_ _ _ _ _ _ _ _ _ _ _ _ _ _ _

)

e 8

lilinoes Power Company Clinton Power Station P.O. Box 678 Clinton, IL 61727 Tel 217 935 8881 ILLINSIS P(WWER "ifE $0 0y.ie 8E.100c October 4, 1995 l

l 10CFR50.36 l

Docket No. 50-461 U.S. Nuclear Regulatory Commission i

Document Control Desk Washington, D.C.

20555

{

Subject:

Clinton Power Station, Unit 1 Facility Operating License NPF-62 Scotember 1995 Monthly Operatine Reoort

Dear Sir:

Please find in Attachment 1 the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending September 30, 1995.

Sincerely yours

/

l l

Richard F. Phares l

Director - Licensing MCH/krm Attachment 1

cc:

NRC Region III Regional Administrator l

NRC Resident Office, V 690 Illinois Department of Nuclear Safety 1

P 100113 1

9510110095 950930

[

l PDR ADOCK 05000461 R

PDR I

AttcchmInt 1 to U-602505 Page 1 of 4 4

CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Month Seotember 1995 None 1

4 4

4

~

Attechmsnt 1 to U-602505 Page 2 of 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-461 UNIT Clinton 1 DATE 09/30/95 COMPLETED BY M. C. Hollon TELEPHONE (217) 935-8881 X3537 MONTil September 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 904 17 911 2

907 18 912 l

3 902 19 912 4

907 20 913 5

906 21 914 1

6 907 22 913 7

908 23 914 8

750 24 913 9

26 25 915 10 0

26 915 11 5

27 915 12 260 28 915 13 548 29 915 14 800 30 916 15 915 31 NA 16 908 l

l i

l

i 4

e Attechment 1 to U-602505 Page 3 of 4 4

OPERATING DATA REPORT i

f DOCKET NO.

50-461 i

UNIT Clinton 1 DATE 09/30/95 COMPLETED BY M. C. Hollon a

TELEPHONE (217) 935-8881 X3537 OPERATING STATUS 1.

REPORTING PERIOD:

Seotember 1995 GROSS HOURS IN REPORTING PERIOD: 22Q 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 232/1

. MAX, DEPEND. CAPACITY (MDC) (MWe-Net): 212

~

DESIGN ELECTRICAL RATING (MWe-Net): 211 a

i 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):

None l

4.

REASONS FOR RESTRICTION (IF ANY): N/A j

j THIS MONTH YR TO DATE CUMULATIVE a

5.

NUMBER OF HOURS REACTOR WAS CRITICAL...

673.9 5.224.8 50.976.7 6.

REACTOR RESERVE SHUTDOWN HOURS.........

0.0 0.0 0.0 7.

HOURS GENERATOR ON LINE................

653.5 5.105.1 49.529.5 i

8.

UNIT RESERVE SHUTDOWN HOURS............

0.0 0.0 4.0 9.

CROSS THERMAL ENERGY GENERATED (MWH)... 1.803.497 13.697.089 132.163.287 4

l 10.

CROSS ELECTRICAL ENERGY GENERATED (MWH) 586.951 4.480.989 43.637.940 11.

NET ELECTRICAL ENERGY GENERATED (MWH)..

558.375 4.266.717 41.542.895 i

12.

REACTOR SERVICE FACTOR.................

93.6%

79.8%

74.1%

13.

REACTOR AVAILABILITY FACTOR............

93.6%

79.8%

74.1%

14.

UNIT SERVICE FACTOR....................

90.8%

77.9%

72.0%

i 15.

UNIT AVAILABILITY FACTOR...............

90.8%

77.9%

72.0%

i 16.

UNIT CAPACITY FACTOR (Using MDC).......

83.4%

70.0%

64.9%

i 17.

UNIT CAPACITY FACTOR (Using Design MWe) 83.1%

69.8%

64.7%

18.

UNIT FORCED OUTAGE RATE................

9.2%

4.2%

8.7%

19.

SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH):

None 20 IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA

i ne l

Attcchment 1 to U-602505 Page 4 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS I

DOCKET NO. 50-461 UNIT Clinton 1 l

DATE 09/30/95 COMPLETED BY-M. C. Hollon TELEPHONE (217) 935-8881 X3537 REPORT MONTH Seotember 1995 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE NO.

DATE S: SCHEDULED (HOURS)

REASON (1)

REDUCING POWER (2) ACTIONS / COMMENTS I

95-07 950909 F

66.5 A: Plant shutdown to locate 1: Reactor manually Air leak located (from and repair an air leak shutdown in an abardoned air supply which was causing over-accordance with line) and repaired.

pressurization of the plant operating Complered other work Drywell.

procedures.

included in outage scope. Resynchronized to grid on 9/11.

Returned to full power on 9/14.

1

[

(1), Reason A-Equipment Failure (explain), B-Maintenance or Test, C-Refueling, D-Regulatory Restriction, E-Operator Training & License Examination, F-Administrative, G-Operational Error (explain),

H-Other (explain)

(2) Method 1-Manual, 2-Manual Scram, 3-Automatic Scram, 4-Other (explain)

'