ML20098E047
| ML20098E047 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 05/29/1992 |
| From: | Feigenbaum T PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20098E049 | List: |
| References | |
| NYN-92069, NUDOCS 9206010209 | |
| Download: ML20098E047 (12) | |
Text
-
h- _ M "I 3;
_y+
k New;Hompshire?
Yh Ted C. Feigenbaum President and Chief Executive Officer e,
~
i NYN. 92069 4
hiay 29,1992 h
United States Nuclear Regulatory Commission
- Washingt on, DC 20555 -
l 4
-Do. cument Control Desk Attention:
a 6{4
- Referencesi f(a)
Facility Operating License No. NPF-86; Docket No. 50-443 6
New Hampshire Office cf Emergency Me tagement Letter, dated
$s
-(b)-
fy g May 18,1992, G. LJIverson to R. H. Strome, FEMA, Region i
Subject:
--Transmittal: of Revisions to_ 'the New llampshire Radiological Emergency Respon<e Plan (NHRERP) and Supporting Documents
. Gentlemen:
By tiettet dated May,18,.1992 [ Reference (b)), the New llampshire Office of Emergency Management - transmitted Revision 5.A of the New Hampshire Radiological Emergency Response Plan (NHRERP) to the Federal Emergency Management Agency. This letter transmits : Revision 5.A of the NHRERP,- Enclosure 1, to the NRC p_ursuant to the requirements 'of.'10CFR50A(b)(5)..
The changes contained -in.this revision, which are denoted by vertical change bars
, located in the left1 hand margin, were generated by the folle ving:
Relocation'of the state transportation staging area from the Rockingham County
-1 Complex to. the Peasc: International -.Tradeport; 4
/ Revision of the East Kingston Radiological Emergency Response Plan based on community input;
.1 Training,1 drill, and-annual plan review comments; fTo assist in your -
cw, Enclosure 2 provides a mati. which identifies the changes
- -and the. ' applicable plar. 4.- wdure se'ctions in which they appear. Only those changes that
=are Tsubstantive in; nature appear on' these matrices.
Minor-editorial changes are not
- identified.
i s
010.0.05 heh c
9206010209 9205294 i
i d\\
~PDR -ADOCK 0500044J-i F
\\
L Nw Hampshire Yonkee Division of Public Service Company of New Hampshire P.O. Box 300
- Seabrook, NH 03874
- Telephone (603) 474-9521 w
,~
, +.
w
. 4 -w
,~
~l n.
,-E'-
.. - -.. -. -. -. ~. - -. -. -. - - - -.. _.. - -. - - _.. - - - - -
x 8:
United States Nuclear Regulatory Commission _
May 29, 1992 Attentio?:
. Document Control Desk Page two if you should have any questions regarding the above, please contact Mr. James M.
Peschel, Regulatory Cumpliance Manager, at (603) 474-9521, extension 3772.
Very truly yours,
/
/
~
[fh M#L---
Ted C. Feige aum Enclosures cc;
- (w/o enclosures):
Mr. Thomas T. Martin Regional Administrator U.S. Nut lear Regulatory Commission Region 1 l
475 Allendale Road King of Prussia, PA ' 19406
-.Mr.- Gordon Edison, Sr. Project Mgr.
Project Directorate 1-3 l
Division of Reactor Projects U.S. Nuclear Regulatory _ Commission i
- Washington, DC 20555
. (with ' enclosures):
Mr, Ebc C; McCabe, Chief (2 copies) i, Emergency Preparedness Section -
LU.S. Nuclear Regulatory Commi sion Region I 475 Allendale Road King of Pruss" N 19406
- Mr. Noel Dudley NRC' Resident inspector P 0, Box 1149 NH - 03874
- Scabrook, Controlled Distribution Lists 9
..ier
., -,., +,
...m
-,._.~,m...,
.,_.~,,
y,,,,
,%,,,,,,.,y,,-s,,w y
,.ms
,..,,,-,,,,,.,ym
,,..%,p_,,.__.m.,_mm
,yy.
i.
' New Hampshire Yankee May 29,1992 I
)
-i I
d i
ENCLOSURE 1 TO NYN-92069 t
t I'
f~
i I'
L i
I :.
!s 4f rlf
{ -
I[;
[:!
6 il!{!(i!>
- [i
- !!
i; hi e
i A.
e5 gV a E T
P R N
P_
E A
M M
M D
t t
t t
t A
O n
n n
n n
o C
e e'
e e
e m
m m
m m
w w
R_
O m
m m
m m
ie ie H
F N
v v
IP o
o o
o o
e e
P E
c c'
c c
c r
r H
C l
ll l
l l
n n
N, l
l l
l R
i ir i
i i
a a
K r
r r
r l
U D
D D
D D
P Pl Ro O
W S
P E
N t
P:
A r
L h
E o
e P
S O
f t
d F S
H t
o nI g
E is H
P t
a nm S'
l e
P D
e e
l r
io g
n sh N'
r la u
Dpe it ido Ss r
u o
ot af O
u t
d c
d eh P
e e
t a
at n
S c
C c
hw ic r
t r
r lo e
no g
E o
D o
- t oi t
n f
t R
)
p C
p cl i it eu it a P
ot Y
A N
R e f a o
r o ar r
t e O
ir e
e v
n s n r p C
M I
h e
h dri l
e e o o t
h ot D
T t
N t
of c a.
r G
A C
ot t
it ice u
p E
o s
o t
a d
sr r
d no t
r e
u e
E A.
R
' A n
eae lce o
Te t
e R
O s
e s
s af d
c u
e uwo u
r r
r E
e e
s m
c d
Oo p
e u c
c c
r f
(
M5 V
n ne n
e oef e
r tbf b
E Y
I r
N R T
e ei e
c a
FI p e
ad r
t r
r u r
ot n s t
o C
e eq e
L O A h
t e r o o eA t
AI E
f f
f Sc t
pnie e
e e e
h s
o CS M R
tT dl dr r
t I I r
r r
dr a s.
H e e G V M R
e d
dl d
e o ep.
mr d
in R S C
d dh d
viop d
r is e
E U
O e
ec e
iar o
eR t
s fin as O
i t
s dO la a v ea L
d de d
eif h
er e Riirnne AI Cc RAP O
E A
Av A
F I
G D
A N
R AH e
e Cp sl.
e c
c E
C n
n c
u ail e
ndy I
r R
n P
f wd tu o et I
e e
Dw f
e n
a r
r lo t
f e o
iv H
r e
o u e
t er.
f S
n el s
f h r
a o
f n
ee at n
t os e o8, ho mC.
f P
e o8 ef hr o-e t
r t
r it ed' o
r tf M
it r
n t
s sg e
s e
e t
e t
t en n
hs e p ams f
c ds e c
sn A
o o
mbo ni st nam l im nam r
mi s
aa ti nwhe ca ir n
u H
u ul u
et o p
mu o
aq a
r del ol e delo rbr ms d d io e e a gP l
r E'
v o h ai iv id o
ad a
n Tei o W
f o
e tf r
U idiV..
r n
t scu diV t
n o r
t o
e c s r
E q
iRg Oi ie gO o eAc r ein6 eCe e c o
kt S
e c einG N
nr n i
t x
t S
uDr ut al in Fi uiFt ag o r
r f
t ut n
rI a e
do ot I
t u
I doa dCe d oa n t
r c
nll mdo t
o ePr io l
ePr io mr a Sn t ei Si ri ri p
eRc et eihif ar t v g nm c
et c i c
et t c cioni H
mcnt e a t c oeh oei ot o c Po o oo a
ht oo r
t t
oei rhr e rhe rhr e i f PtCS Pt v PtCS PInnCa Dn Cpmtol r
r r
i c TSfC re e
c e
c ic c
c c,
r e
u cgu c.
i es e
e e
e d
end ey ru f
t S
S SOe Si S
S 'r d S'
f
,C r e 5nc 5,
O e
6 I o 6io 7 kr o e
,F c
,o c s
D e
'6 6
.e t
EN o
Sr S
Sr nr r
er r
vP eCrd eHo eHod eH eoP e cu e
cu r u P
T O e
r od CI mo moou e mPt mPt e mPA mMm mRe ET c
a u
c uDic luDT u. a
,o~
luDe lo,i o
,H lo0e lo4r lues c u G p.
FC t o o
l r
o e
o
,e o
FE r
,i r
n AS V1R V8RP V1D V2iP V5R V1 T V1P l
j
- t
NEW HAMPSHIRE RADIOLOGICAL EMERGENCY RESPONSE PLAN REVISION 5.A CHANGE
SUMMARY
(ROAOMAP)
AFFECTED ISSUE CORRECTIVE ACTION SOURCE OF COMMENT SECTION Volume 8, List Form 300K showed wrong Corrected the Rev. number.
Plan review l
of Forms Rev. number.
i Voluma 9, Sec.
Sample news releases Corrected descriptions.
Drill comment -
B2.4 '
contained inconsistent descripti'ons for Site Area Emergency.
I*
Volume 22, East East Kingston RERP was.
Revised the East Kingston RERP and Plan review Kingston RERP not consistent with the procedures to make consistent with the NHRERP.
NHRERP.
i Volume 23, List of Effective Pages Corrected the Rev numbers.
Plan review Exeter RERP showed wrong Rev.
numbers for certain pages.
3 Volume 29.
RERP was not clear who Corrected the organization chart to Drill comment New Castle directs the emergency conform with EMD procedures to show RERP response organization when that EMD directs the organization in the Selectmen are not absence of the Selectmen. Corrected availabfe..RADEF RADEF procedures.
procedures incorrectly
.t referenced Form 300A.
Volume 34, Rye Police Chief procedure Corrected reference to Table 3.71.
Drill comment RERP incorrectly referenced Table 3.91.
Volume 35.
List of Effective Pages Removed page reference from the LOEP Plan review i
j' Seabrook RERP incorrectly referenced a
[-
deleted page, t
i l
r i
I Page 2
)
EP:[EPWoftK NHPPINH_RoACMAP REVS.A l.
g 4-New llampshire Yankee May 29,1992 I
7 ENCL.OSURE 2 TO NYN 92064 t
9 l
I
i STATE OF NEW HAMPSHIRE EXECUTIVE DEPARTMENT omo.., mm.,,.my u.,w sui. ome. r.ni swin f
r fa 1o7 me. m st, t i
conwn.new namosswo on01
\\
l 60W2712231 1 600-451 3791 JUOO GREGG FAX 403 225 7341 GEORGE L. IVCRSON Ge May 18, 1992 Wee Mr. Richard H.
Strome, Regional Director Federal Emergency Management Agency 442 J.W. McCormack POCH Boston, Massachusetts 02109 RE:
New Hampshire Radiological Emergency Response Plan Rev. 5.A
Dear Mr. Strome:
The New Hampshire office of Emergency Management has completed an update of the New Hampshire Radiological Emergency Recconse Plan.
This update includes the following:
- Revision of NHRERP, Vclume 7, Section 14, State Transportation Staging Area procedures to account for relocation of the State Transportation Staging Area from the Rockingham County Complex to the Pease International Tradoport.
- Revision of NHRERP, Volume 22, East Kingston Radiological Emergency Response Plan.
- Miscellaneous changes to other sections of the NHRERP resulting from recent training, drill and annual plan review comments.
Because the changes incorporated into this update are relatively limited in scope, the NHRERP, Rev.
5.A, update is transmitted in the form of change pages.
The change pages are accompanied by " Change Instructions" which identify the pages to be removed from the NHRERP and the Rev. 5.A replacement pages to be inserted.
The changes made in the NHRIRP, Rev.
5.A, update are denoted by vertical revision bars in the left-hand margin.
To facilitate your review, a roadmap of the NHRERP, Rev. 5.A changes is providtd.
If you have questions or require further information, please do not hesitate to contact me.
Sincerely, N
4^ AAA X\\ _--
'u ot George L.
Iverson Director GLI/sjp
(
Enclosures 010 D D Accoes; Reicy ?*p 1-gno-in p ra
- n_ :.::
i NEW HAMPSHIRE RADIOLOGICAL EMERGENCY RESPONSE Pl>_N Page 1 REVISION 5.A CHANGE SU)efARY (ROAIPfAP)
[E ISSUE CORRECTIVE ACTION SOURCE OF COMMENT i
Volume 5, Procedure did not reference the Added references to the Drill comment Sec.
1, Protective Action Criteria in procedure.
Governor's Volume 8. Section 6.
Rep. Proc.
Volume 5 Procedure should reference the Added reference to the Rockingham Drill comment Sec. 8 EOC RCDC call list for vehicle County Call List for vehicle Resource Off.
requirements.
requirements.
procedure Volume 6, Procedure did reference the Added references to the Drill comment Sec.
1, DPHS Protective Action Criteria in procedure.
Director Volume 8 Section 6.
Volume 6 Procedure directs the DPHS Revised procedure to direct the Drill comment Sec.
2, DPHS Initiator to obtain follow-up DPHS Initiator not to wait for Initiator information from the Control Room follow-up information before procedure before activating reaponse staff.
activating the DPHS response staff.
Volume 6, DPHS IFO admin staff was not Added the IFO clerical Drill comment Sec.
5, DPHS notified during the drill.
notification to the IFO RHTA IFO RHTA procedure.
procedure Volume 6, Communications procedures for the Clarified the procedures re:
Plan review Sec. 10, monitoring teams enroute to the radios and channels to be used Monitoring IFO required clarification.
enroute to the IFO.
Team procedure Volume 7,
The State Transportation Staging Revised State Transportation Plan review Sec. 14 Area was moved from Rockingham Staging Area y ocedures for Rock. Cty.
County Complex to Pease.
operations frc Dease.
procedures ROAIMAP uhrp_REV3. A
w
~.
Page 2 NEW U AMPSHIRE RADIOLOGICAL DERGENCY RESPONSE PLAN REVISION 5.A CIfANGE
SUMMARY
(ROADHAP)
I SOURCE OF COMMENT CORRECTIVE ACTION AFFECTED ISSUE SECTION I
Corrected Rev. number Plan review volume 8 Form 300K showed wrong Rev.
List of Forms number.
Drill comment l
Corrected descriptions l
Volume 9 Sample news' releases contained inconsistent descriptions f or Sec B2.4, Site Area Emergency.
Revised the East Kingston RERP Plan review Volume 22 East Kingston RERP was not and procedures to make consistent East Kingston consistent with the NHRERP.
with the filiRERP R ERP Volume 23 List of Effective Pages showed Corrected the Rev. i. ambers Plan review Exeter RERP wrong Rev. numbers for certain pages.
Drill comment Corrected the organization chart Volume 29 RERP was not clear who directs to conform with EMD procedures to New Castle the emergency response show that EMD directs the organization when Selectztent are not available. RADEF procedures organization in the absense of RERP the Selectmen. Corrected RADEF.
incorrectly referenced Form 300A.
Corrected reference to Table 3.7-Drill connent Volume 34, Police Chief proc:edure Rye RERP incorrectly reference Tab:e 3.9-1 1.
Removed page reference from the Plan review Volume 35 List of Effective Pages LOEP.
incorrectly referenced a deleted Seabrook RERP page.
POADMAP...nhpp,PrV). A 4
n<
ra-9 5
g f
A T i tJ Su n-
+ J 4:
<c 1
N E P i:.E S1 ] T J ' H A rJ C, F '_ i r_ F ZiJ i s
,. t.
E ~ c r.
. i:
i' f DOCUMENi:
t> c J E > r. d G I' >;R E A 1?~H D i-Ni.: ~ t h, Ti
~ L /-
it COMFLET1%
. N !? '
1,*i_ H v '
- i:
-i 0e/04 r D, _ 'lHtf W!LL JD1 L
i.
iP iL
' T-00;UPCNT; J4 N D R:1C ~
'E'
' Li E' ' i
- Fr 11 i
stE5s D I ^ _. c f il J T r.
- U _ 2' E
- c. t. J Ih bel N1Il E [i( b !)k.. [-
'., O ! 1L' r
hE i
- f.
5-I
~.
,3 i
- Q -1 I
(
f
,. {, t 4
. j' N l-; r.1 *- * -,
j
.; y
'}
m.
I-I i
j
').
J I.
h..' w
+
f~'
4 3
.c
.I 4 i'__
l
._ ~ -
h
- ;^ ' ~
,s f_
e i
G W
NOT ilF. QUIRED
,c ;,; n -
7
-r Ih-t [' f i
1_VEP
+-
t 9..-
=
a