Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20098D303 + (12:05:01, 13 December 2024)
- RBG-18891, Interim Deficiency Rept DR-236 Re Piston Wrist Pins in Standby Diesel Generator Supplied by Tdi.Next Rept Will Be Submitted by 841128 + (12:05:01, 13 December 2024)
- ML20098D299 + (12:05:02, 13 December 2024)
- ML20098D294 + (12:05:09, 13 December 2024)
- ML20098D289 + (12:05:15, 13 December 2024)
- GL-705356-25, GLTS: Past Due General License Device Annual Registration - Pepsi-Cola Bottling Company - (GL-705356-25) + (12:05:16, 13 December 2024)
- ML20098D280 + (12:05:18, 13 December 2024)
- ML20098D278 + (12:05:25, 13 December 2024)
- ML20098D274 + (12:05:35, 13 December 2024)
- ML20098D273 + (12:05:36, 13 December 2024)
- ML20098D272 + (12:05:37, 13 December 2024)
- ML20098D269 + (12:05:38, 13 December 2024)
- ML20098D270 + (12:05:38, 13 December 2024)
- PY-CEI-NRR-1502, Confirms That Commitment,Contained in ,To Incorporate New Limit on Drywell Unidentified Leakage Rate Increase Limit Into Plant Procedures Completed.Sections of Applicable Procedures Encl + (12:05:39, 13 December 2024)
- ML20098D261 + (12:05:40, 13 December 2024)
- ML20098D255 + (12:05:41, 13 December 2024)
- JAFP-20-0030, Response to Request for Additional Information in Support of License Amendment Request - Proposed Changes to the Technical Specifications to Primary Containment Hydrodynamic Loads + (12:05:42, 13 December 2024)
- ML20098D244 + (12:05:43, 13 December 2024)
- ML20098D224 + (12:05:50, 13 December 2024)
- ML20098D204 + (12:05:51, 13 December 2024)
- ML20098D199 + (12:05:52, 13 December 2024)
- DCL-92-113, Forwards Public Version of Updates to Corporate Emergency Response Plan Implementing Procedures,Including Rev 11 to 1.1,Rev 5 to 3.1,Rev 11 to 3.2,Revs 5 to 3.5 & 3.7,Revs 6 to 4.2 & 4.4,Rev 12 to 4.3,Rev 8 to 4.5 & Revs 10 to 4.7 & 4.9 + (12:05:53, 13 December 2024)
- ML20098D191 + (12:05:53, 13 December 2024)
- PMNS20200321, Subsequent License Renewal Lessons Learned Meeting 4 + (12:05:54, 13 December 2024)
- ML20098D183 + (12:05:56, 13 December 2024)
- ML20098D177 + (12:06:03, 13 December 2024)
- ML20098D171 + (12:06:10, 13 December 2024)
- LD-92-068, Responds to Issue of Diversity for Digital Instrumentation & Control Sys for Sys 80+,delineated in NRC .Best Estimate Analysis Underway in Order to Make Realistic Assessment of Plant Performance Given Computer Failure + (12:06:18, 13 December 2024)
- ML20098D165 + (12:06:20, 13 December 2024)
- ML20098D166 + (12:06:20, 13 December 2024)
- ML20098D164 + (12:06:21, 13 December 2024)
- ML20098D163 + (12:06:22, 13 December 2024)
- ML20098D161 + (12:06:22, 13 December 2024)
- ML20098D160 + (12:06:23, 13 December 2024)
- A14108, Proposed TS 3/4.1.1,3/4.1.2 & 3/4.1.3 Re Reactivity Control Sys,Boration Sys & Movable Control Assemblies,Respectively + (12:06:24, 13 December 2024)
- B14108, Application for Amend to License NPF-49,changing TS Figure 3.1-5, Required Shutdown Margin for Mode 5 W/Rcs Loops Not Filled, Section 3.4.1.3, RCS - Hot Shutdown & 4.4.1.1.3, RCS - Hot Shutdown Surveillance Requirements + (12:06:25, 13 December 2024)
- ML20098D148 + (12:06:38, 13 December 2024)
- ML20098D141 + (12:06:39, 13 December 2024)
- ML20098D137 + (12:06:40, 13 December 2024)
- 3F0420-02, 2019 Radiological Environmental Operating Report + (12:06:41, 13 December 2024)
- 3F0420-01, 2019 Annual Radioactive Effluent Release Report + (12:06:42, 13 December 2024)
- ML20098D128 + (12:06:43, 13 December 2024)
- ML20098D123 + (12:06:44, 13 December 2024)
- ML20098D125 + (12:06:44, 13 December 2024)
- ML20098D119 + (12:06:45, 13 December 2024)
- ML20098D112 + (12:06:46, 13 December 2024)
- LIC-95-0191, Forwards Rev 0 of Analysis EA-FC-95-027, DG Offnormal Loading Due to Full Speed Start ETP-6.5-DGT Re Operability of DG One (DG-1).Analysis Concluded That DG-1 Operable Under Conditions Discovered on 950824 + (12:06:47, 13 December 2024)
- ML20098D109 + (12:06:47, 13 December 2024)
- U-602505, Monthly Operating Rept for Sept 1995 for Clinton Power Station + (12:06:48, 13 December 2024)
- ML20098D092 + (12:06:49, 13 December 2024)
- ML20098D090 + (12:06:49, 13 December 2024)