ML20097E453

From kanterella
Jump to navigation Jump to search
Forwards 840830 Meeting Agenda,Slides & Diagrams of Program Presentation & Conference Notes Re Electrical Separation Program,Per 840830 Commitment
ML20097E453
Person / Time
Site: Beaver Valley
Issue date: 09/14/1984
From: Woolever E
DUQUESNE LIGHT CO.
To: Knighton G
Office of Nuclear Reactor Regulation
References
2NRC-4-143, NUDOCS 8409180200
Download: ML20097E453 (44)


Text

- -

~

~

_ Q.

t

~! f A

2NRC-4-143 (412) 787-5141 (412)923-1960 Nuclear C4,r.struction Division Telecopy (412) 787-2629

. Robinson Msza. Guilding 2, Suite 210 Pittsburgh, PA 15205 September 14, 1984 A

United Stites Nacl' ear Regulatory Commission Washingtoc, DC 20555 s

ATT2NTION:

Mr. George W. Knighton, Chief Licensing 4 ranch 3 D6f fice of Nuclear Reactor Regulation t

SUBJECT:

L'eaver Valley Power Station - Unit No. 2 Focket No. 50-412

[ - {

.Eiectrical Separation R.G.1.75 Information i

Gentlemen:

3 i'

In a'ccordance with commitments made at a meeting with your staf f on Augtist ' 3'G,' 19 84, concerning our electrical separation program, we are subtiitting _ the meeting agenda (At tachment 1), a copy of the slides and Q, diagrama ( Attachment a

2) of the pr ogram presenation, and the notes of conference (Attachmee.t 3).

,s-

~.

s, DUQUESNE LIGHT COMPANY s

s.

p s

By (g '

,1

.s

\\\\ $

' \\,'

T.VJ. Voolever 1

Vice President

'g

.~

t ~

.GH0/wjs s

' Attachment s

g U

- \\

.y

,cc:

Mr.,C. Anderson, Region 1 (3) (w/ attachment)

Mr. J. Knox (w/ attachment) ge

- Q s '" \\

Ms. M. Ley, Project Manager (w/ attachment)

Y Mr. G. Walton, Re.sident Inspector (w/ attachment)

_g q

l)1l SUBSCRIBED AND Sf0RN TO BEFORE ME THIS

/d DAY OF u/c.das[/t

, 1984.

[k

,;]e

,y

}4 Notary Public ANITA ELAINE T<EITER, NOTARY PUBLIC ROBINSON TOWNSHIP, ALLEGHENY COUNTY 0409180200 840914 MY COMMISSION EXPlRES OCTOBER 20,1986 q

PDR ADOCK 05000 i

q a

I(

l

Unitsd Str.tse Nuclect R2guletory Commission Mr. G orga W. Knighton, Chief Page 2 COMMONWEALTH OF PENNSYLVANIA

-)

)

SS:

COUNTY OF ALLEGHENY

)

'On this-

/e,/// day of d

///

, before me, a Notary Public in and for said Commonwealth and County, personally appeared E. J. Woolever, who being duly sworn, deposed and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge.

i os.

Notary Public ANITA ELAINE REITER, NOTARY PUBUC ROBINSON TOWNSHIP, ALLEGHENY COUNTY MY COMMISSION EXPlRES OCTOBER 20,1986

l ATTACHMENT 1 DUQUESNE LIGHT COMPANY BEAVER VALLEY POWER STATION - UNIT NO. 2 MEETING AGENDA AUGUST 30 1984, 8:00 A.M.

ELECTRICAL SEPARATION AND R.G.

1.75 (REV. 2) IMPLEMENTATION PROGRAM SITE. EMERGENCY RESPONSE FACILITY CONFERENCE ROOM ITEM SPEAKER I.

INTRODUCTION J. J. CAREY

!I.

OVERVIEW OF MEETING AGENDA H. M. SIEGEL 1.

Purpose / Scope of Meeting 2.

Introduction of Speakers III.

OVERVIEW OF BVPS-2 ELECTRICAL SEPARATION AND J. F. KONKUS R.G. 1.75 (REV. 2) IMPLEMENTATION PROGRAM IV.

SEPARATION PROGRAM IMPLEMENTATION CONCEPTS C. WILBUR V.

TEST PROGRAM C. WILBUR VI.

PROGRAM SCHEDULE C. WILBUR VII.

I&E UNRESOLVED ITEMS H. M. SIEGEL VIII.

SUMMARY

STATEMENT H. M. SIEGEL IX.

LUNCH (TIMING IS ADJUSTABLE) l X.

PLANT TOUR XI.

DISCUSSION l

I -

t

i i

i ATTACilMENT 2 DUQUESNE LIGHT COMPANY BEAVER VALLEY POWER STATION - UNIT NO. 2 ELECTRICAL SEPARATION AND R.G.1.75 l!

(REV. 2) IMPLEMENTATION PROGRAM l

MEETING AGENDA l.

INTRODUCTION II.

OVERVIEW OF MEETING AGENDA

1. PURPOSE / SCOPE OF MEETING
2. INTRODUCTION OF SPEAKERS lli.

OVERVIEW OF BVPS-2 ELECTRICAL SEPARATION R.G.1.75 (REV. 2) IMPLEMENTATION PROGRAM IV.

SEPARATION PROGRAM IMPLEMENTATION l

CONCEPTS V.

TEST PROGRAM

{

VI.

PROGRAM SCHEDULE l

Vll.

l&E UNRESOLVED ITEMS l

Vill.

SUMMARY

STATEMENT l

IX.

PLANT TOUR l

X.

DISCUSSION

2 i

i i

i l

MINIMUM REQUIREMENTS - THE SPATIAL DIMENSIONS CONTAINED IN IEEE-384-74 WHICH WHEN ACHIEVED REQUIRE NO FURTHER ACTION.

l l

U l

i 1

i i

.I i

l I

l REDUCED ALLOWABLES MINIMUM SPACE REQUIRED l

TO ALLOW INSTALLATION OF COVERS, BARRIERS AND WRAPS TO MEET R.G.1.75.

l

~.

l i

k l

l l

i i

i l

REWORK PHYSICAL ACTIVITIES REQUIRED TO MEET AT A MINIMUM REDUCED ALLOWABLES.

l

)

1 l

I

i O

ll 1

i CONSEQUENTIAL WORK INSTALLATION OF COVERS, l

BARRIERS AND WRAPS WHEN THE MINIMUM l

REQUIREMENTS ARE NOT MET.

I i

6 STATUS OF BVPS-2 REG. GUIDE 1.75 (REV. 2)

IMPLEMENTATION PROGRAM e DESIGN CRITERIA DOCUMENTS AND INSTALLATION DOCUMENTS HAVE BEEN REVISED TO INCORPORATE REG. GUIDE 1.75 (REV. 2) CRITERIA

  • TRAINING PROGRAM FOR ENGINEERS, DESIGNERS, QC AND CONSTRUCTION PERSONNEL IMPLEMENTED l

e TRACKING SYSTEM DEVELOPED AND IMPLEMENTED TO IDENTIFY CASES WHERE SPATIAL SEPARATION IS LESS THAN REG. GUIDE 1.75 (REV. 2) REQUIREMENTS

  • DRAWING REVIEW AND ENGINEERING WALKDOWN OF THE PLANT TO IDENTIFY SPATIAL SEPARATIONS LESS THAN REG. GUIDE 1.75 (REV. 2)

CRITERIA COMPLETED e SOLUTION OF ITEMS IDENTIFIED IN THE ENGINEERING WALKDOWN i

OF EXTERNAL CABLE AND RACEWAY IS 70% COMPLETE e AN ENGINEERING TESTING SCOPE HAS BEEN DEVELOPED

DESIGN CRITERIA DOCUMENTS AND i

INSTALLATION DOCUMENTS HAVE BEEN REVISED TO INCORPORATE REG. GUIDE 1.75 (REV. 2) CRITERIA

1. 2BVM-41 CRITERIA FOR DESIGN AND IDENTIFICATION OF ELECTRICAL CABLE AND RACEWAY SYSTEMS i
2. 2BVM-173 PROCEDURE FOR IMPLEMENTATION l

OF ELECTRICAL SEPARATION (R.G.1.75) REQUIREMENTS

3. 2BVS-931 SPECIFICATION FOR ELECTRICAL INSTALLATION

{

\\

8 i

i' TRAINING PROGRAM I

1.

TRAINING COORDINATOR' i

2.

TRAINING COURSES 1

ifl 3.

ORGANIZATIONS i

i j

l DUQUESNE LIGHT COMPANY a) PROJECT ENGINEERING GROUP j

j b) SITE QUALITY CONTROL I

STONE & WEBSTER ENGINEERING CORPORATION a) PROJECT ENGINEERING GROUP b) SITE ENGINEERING GROUP c) CONSTRUCTION MANAGEMENT 4

SARGENT ELECTRIC COMPANY a) NON-MANUAL b) MANUAL 1

Y i

l e TRACKING SYSTEM DEVELOPED AND l

IMPLEMENTED TO IDENTIFY CASES WHERE SPATIAL SEPARATION IS LESS THAN REG. GUIDE 1.75 (REV. 2)

REQUIREMENTS

1. ELECTRICAL SEPARATION TRACKING SYSTEM (ESTS)
2. CABLE SEPARATION STATUS REPORT (CSSR) h e

=

w

]

to i

DRAWING REVIEW AND ENGINEERING

.WALKDOWN OF THE PLANT TO IDENTIFY SPATIAL SEPARATIONS LESS THAN REG. GUIDE 1.75 (REV. 2) CRITERIA COMPLETED

1. FC.P.-422 ELECTRICAL SEPARATION WALKDOWN PROCEDURE
2. DRAWINGS WERE CHANGED TO i

REFLECT THE USE OF TRAY COVERS TO MEET R.G.1.75 t

i w

A 4_,. _

_h-_.n-

-..A.A_

.4,+

A w


A-a d

~h-A w

u-

-u L-d-e.

l

//

IMPLEMENTION OF R.G.1.75 DESIGN CRITERIA TO ASSURE THE ABILITY TO COMPLY WITH THE SPATIAL REQUIREMENTS OF IEEE 384-1975 I

INSTALLATION

~

STATUS ACTION.

1. MEETS MINIMUM NONE REQUIREMENTS
2. MEETS REDUCED IDENTIFY AND PERFORM

- ALLOWABLES CONSEQUENTIAL WORK 1

3..LESS THAN REDUCED REWORK TO MEET 1 OR 2

)

I m

e s

m e.

/1 FREE SPACE RE0lllREliENTS CABLE (5)'A' TO CABLE (STB ~

C BLE(S)'A' TO CONDUIT $fB

FREE AIR 3~

FREE AIR 2 k~

f b

(~ ~h e

'y 1

_J ap;

-.3

/3 FREE SPACE RE0VIREf1ENTS C ABLE (S)'A' TO TRAY'B~

CABLE (S)'A' TO TRAY'B' FREE AlR TOP & BOTTOM 4' FREE AIR 2(

-2 )~

FREE AIR SIDE RAILS 2k ~

2

[

\\,

2f I

,A B

l B

( -ii/

l/

'~

g 7

2V RATINGS C,X,& K 2

4 RATINGS L&H 9

4

l FREE SPACE REQUIREllENTS CONDUIT (5) TO TRAY CONDUlT(S) TO TRAY FREE AIR TOP & BOTTOM 3' FREE AIR ik ik FREE AIR SIDE RAILSlh" i

L i-3 M

i f

1 e

i I

i i

i 1

U

,7 RATINGS C,X,& K I

FLAT COVERS TOP / BOTTOM RATINGS L&ll VENTILATED COVERS TOP / BOTTOM i

l

(5

)

l CABLE DERATING

  • TRAY COVERS HAVE BEEN DESIGNED TO ELIMINATE THE NEED FOR ADDITIONAL DERATING.

e CABLE WRAP INSTALLATION CRITERIA HAVE BEEN ENGINEERED TO ELIMINATE THE NEED FOR ADDITIONAL DERATING.

i i

+ - - -

-m m-

l l

I ll 6

/

l i

g t

SD O

H TE M

N O

ITATN E

M E

L P

g 4

M I

N O

I T

AR A

P E

S

+

t i

,1 Ii)!i:I4 l!)'

(

l

17 i

IEEE 384-1974 i

l 4.3 METHODS OF SEPARATION. THE SEPARATION OF CIRCUlTS AND EQUIPMENT SHALL BE ACHIEVED BY SAFETY CLASS STRUCTURES, DISTANCE, OR BARRIERS, OR ANY COMBINATION THEREOF.

i i

18 l

l l

I GENERAL

1. ENCLOSE 4KV POWER CABLES f

(H SERVICE LEVEL) l

2. ENCLOSE CONTINUOUS DUTY AND LARGE SIZE POWER CABLES (L SERVICE LEVEL)
3. ENCLOSE CABLES WITH SILTEMP OR l

RACEWAY l

l l

.~

/7 i

TOTAL ENCLOSURE OPEN LADDER CABLE TRAY WITH TOP AND BOTTOM FLAT COVERS l

O

  1. *a c

O"

\\

Y o

/

[NON-VENTILATED;l s -

__.-.n

.... ~

i 20 TOTAL ENCLOSURE OPEN LADDER CABLE TRAY WITH TOP AND BOTTOM COVERS I

/

^

i I

J

/

Y l

/

A g

y c

i

/

,Y W

n I

il g

f e' p.,

I

\\

\\/

VENTlLATED) i

""-"5 5

aa.-

A AA, J-M v

m a

wa,u.

a,

+_.n a

i y

i N

i i

4 l

l l

I l

l l

?

I I

V?

l l

1 1

i

\\

l i

l

..6

}

l l

l l

i l

l l

-m-wo--n---.------ -----ms-------

-w-o------- - -

I 22 GENERAL PLANT AREA OTHER THAN TOTAL ENCLOSURE TOTAL ENCLOSURE (IST SYSTEM;l l

l SINGLE COVER (2ND SYSTEM;l i

D

[

l t

j i, 1"

y 1

A l

.)

I 84-39509 i

23 i

l J

l GENERAL PLANT AREAS OTHER THAN TOTAL ENCLOSURE i

SINGLE COVER (IST SYSTEM;l SINGLE COVER (2ND SYSTEM;I i

I I

{

A i

_l I

y COVERS C 6%" MIN.

I B/N 1

I NOTE: EITHER COVER OR BOTH COVERS MAY BE VENTILATED i

39508A I

24 CABLE SPREADING AREA i

OTHER THAN TOTAL ENCLOSURE REDUCED SEPARATION BETWEEN ONE SYSTEM AND "N" SYSTEM f

l i

l A

a 8" MIN.

l u

1 I

I I

N C AND X SERVICE LEVELS ONLY 39 sui

i 25 I

l CABLE SPREADING AREA OTHER THAN TOTAL ENCLOSURE i

~

TOTAL ENCLOSURE OF ONE SYSTEM j

C OR X TRAY B/N A

i I

i j,,

MINIMUM 4

l l

4 I

' s4 - sssica

k-

.g

),

~

sh s

W L k i

s' w

k g

w

\\

k '

s

\\

\\

m.

k 3

w s

g a

.. K

c..

l-7' M

LLI 1

I

(

k i

s s

.(

+-4

\\

t y.

f, 1

'\\

'A

(

\\

t z.

O

\\

s

(

l l

27 l

IEEE 384-1974 i

5.1.1.2 IN THOSE AREAS WHERE THE DAMAGE POTENTIAL IS LIMITED TO FAILURES OR FAULTS INTERNAL TO THE ELECTRICAL EQUIPMENT OR CIRCUlTS, THE l

MINIMUM SEPARATION DISTANCE CAN BE i

ESTABLISHED BY ANALYSIS OF THE PROPOSED CABLE INSTALLATION. THIS ANALYSIS SHALL BE BASED ON TESTS PERFORMED TO DETERMINE THE I

FLAME RETARDANT CHARACTERISTICS OF THE PROPOSED CABLE INSTALLATION CONSIDERING j

FEATURES SUCH AS CABLE INSULATION AND JACKET MATERIALS, CABLE TRAY FlLL, AND CABLE TRAY ARRANGEMENT.

r i

'(

26 I

TEST PROGRAM THIS TEST PROGRAM IS TO DEMONSTRATE THAT CERTAIN I

DETAILED ARRANGEMENTS OF CABLES AND RACEWAYS i

AS PRESENTLY INSTALLED AT BVPS-2 HAVE INHERENT CONSERVATIVE ATTRIBUTES AND THAT VARIOUS OPTIONAL MEANS EXIST OF ACHIEVING ACCEPTABLE SEPARATION WHICH WOULD MITIGATE THE EFFECT OF CONSEQUENTIAL WORK ON THE SCHEDULE.

j l

i i

i

dk ELECTRICAL SEPARATION LOGIC PERFORM PLANT ELECTRICAL SEPARATION WALKDOWN V

DETERMINE CONFIGURATIONS V

DEVELOP ESSOW t

SUBMIT ESSOW TO TEST LABORATORY FOR:

a) QUOTATION b) TEST PLAN V

FINALIZE TEST PLAN U

PERFORM TESTING

~

if REVIEW RESULTS AND FINALIZE RECOMMENDATIONS

\\

V l

FOR CONFIGURATIONS FOR CONFIGURATIONS SUBMIT RECOMMENDED ACCEPTED NOT ACCEPTED CONFIGURATIONS TO NRC l

f U

U IMPLEMENT CONTINUE WITH PRESENT CRITERIA I

i I

CONFlGURATION #1 CABLES SECURE TARGET

/C1 TO C6 CABLES C7,C8 & C9 WITH PLASTIC TY-RAPS AT l' INTERVALS TO

' l'-0" ENSURE 0" SEPARATION.

MIN TECTIVE SECTION 1 - 1 C7)

C6 (C9 n 1,-0" PROTECTIVE WRAP.h MIN CABLES

~ C1 TO C6 SIDE VIEW NOTES 1.0 FAULT CABLE C6 2.0 TARGET CABLES C7, C8 & C9 3.0 TOTAL LENGTH OF WRAPPED CABLE IS 7'. HALF 0F THE LENGTH IS WITH PROTECTIVE WRAP. THE OTHER HALF WITH SIL TEMP TAPE IIALF LAPPED AND SECURED WITH BANDS OF 3M NO. 69 GLASS CLOTH TAPE EVERY 6".

630

I 3

PARW ER EV IW I

T S

S C

P E

A I

2 S

T R

O R

Y N

P T

p'=t '

O

/

I T

a A

h' R

\\

UG E

I R

F I

N W

O C

S I

S T

= MEm.

c*

E 4

j..

i

!I

,a i

~

32 CONFIGURATION #3 VERTICAL TRAY WITil SOLID COVER 4 7

_0N SIDE NEAREST VERTICAL STACK

~ HORIZONTAL TRAYS WITH

+ i"

'looooooo

_ Tl 'K' T R AY S SOLII) COVERS,NON VENTED

. TOP ONLY)

(

=

'I0000000 l-T2 'K' TRAYS

// =w,,y a

'I M.W N a l'

T3 C' TRAYS

/

b

=_

gs m -

'I m l'__

T4 X TRAYS I-I

+'

_V ERTICAL'C" T RAY V ERTICAL*C" TRAY

_ ITHOUT COVER W

}vlTH SOLID COVER SOLID

'N

'Y' COVERS I

T5

+

T6 o

i I

- l-O

'K" TRAYS V

i-I s

Tl tn i

  • K' TRAYS is s

T2 5- - ~ i.

is e

i i%

"C" TR AYS is x

i

. j- ' '4 n

o i

T3 J

i i

i I

l "X" _ TRAYS q

T4, i

\\

i i

a l

1

- g'.0" 1'0"7

-*i1'0" I

i o

-D l

W...

~D

~

33 PERI'., t; AL,KDOLN,-

4-2-84 INTERNAL PNL WIRING 3 g 8] _ _

3 I

9-15-84

  1. 0'2-84 i

, PROCURE

% PROTECTIVE O -(2-15-84 WRAP

!9-1-84

-=-

,(

Pay mp W@ P.O.

m

^

'" 20VS-93I L

g.g_gg REVISE f[ Q #

FOR T E S T I NG' ADDRESS ESSOW. COMPLETE l

C

/

ITEST 8'ROGRAM

[

\\

n n

4-2-84 6-1-85 g

IN PROCESS IDENTIFICATION OF REQUIRED REVISE MW

_I Sf A T__l_ A,,L,,_ SEP AR A T I ON (ON GntNG)I g

g

(

l s PERFORM WALKDOWN f.

IDENTIFY TIE TO CONSTRUCTION 8-30-84 1 SCHEDULE

,e eg REDUCED SPATIAL SEPARATION DEVELOP

_DY, BUILDING)

A7_,i,,4

(

WALKDOWN PROCEDURES

(

g

{

f RESOLUTION OF SPATidL SEPARATION CONC Rf45 l

l l

(CONSEQUENTIAL WORK) 3-1-86 C

1 I

i l

l RESOLUTION l

l 9-30-84 APPROX.

I OF SEPAR4 TION g 3 MO. PRIOR CON _CERNS IDENTIFIED; g

TO FUEL LOAD a

IN WALKDOWN (REWORK) l l

IMPLEMENT

[

O g

l TRACKING p

g I

SYSTEM

/---

3 l

I l

{

t I

/

I l

\\

DEVELOP TRACKING

/

e

'SYS._ CONCEPT g

, UTILIZE ELECT. SEPARATION ( T_R,ACKING SYSTEM (ON GOING),

7 7

p I

C I

I l l SYSTEM (D EXIST.

CDNT.

g INCORPORATE INTO I

TRACKING g

STRUCTURAL

?

l ELECTRICAL' DEVELOP REVIEW PROGRAM i l

)

TYP. ENCLOSURE (WRAPS, I l 0.I.

RESPONSE

/

J ('. c'S.E.R,'O, _,-,- - - - - - - - - - - - y COVERS. DARRIERS)\\

j

\\\\

y_ __ _j 3

INFORMATION AS OF 8-I-84 f

AMPACITY REVIEW (

ELECTRICAL SEPARATION CRiTEREA TRAINING PROGRhM ION GOING)

/

OF __T R A Y S_

_j I

COMPLIANCE SCHEDULE REGULATORY GUIDE 1.75 DEAVER VALLEY POWER STATION UNIT 2 A

e

g, O

ga 4'*!

  • W~5'0 41 7

C f

r A

f Y

n 4

7 NM2 M$

4

~

I g

n i

t

~

s t

F h M-NM/ MM h

A h

A c

f AV s

1 e

M 8

A A

/

=

MAO

=

9

)

O

  • 1 j

I M

W p

f q,

M gM l

p p

g g$

4 p

y I

g 4

g *9 e

y s

g p

a g m

p

.s e

y g

s y

g M

a t

j M#

g l

m I

T

[

r L

A A

U M

[

AV y

1 G

5 g

t E

Q. %

/.

N' g g g

MAf4 S

L L

O a a IMW/-M_

A B

R g

G O

1 f

J O

C L

O T

q p 3

8 I

S.T O

L C

q g

D T

R B

A y A E

q l

S L

L E

A I

B U

L T

E *o L

E S

g 8I t

A E

N O

i R

9 I

F R M j

R 2 A

E V

N O

N C

T I

W I

E R

4 R

S*

f l

K O

\\

qO I

T n

t U

M V

t T

N 0

i E

E 4

C I

e M

A R

i A

X C

S I

C I

I U b v

R A

O.Mt

/

J E

m M

C P

S S

I E

E l 0 t

A I

t A

I RAS S.-

95 I

R V

S 7

. z E

O L

V I. R^

e S

R S

n R

),

f E

E S

C P

E AAV O

P Y

/

V N

S S

R LO E

O N

P C

A A

M R

R W

C U

A Y

f C

A E

T R

A W

T E

W N

R W

R E

L Y

W X

T L

S

~

I G

S A

R R

U E

S

' A N

S U

T A

L A

JQ R

B I

T S

A C

M^Y U

4 T

R C

O M.

4 E

N C

S V

s 1

f O

Rj D

O AG 9

Z 7

E l

E C

)(

t 9

T 0 1

V J

9 A 0 J

P O

Y

_/

/

/_

A 6

8

_'H 2,

a1 E

C s

R l

p

~

/

T Sm 3 S, T

,/

3 i

r.

S t

}/ Y 1

t E

I A

gT

/

/

y t

UEJ 2-L R

g G

s A

n nA

_ f k. -

T O

_f r

fZ El T

w Gg p

T a

S s

I U

w" Hs2O L

n SD O F

A l O E

  1. S i

r p 'M u

4 H

p 9

a I

E N

4P A

e

/

n

$l M9 R/

[k 9

e 1

L A

l 4R L

n

% '# F M FW 1

e AA n

O J

M f

p 1

H F FJ p

m. 9 N

a

  1. f f

A M1 r 9 R

S e

/

4 R

t n s M W A

a E f Wf t

n M M, N '9 P

/

%n/

Ae J

M n

nR A

/

0 4f A

7MA

/

W W-r 2( M l

uW m

AM I

f.

r S

l V

% f W f /.

_&e

)

'p 1

7 A

Y 1

R r

'p t

A M 6w a

A 1

E t

d

&M A

A9 J

A V

3 A

f pm/

A 8

f O

J 4

Chs

'0 l

O R -

f0 /

'9 9

nt e

O

,M A

C t

A W/'o Xf

//

%Jn wW/

0 f

f 4/

/

4 t

t i

Y N

0 4f rh r

A, g */ f M

'f /

A e

/f A

WA f

AyN f f/WM A

R faM

/

fs /

/

TO t

f f#S M/4F/fMW,7 !

f 4

I A/

4 d /

t M/A

/

M/M/W2H9fN9/

/

I Yf

/

7 R

E A

R A

/A W

(

d

/

d e

i

/

M e

'9 M f # ~t /

cf n

f A N

e/W74

  1. ff J M V (8A

/

r /r t

I i

/

df 7

/ f A f @l R. f /

  • A f

eS 7

AA f t Ah

  1. nM7 l

7/F AG

/

A rt

(

uA f

/ l g r e

9 14, *A A

A U)J M0 O

J I

W j

l:

geff t

/

epP t

F s

n j

'.\\il' illil;{

i!!

?i

l\\

l ii'

D9 hI ec C.5-m n

O e

=

, w n

e D

A c

0 n

e O.

b m

T M

5,

>c O.

8 e-lL

$k

'1-iO j

90 4e GC sw ON d5 d s

c T

O e

C Or d

m m

e m

g 20

a. c.

W

-w

'0 g=

e z

  • P*

W o

e i z

c C-b

"($ Zl

=w o_

m m

4-CZ L.

M N

O M.

G bb u

y e

c e

c

g g g c5 g N

F e

m i,,,

W I

V>

O lu = w

-g=

i l

g WCv U

ZW

?

P M

C

$3 g

c c

e e

c w

o o

o o

o e

wm O

~

4) e e r

y l

['

~,

..k c

-l-c-

O b

p a

w O

M S

m W

'n W

v 5

y,&

s i

i C

b.

N

~

r 2_;

O' 8

i G

g

]

5 5

5 L-2 L

6-1 I

g t

1 4

1 t

t

\\

e

. c.

3 vLe

.a s9 G.

t e uM R

.l' oA 3

3 6

B s1 G

s Y

t 1~

t 1

4 h B E

t 1

S 3

\\

i pC t

z 3

E T

wmt A

o

._ o.

D O D 6

,. a 3

1-F 2

I 1

)

T 1

G.

R D

E

(

.M P

V L

EU O

LO S

C g

B R E

l OG R

.R

.P E L

o

- N OIB G.

8 6

6 0

6-o I

.l S

R E

~

4 I

1 2

t A N i

O Y

.R P B

.A S PE D

B 5

3-

.E R E

S 3

3 E

l 4

S 6

o 2

4

.S V

D I

I t

1 L

t Y

\\

3 B O

. D S

E E

..Co T

. Ut 5

DA E

6 4

6 0

7 3

oi 4

3

)

E B

3 1

4 q

4 1

2 9

E C

B 2

4 0

1 1

5 t

.I P

O 5

1 I

1 l Y T

l l

T A

l.iY

.T B

.E R A

3 0

s 6

3 3

7 7

5 3

6 5

4 7i 3

S L

5 3

o 5

3

.S Y 2

6 3

9 1

l' 3

1 7

L A T

1 1

O l

N t

T M

U S

_ L P

C J

s T

X B

J S

T X

X T

X X p_

A E

C C

C C

C J

J J

J J

S T

T XE T

Y O

T T

O 4

i.

I;,f j* i' l

!1

t PROBLEM TOTALS SY BUILDING BY TYPE TYPE BLDG CX SS TT TOTAL' A3 55 169 55 279 CA 125 96 125 346 C3 246 82 246 574 DG 22 20 22 64 F3 1

7 1

9 MH 42 36 42 120 RB 108 160 108 376 RC 31 56 31 118 SB 136 149 136 421 SG 12 90 12 1.14 T3 27 9

27 63 VP 4

1 0

5 TOTAL 809 875 805 2,489 l

t I

l to N

~

- - -, - -,,, - +

-a

---n

-e.

NRC I&E UNRESOLVED ITEM 82-05-01 o

SEPARATION CRITERIA LESS RESTRICTIVE THAN R.G.1.75!!EEE 384 RESPONSE: BVPS 2 HAS COMMITTED TO R.G.1.75, REV.2 o

NUMEROUS NONCONFORMANCES IDENTIFIED AGAINST LESS RESTRICTIVE CRITERIA CONTAINED IN 2BVS-931 RESPONSE: BVPS-2 PROGRAM TO IDENTIFY, TRACK, AND RESOLVE NONCONFORMANCES DISCUSSED IN THIS MEETING. TRAINING PROGRAM INSTITUTED TO MINIMlZE FUTURE INSTANCES OF NON-CONFORMANCE o

FAILURE TO COMPLY WITH NETWORK

SUMMARY

(JUNE 1983) REGARDING UPDATING OF 2BVM-41 AND i

2BVS 931 FOR COMPLIANCE WITH R.G.1.75/IEEE 384 i

RESPONSE: THE NETWORK

SUMMARY

HAS BEEN UPDATED TO REFLECT CHANGES IN SCHEDULE AND COMMITMENTS WITH RESPECT TO R.G.1.75, REV. 2 Co cp

s.

ATTACHMENT 3 NOTES OF CONFERENCE J.O.No. 12241 ELECTRICAL SEPARATION PRESENTATION TO NRC BEAVER VALLEY POWER STATION - UNIT NO. 2 DUQUESNE LIGHT COMPANY Held at Beaver Valley Power Station Present for:

Duquesne Light Company Shippingport, PA Duquesne Light Company (DLC)

August 30, 1984 J. M. Arthur J. J. Carey E. J. Woolever H. M. Siegel N. R. Tonet J. D. Sieber K. Grada R. Coupland J. F. Konkus R. J. Swiderski D. Schmitt G. L. Beatty E. Horvath J. Koepfinger Nuclear Regulatory Commission (NRC),

M. Ley J. Knox G. A. Walton W. Troskoski L. Tripp C. Anderson Stone & Webster Engineering Corporation (SWEC)

P. RaySircar J. D. Sutton C. H. Wilbur P. J. Bienick E. F. Heneberry F. P. Walker G. P. Eckert E. Andre PURPOSE The purpose,of the conference was to inform representatives of the Nuclear Regulatory Commission of the present status and future activities of the BVPS-2 Electrical Separation Program. The meeting agenda and a copy of each of the slides used.in the DLC presentation are provided as Attachments 1 and 2.

B4-1224106-51

e 2

DISCUSSION The, presentation was initiated with a summary of the results of the December 20, 1983 meeting and a discussion of the progress of the BVPS-2 Electrical Separation Program.

Specif'c accomplishments cited for the pro-gram included:

i.

Development and implementation of design criteria and installation documents reflecting the R.G. 1.75 criteria.

ii.

Development and implementation of a training program for engi-neers, designers, QC, and construction personnel.

iii. Development and implementation of a computer-based system to track existing separation problems.

iv.

Completion of an engineering walkdown of the plant to identify spatial separations less than the R.G.

1.75 criteria.

Important terminology used in the separation program was presented and defined.

(See Slides 2 through 5 in Attachment 2.)

It was reported that the engineering walkdown identified 1108 cases where rework was required. Of these, only 50 are remaining to be resolved by SWEC engineering and 348 by the electrical contractor's design group.

Engineer-ing will complete disposition of these items by September 30, 1984.

The design group's target for completion is also September 30, 1984.

Construction has committed to complete rework on all items by January 1, 1985.

The presentation also noted that new work is proceeding in a fashion that will allow the installation of covers and wraps as shown in the engineering docusents (specifications, drawings, etc.).

A schedule was presented (Attachment 2, Slide 34) that indicated that consequential work will start approximately April 1985.

Details of the proposed consequential work designs to satisfy Regulatory Guide 1.75 (Rev. 2) s.eparation criteria (e.g., tray covers and cable wraps) were presented.

Slides 19 through 25 provide some of these details.

A sam-ple of the Sil-temp material which will be employed for cable wrapping (where required) was offered for inspection.

It was indicated that the detail designs would be documented in an amendment to Section 8.3 of the BVPS-2 FSAR.

A test program, which should justify reductions in the scope of the conse-quential work requirements, was described.

NRC representatives noted that this represented a change in program emphasis as previously discussed in December 1983 and expressed interest in reviewing the proposed test program.

The test program will be discussed with the NRC during the next licensing meeting, expected during the last week of September 1984.

It was stressed to the NRC that BVPS-2 would successfully meet R.G.

1.75 criteria with the B4-1224106-51

+

3 present. separation program, even if the test program results do not estab-lish the bases for reductions in consequential work scope.

An updated schedule for the program (Slides 33 and 34) was also presented.

The presentation was concluded with a review of the issues raised by Region I personnel in Unresolved Inspection Item 82-05-01.

DLC indicated that it felt that all of the issues had been addressed in the presentation and therefore hoped that this item could be closed.

At. the conclusion of the presentation, a plant tour was conducted which included the rod control area, the cable spread area, and the main control room.

The purpose was to show installations with insufficient separation which required rework to meet the separation criteria.

An installation using the protective Sil-temp wrap was also viewed.

DLC stated it would issue minutes of the meeting to the NRC by September 15, 1984.

In addition, a meeting with Mr. John Knox (NRR) was tentatively scheduled for September 26 to review the proposed plan for meeting the sepa-ration requirements, address the test plan, and provide details of accept-able consequential work designs.

DWDodson:AF3 Enclosures -

B4-1224106-51