Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20098E165 + (12:00:40, 13 December 2024)
- LD-92-071, Requests That Mailing List for Sys 80+ Project Be Revised as Indicated on Encl.Eh Kennedy Should Be Replaced W/Cb Brinkman + (12:00:41, 13 December 2024)
- 05000247/LER-1984-011, :on 840813,at Cold Shutdown,Two Component Cooling Water Pumps & Standby Pump Tripped on Overcurrent Protection Signal.Caused by Wetting of Pump Motors.Pumps Returned to Svc + (12:00:43, 13 December 2024)
- 05000302/LER-1992-005, :on 920429,determined That EDG Could Exceed Max Rating for Certain Makeup Pump Operational Lineups. Caused by Failure to Analyze Consequences of Loss of Offsite Power Event.Surveillance Procedures Revised + (12:00:45, 13 December 2024)
- LD-92-070, Discusses Sys 80+ Human Factors Engineering Review Criteria, Per 920519 Meeting.Text of Draft SER Should Clearly State That Work Continuing w/ABB-C-E Through Public Meetings to Converge on Set of Criteria for Review of Nuplex 80+ + (12:00:46, 13 December 2024)
- ML20098E158 + (12:00:46, 13 December 2024)
- ML20098E138 + (12:00:47, 13 December 2024)
- ML20098E128 + (12:00:48, 13 December 2024)
- ML20098E129 + (12:00:48, 13 December 2024)
- ML20098E126 + (12:00:49, 13 December 2024)
- BSEP-84-2024, RO 1-84-17:on 840821,normal Sys Flow in Unit 1 RHR Svc Water Loop B Could Not Be Established.Cause Unknown.Next Rept Will Be Submitted by 841022 + (12:00:50, 13 December 2024)
- ST-HL-AE-4106, Forwards Rev 19 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) + (12:00:50, 13 December 2024)
- ML20098E119 + (12:00:52, 13 December 2024)
- PLA-2308, Special Rept:On 840614 & 23,RCIC Sys Initiated Per Tests 14.4 & 14.2.On 840623 & 24,addl Tests Initiated.Caused by Concern About Electrical Overspeed Trip Circuitry + (12:00:52, 13 December 2024)
- RBG-36895, Responds to Violations Noted in Insp Rept 50-458/92-08 on 920301-0411.Corrective Actions:Change Notices Initiated to Require Appropriate Sections of Maint Lifting Procedures to Be Completed Prior to Performing Surveillance Tests + (12:00:53, 13 December 2024)
- ML20098E112 + (12:00:54, 13 December 2024)
- ML20098E109 + (12:00:55, 13 December 2024)
- ML20098E106 + (12:00:56, 13 December 2024)
- U-601986, Forwards Rev 1 to Clinton Power Station Core Operating Limits Rept for Reload 3,Cycle 4. GE Reviewing Condition for Reportability,Per 10CFR21 Re MCPR Limits Contained in Previously Submitted Core Operating Limits Rept + (12:00:57, 13 December 2024)
- 05000416/LER-1984-039, :on 840818,reactor Water Cleanup Sys Tripped When Containment Isolation Valve Closed.Cause of Isolation Signal Could Not Be Determined + (12:00:59, 13 December 2024)
- ML20098E097 + (12:01:00, 13 December 2024)
- 05000321/LER-1984-010, :on 840820 & 22,reactor Water Cleanup (RWCU) Inboard Isolation Valve G31-F001 Closed.Caused by High Ambient RWCU Temp Trip Signal.Room Temp Reduced.Valve Returned to Svc + (12:01:02, 13 December 2024)
- PY-CEI-NRR-0114, Provides Response to SER Confirmatory Issue 54 Re Preoperational & Periodic Testing Plans for Porous Concrete Subsystem of Permanent Dewatering Sys + (12:01:03, 13 December 2024)
- ML20098E070 + (12:01:04, 13 December 2024)
- ML20098E079 + (12:01:04, 13 December 2024)
- ML20098E069 + (12:01:05, 13 December 2024)
- ML20098E062 + (12:01:06, 13 December 2024)
- ML20098E059 + (12:01:06, 13 December 2024)
- ML20098E047 + (12:01:07, 13 December 2024)
- RBG-36-887, Provides Response to Violations Noted in Insp Rept 50-458/92-09.Corrective Actions:Nuclear Licensing Issued Memo to Responsible Dept Head That Requested Response Prior to Jan 1991 + (12:01:08, 13 December 2024)
- ML20098E029 + (12:01:09, 13 December 2024)
- ML20098E026 + (12:01:10, 13 December 2024)
- ML20098E019 + (12:01:10, 13 December 2024)
- ML20098E015 + (12:01:11, 13 December 2024)
- ML20098E014 + (12:01:11, 13 December 2024)
- ML20098E006 + (12:01:13, 13 December 2024)
- ML20098E005 + (12:01:13, 13 December 2024)
- ML20098E002 + (12:01:14, 13 December 2024)
- ML20098E001 + (12:01:14, 13 December 2024)
- ML20098E000 + (12:01:15, 13 December 2024)
- PY-CEI-NRR-1497, Forwards Plant Mod & Procedure Changes Re Implementation of Staff Recommendations to Conform W/Station Blackout Rule Per 10CFR50.63 + (12:01:16, 13 December 2024)
- ML20098D997 + (12:01:18, 13 December 2024)
- ML20098D996 + (12:01:21, 13 December 2024)
- ML20098D995 + (12:01:22, 13 December 2024)
- ML20098D994 + (12:01:23, 13 December 2024)
- ML20098D993 + (12:01:23, 13 December 2024)
- ML20098D992 + (12:01:24, 13 December 2024)
- 05000374/LER-1984-021, :on 840515,reactor Water Cleanup Sys Isolated on High Differential Flow.Caused by Outlet Valve Opening, Allowing Water to Backflow Into post-strainer & Drain to Radwaste + (12:01:26, 13 December 2024)
- ML20098D989 + (12:01:30, 13 December 2024)
- 3F0592-17, Special Rept 92-01,on 920506,reactor Bldg Purge Exhaust Duct Monitor Was Taken Out of Svc.Caused by Inability to Calibrate RM-A1 Noble Gas Activity.Monitor mid-range Channel Was Recalibrated + (12:01:31, 13 December 2024)
- ML20098D986 + (12:01:31, 13 December 2024)
- ML20098D982 + (12:01:32, 13 December 2024)