U-602505, Monthly Operating Rept for Sept 1995 for Clinton Power Station
| ML20098D095 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 09/30/1995 |
| From: | Hollon M, Phares R ILLINOIS POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| L30-95(10-04)LP, L30-95(10-4)LP, U-602505, NUDOCS 9510110095 | |
| Download: ML20098D095 (5) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
)
e 8
lilinoes Power Company Clinton Power Station P.O. Box 678 Clinton, IL 61727 Tel 217 935 8881 ILLINSIS P(WWER "ifE $0 0y.ie 8E.100c October 4, 1995 l
l 10CFR50.36 l
Docket No. 50-461 U.S. Nuclear Regulatory Commission i
Document Control Desk Washington, D.C.
20555
{
Subject:
Clinton Power Station, Unit 1 Facility Operating License NPF-62 Scotember 1995 Monthly Operatine Reoort
Dear Sir:
Please find in Attachment 1 the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending September 30, 1995.
Sincerely yours
/
l l
Richard F. Phares l
Director - Licensing MCH/krm Attachment 1
cc:
NRC Region III Regional Administrator l
NRC Resident Office, V 690 Illinois Department of Nuclear Safety 1
P 100113 1
9510110095 950930
[
l PDR ADOCK 05000461 R
PDR I
AttcchmInt 1 to U-602505 Page 1 of 4 4
CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Month Seotember 1995 None 1
4 4
4
~
Attechmsnt 1 to U-602505 Page 2 of 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-461 UNIT Clinton 1 DATE 09/30/95 COMPLETED BY M. C. Hollon TELEPHONE (217) 935-8881 X3537 MONTil September 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 904 17 911 2
907 18 912 l
3 902 19 912 4
907 20 913 5
906 21 914 1
6 907 22 913 7
908 23 914 8
750 24 913 9
26 25 915 10 0
26 915 11 5
27 915 12 260 28 915 13 548 29 915 14 800 30 916 15 915 31 NA 16 908 l
l i
l
i 4
e Attechment 1 to U-602505 Page 3 of 4 4
OPERATING DATA REPORT i
f DOCKET NO.
50-461 i
UNIT Clinton 1 DATE 09/30/95 COMPLETED BY M. C. Hollon a
TELEPHONE (217) 935-8881 X3537 OPERATING STATUS 1.
REPORTING PERIOD:
Seotember 1995 GROSS HOURS IN REPORTING PERIOD: 22Q 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 232/1
. MAX, DEPEND. CAPACITY (MDC) (MWe-Net): 212
~
DESIGN ELECTRICAL RATING (MWe-Net): 211 a
i 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
None l
4.
REASONS FOR RESTRICTION (IF ANY): N/A j
j THIS MONTH YR TO DATE CUMULATIVE a
5.
NUMBER OF HOURS REACTOR WAS CRITICAL...
673.9 5.224.8 50.976.7 6.
REACTOR RESERVE SHUTDOWN HOURS.........
0.0 0.0 0.0 7.
HOURS GENERATOR ON LINE................
653.5 5.105.1 49.529.5 i
8.
UNIT RESERVE SHUTDOWN HOURS............
0.0 0.0 4.0 9.
CROSS THERMAL ENERGY GENERATED (MWH)... 1.803.497 13.697.089 132.163.287 4
l 10.
CROSS ELECTRICAL ENERGY GENERATED (MWH) 586.951 4.480.989 43.637.940 11.
NET ELECTRICAL ENERGY GENERATED (MWH)..
558.375 4.266.717 41.542.895 i
12.
REACTOR SERVICE FACTOR.................
93.6%
79.8%
74.1%
13.
REACTOR AVAILABILITY FACTOR............
93.6%
79.8%
74.1%
14.
UNIT SERVICE FACTOR....................
90.8%
77.9%
72.0%
i 15.
UNIT AVAILABILITY FACTOR...............
90.8%
77.9%
72.0%
i 16.
UNIT CAPACITY FACTOR (Using MDC).......
83.4%
70.0%
64.9%
i 17.
UNIT CAPACITY FACTOR (Using Design MWe) 83.1%
69.8%
64.7%
18.
UNIT FORCED OUTAGE RATE................
9.2%
4.2%
8.7%
19.
SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH):
None 20 IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA
i ne l
Attcchment 1 to U-602505 Page 4 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS I
DOCKET NO. 50-461 UNIT Clinton 1 l
DATE 09/30/95 COMPLETED BY-M. C. Hollon TELEPHONE (217) 935-8881 X3537 REPORT MONTH Seotember 1995 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE NO.
DATE S: SCHEDULED (HOURS)
REASON (1)
REDUCING POWER (2) ACTIONS / COMMENTS I
95-07 950909 F
66.5 A: Plant shutdown to locate 1: Reactor manually Air leak located (from and repair an air leak shutdown in an abardoned air supply which was causing over-accordance with line) and repaired.
pressurization of the plant operating Complered other work Drywell.
procedures.
included in outage scope. Resynchronized to grid on 9/11.
Returned to full power on 9/14.
1
[
(1), Reason A-Equipment Failure (explain), B-Maintenance or Test, C-Refueling, D-Regulatory Restriction, E-Operator Training & License Examination, F-Administrative, G-Operational Error (explain),
H-Other (explain)
(2) Method 1-Manual, 2-Manual Scram, 3-Automatic Scram, 4-Other (explain)
'