i1ECElVED
\\
I!RC Arizona Public Service Company
!S SEP l 7.- ?H 2: 42 EEC10N Vit"c September.12; 1984 ANPP-30492-TDS/TRB qU. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:l Mr. T.' W. Bishop, Director Division of Resident Reactor Projects and Erp,ineering Programs
Subject:
Time Extension For Repcrt - DER 83-51 A 50.55(e) Potentially Reportable Deficiency Relating To Unit 1 Auxiliary Feedwater Pump Failed To Meet Requirements Of Hot Functional Test.
File: 84-019-026; D.4.33.2
Reference:
(A) Telephone conversation between P. Narbut and R. Tucker on August 2, 1984 (B) ANPP-27602, ' dated August 27,1983 (Interim Report)
(C) ANPP-29830, dated June 26,1984 (Time Extension)
(D) ANPP-30189, dated August 13,1984 (Time Extension)
Dear Sir:
L The NRC was notified of a potentially reportable deficiency in l
Reference ( A), an Interim Report was transmitted by Ref erence (B),
l' and Time Extensions were requested by References (C) and (D). At that time, it was estimated that a Final Report would be available.by September 15, 1984.
l A Final Report has been submitted to APS f or review.
It is expected a Final Report will be transmitted to the NRC by October 15, 1984.
l There is no new information or change to the Interim Report at this time.
~
Very truly yours, H % %skg_
8409200199 8 M hg E. E. Van Brunt, Jr.
PDR ADOCK O PDR APS Vice President S
Nuclear Production ANPP Project Director r-EEVB/TRB/nj cc: See Page Two t
i s O ZE-27
i.:.Q Mr. T. W. Bishop DER 83-51 Page Two cc:
Richard DeYoung, Director Office of. Inspection and Enforcement U. S. Nuclear Regulatory Connaission Washington, D. C. 20555 T. ' O. Woods, Jr.
D. B. Karner -
W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand D. Canady A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H.' D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zinsnerman S. R. Frost L. Clyde M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339
<