Text
....... _..... _ _ _ _ _ _...
4 h
k Tennew,e PEey1Chiw once ea, no occit AAA, Am
~
~ ~ ~ ~
M f 2 2 1992 O J 'lW Zenngue wce Pres: cent. Browr s Ferry Owa:&s U.S. Nuclear Regulato.
Commassion ATTN Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Metter of
)
Docket No. 50-260 s
tennessee Valley Authe-ity
)
LROWiiS FERRY NUCLEAR PLANT (BFN) - UNIT 2 - AMERICAN SOCMTY OF MECHANICAL g-ENGINEERS (ASME) - SECTION XI PROGRAMS FOR THE SECOND INSPECTION INTERVAL
Reference:
Letter from TVA to NRC, "BFN Extension of Ten Year Inspection Interval", L44 880301 801 The purpose of this letter is to provide for your revir.v the Inservice Inspection (ISI) and system pressurc test programs for the BFN Unit 2 second inspection interval which begins May 24, 1992. The code of record for this interval wil.1 be the 1986 Edition of the ASME Boiler and Pressure Vessel Code,Section XI.
The applicable regulation,10 CFR 50.5n(g), requires that inservice examinations and systea pressure tests of ASME code components of a water-cooled nuclear power facility mee.t the ISI requirements of ASME Section XI.
In addition, 10 CFR 50.55a(g)(4)(ii) requires the ISI and system pressure test programs be updated every 10 yeare to meet the i
requirements of the latest NRC approved Edition and Addenda of Section XI, which is in effect 12 months before start of the raxt 120-month inspection interval. The second inspection interval for BFN Units 1 and 3 will b'i n one year after their respective startup date as committed to i
in the Jr/*rence.
Enclost c 1 contains the updated BFN Unit 2 ISI program which conforms to the 1986 t;dition of the ASME Section XI code. This program contains Request for Relief ISI-2-1 which is being submittea for your approval. contains the updated system pressure test program which conforms to the 1986 Edition of the ASME Section.XI code.
DO6010235 920522 I
[DR ADOCK 05000260 l
.:t 2
U.S. Nuclear Regulatory Commission
'Mfi 2 2 $$7 contains BFNs Unit 1 and Unit 3-ISI program. This program does not reflect a subsequent 120-month inspection interval pursuant to
-l 10 CFR 50.55a(g). -This program does not include any additional or revised Requests for Relief. Enclosure 3 is submitted as requested by NRC letter from C. E. Murphy of Region II to H. G. Parris dated April 14, 1980.
If you have any questions, contact R. R. Baron, Manager of Site Licensing, at (205) 729-7566.
Sincerely,
[
k O/. Zering e Enclosure cc (Enclosure):--
NRC Resident-Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35611 Mr. Thierry M. Ross,1 Project Manager U.S. Nuclear Rt;eletory Commission One-White Flint, North 11555 Rockville Pike-Rockville, Maryland 20852 Mr. B. A. Wilson, Project Chief U.S'. Nuclear Regulatory Commission Region II 101 Marier.ta Street, NW, Suite 2900
. Atlanta, Georgia 30323 e
l l..
Ll:
O e
ENCLOSURE 1 BFN UNIT 2 ISl PROGRAM 1986 EDITION OF ASME-XI CODE l
.