Carolina Power & Light Ccmpany Nuclear Services Department 411 Fayetteville Street Mall - P.O. Box 1551 Raleigh, North Carolina 27602 -
i
.MAY 201992 4
SERIAL: NLS-92128 United States Nuclear Regulatory Commission ATTENTION: Document Control Oesk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 COCKET NOS. 50-325 & 50-324/ LICENSE NCS. DPR-7i & DPR-62 d
SUPPLEMENTAL REPLY TO NOTICE VIOLATION (EA 91-158)
Gentleraen:
On January 3,1992, the Nuclear Regulatory Commission issued a Notice of Violation as part of Enforcement Action (EA)91-158 for issues at the Brunswick Steem Electric Plant, Units 1 and 2.
By letter dated February 14,1992, Carolina Power & Light Company responded to the Nodce of Violation.
l As addressed in the response to Example A of Violation I, the Brunswick Nuclear Project indicated l
that revisico of Operatir.g Procedur63 and Periodic Tests to romove ambiguities associated with repeated steps (for redundant system loops) within these plant procedures would be accomplished by April 1,1992. Thirty-nine (39) procedures were identified as requiring revision to address this concern. During the revision process, two (2) of the thirty ntne procedures were re-evaluated and determined to be adequate; therefore, these two procedures were not resised. Revision of the last of the thirty-seven affected procedures was completed April 28,1992.
)
Pleau refer any questions regarding this information to Mr. S. D. Floyd at (919) 457-2404.
Yours very truly,
/
[.
D. C. McCarthy i
Manavr Nuclear Ucensing Section.
WPM /wrm (\\wp\\aa911586.wpf) cc:
Mr. S. D. Ebneter Mr. N. B. Le Mr. R. L. Prevatte i
j t'OCG1 9206010162 91.0520 I