Operational Error (Explain)
- H-Other (Explain)
=llARRATIVE SWi%RY OF
!OtfIHLY OPERATIlG EXPERIENCE UNIT 2
}RY 1992-luy 1
'1he Unit remained shutdown in Mode 5 for the Unit's third through refuelity outage.
May 2-
}hy 3
'Ihe Unit entered Mode 4 at 1408 hours0.0163 days <br />0.391 hours <br />0.00233 weeks <br />5.35744e-4 months <br />.
May 4-
'Ihe Unit remained in Mode 4 to prepare to' enter Mode 3.
May 5-
'Ihe Unit entered Mode 3 = at 0940 hours0.0109 days <br />0.261 hours <br />0.00155 weeks <br />3.5767e-4 months <br />.
May 6-
'Ibe Unit remained in hade 3 to prepare to enter Mode 2. -
through May 8 May_9
'Ihe Unit entered Mode 2 at 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br />. 'Ihe reactor was taken critical at 1905 hours0.022 days <br />0.529 hours <br />0.00315 weeks <br />7.248525e-4 months <br />.
May 10
'Ihe Unit remained in Mode 2 to prepare _to enter Mcde 1.
thy 11 h Unit entered Mode 1 at 1125 hours0.013 days <br />0.313 hours <br />0.00186 weeks <br />4.280625e-4 months <br />.
May 12 At ' 0355 hours0.00411 days <br />0.0986 hours <br />5.869709e-4 weeks <br />1.350775e-4 months <br /> the output breaker was closed synchroniziry the -
Main Unit Generater-to the grid, and - power walation was begun.-
With output at approximately 20%, the turbine tripped at 0605 hours0.007 days <br />0.168 hours <br />0.001 weeks <br />2.302025e-4 months <br /> due : to a generator ground overcurrent. After troubleshootiry the-Main-Unit-Generator-.the Unit was.
synchronized -to
'the -grid ~ at. 2040:
escalated.
hours 1and Loutput was May 13-With-the Unit at approximately 24% cutput.a planned reduction-for turbine overspeed trip testing was emmanced at 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />.
'Ihe' output breakers were opened at 0633 hours0.00733 days <br />0.176 hours <br />0.00105 weeks <br />2.408565e-4 months <br /> removing the Unit fran -the. grid._ 'Ihe Unit was synchronized _to_ the grid at 1230-hours following av = =ful overspeed trip testing, and output
--was aealated to approximately 30%.
May_14
' Ihe Unit aantinued to operate at approximately_30%. output.
thrtufi
~
May 15-May 16 At 2330- hours the Unit's output was scugup at 3%-per_ hour.
. h Unit adlieved approximately 75% output at-1400 hours.
May-171
'1he Unit _ continued to operate at approximately 75% output. -
a
!NGATIVE SUMGRY OF
!OlmILY OPERATDIG EXPERIDK'E UNIT 2 MAY 1992 (continued)
May 18 At 0527 hours0.0061 days <br />0.146 hours <br />8.713624e-4 weeks <br />2.005235e-4 months <br /> power increase to 90% was ommenced. 7he Unit achieved approximately 90% output at 1249 hours0.0145 days <br />0.347 hours <br />0.00207 weeks <br />4.752445e-4 months <br />.
May 19 At 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br /> power increase to 100% was commenced.
May 20 The Unit achieved approximately 100% output at 0315 hours0.00365 days <br />0.0875 hours <br />5.208333e-4 weeks <br />1.198575e-4 months <br />.
May 21 The Unit operated at a ncminal value of 100% cutput.
through May 31 9
d-
AVERAGE DAILY UNIT 10WER IEVEL D00Er NO.
_,1Q _412 UNIT BVPS Unit 2 DATE June 3, 1992 CCEPIETED BY David T. Jones TEI.ERONE (412) 393-7612 M3tTIH MAY 1992 DAY AVERAGE DAILY FOWER IEVEL DAY AVERAGE DAILY IOWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 576 2
0 18 679 3
0 19 740 4
0 20 812 5
0 21 815 6
0 22 819 7
0 23 815 8
0 24 826 9
0 25 828 10 0
26 822 11 0
27 826 12 0
28 826 13 95 29 823 14 166 30 823 15 165 31 824 16 469 INSTIUCTIONS:
On this formt, list the average daily unit power level MWe-Net for each day in the reporting renth. Otzpate to the nearest whole toegawatt.
t-
OPERATINC DATA REPORT DOCKET No.:
50 412 REPOLT DATE:
06/03/92 COMPLETED BY: DAVID T. JONES TELEPHONE:
(412) 393 7612 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD MAY 1992
- 3. LICENSED THERMAL POWER (MWt):
2652 4, NAMEPLATE RATING (Crosa MWe):
923
- 5. DESIGN ELECTRICAL RATING (Not MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Cross MWe):
870 i
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
820
- 8. IT C)(ANCES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICll RESTRICTED, IF ANY (N6t MWe):
None
- 10. REASONS FOR RESTRICTIONS. IF ANY:
N/A TilIS HONT}l YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
744.0 3647.0 39782.0
- 12. No ~ 0F HRS REACTOR WAS CRITICAL:
532.9 2284.0 33364.2_
- 13. REACTOR RESERVE SilUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS CENERATOR VAS ON LINE:
455.6 2206.3
-33088.3
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY GEN. (MVH):
1023309,0 5200071,0 80559818.4
- 17. CROSS ELECT. ENERGY GEN. (MWH):
325492.0
- 18. NET ELECTRICAL ENERGY GEN.-(MVH):
298518.0
' 1671924.0 25846505.0 1567317.0 24372802.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 61.2 60.5 83.2
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 61.2 60.5 83.2
- 22. UNIT CAPACITY FACTOR (DER): PCT 48,1 51.4 73.3'
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 3.1 0.7 3.7
~
- 24. Sl!UTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE.DATE AND DURATION'0F EAC1'):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATER F.STARTUP:
'26. UNITS IN TEST. STATUS (PRIOR TO COMMERCIAL OPERATION):-
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A'~~
INITIAL ELECTRICITY N/A N/A
-COMMERCIAL OPERATION N/A N/A u.-_.__
UNIT. 5MUTDOWNS AND POWER REDUCTIONS Q20%)
Docket me.
50-412 Unit meme 8vPS w it #2 Cete Jun* 3. 1992 Completed 8y Deved T. scaes REPORT MONIN #4Y 1992 Telephone (412) 393-7612 method of Licensee I Cause & Corrective Duration Shutting Event System Component Actien to No.
Date
'Typel
'(Nours)
Reeson2 Down Reector3 Report s Codes Code 5 Prevent Recurrewe i11' 920501 267.9 C
4 5/A RC FUELXX Unit *essined shutdown to complete the third refueling ou*ege.
12 920512.
F 14.6 A
9 W/A NA GEmERA Turbine tripped free approximately 20% output due to e esin unit generator ground overcurrent.
(#0TE: Reector mes not shutdown) 13 920513 s..
5.95' s
5/9 m/A sa Tutste tMit mes removed f rom service to permit turbine overspeed trip testing. (WCTE: Reactor mes not shutdown) 1
'2' 3
4 F-Forced Reeson:
Method:
Exhibit F-Instructions for S-Scheduled A-Equipment Fellure (Explain).
1-menuel Preperation of Date Entry sheets S-peintenance or Test 2-penuel Scree for Licensee Event Repor* TLER) File C-Refueting-3-Automatic Scree (suREG0161).
9-Regulatory Restriction 4-Cont'd..from Previous Month
~E-Operator Training & License Emes 5-Reduction 5
F-Administrative 9-Other-Exhibit a-Sese Sourre.
G-Operationet Error (Explain).
N-Other (Emplain) -
UNIT SMUTDOWNS AaD POWER REDUCitosr*, Q20%)
pocket no.
Jo-412 Unit Name Bye $ im o t #2 Date Jsr* 3. 1992 Completed By Davio T.
J e*=
PEPORT 4GwfM AP81L 1992 Telephone (412) 391-7612 Method of Licensee Cause & Corrective Duration Shutting Event S yst em Component Action to No.
Date Typel (Nours)
Reason 2 Down peactor3 seport a Code 4 Codes Prevent securrence 10 920401 5
719.0 C
4 m/A aC FUEtXX Unit re==sined shutdown for the third refueling outage.
1 2
3 4
F-Forced Reason:
Method:
Exhibit F-Instructions for S-Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry Sheets 8-Maintenance or Test 2-manuet scree f or Licensee Event aeport (LER) fit.
C-Refueting 3-Au-matic scree (musEG0161).
D-Regulatory Restriction 4-Cont'd. from Previous month E-coerator Training & ticense Exas 5-Reduction 5
F-Administrative 9-Other Eshibit e-See* Source.
G-coerational Error (Emplain)
N-Other (Esplain) l w m w m u: 1