Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20099F672 + (11:34:29, 13 December 2024)
- RBG-19341, Interim Deficiency Rept DR-221 Re Fire Deck Wall Thickness of Cylinder Heads in Tdi Standby Diesel Generators.Next Rept Will Be Provided by 841220 + (11:34:30, 13 December 2024)
- 05000333/LER-1984-022, :on 841028,full Scram Trip Occurred During APRM Surveillance Testing.Caused by Operator Error Due to Communication Breakdown.Personnel Counseled + (11:34:31, 13 December 2024)
- ST-HL-AE-1145, Final Deficiency Rept Re Defective Rosemount Pressure Transmitters.Initially Reported on 841003.Affected Transmitters Returned to Rosemount for Repair.Item Not Reportable Per 10CFR50.55(e) + (11:34:32, 13 December 2024)
- ML20099F638 + (11:34:33, 13 December 2024)
- ML20099F630 + (11:34:34, 13 December 2024)
- ML20099F623 + (11:34:37, 13 December 2024)
- ML20099F614 + (11:34:38, 13 December 2024)
- 05000301/LER-1984-006, :on 841023,inadvertent Actuation of Emergency Diesel Generator G02 Occurred.Caused by Accidental Closing of Contact on Loss of Voltage Relay 2-271X1/2A05 While Removing Insulating Matl + (11:34:40, 13 December 2024)
- 05000369/LER-1985-005-01, :on 850201,determined Plant Outside Design Analyses Assumptions,Based on Westinghouse Response Re Negative Flux Rate Trip Setpoint.Bistable Setpoint Reduced to 2.5% Rated Thermal Power + (11:34:42, 13 December 2024)
- ML20099F587 + (11:34:44, 13 December 2024)
- ML20099F586 + (11:34:44, 13 December 2024)
- ML20099F585 + (11:34:45, 13 December 2024)
- ML20099F550 + (11:34:46, 13 December 2024)
- ML20099F567 + (11:34:46, 13 December 2024)
- BVY-92-097, Monthly Operating Rept for Jul 1992 for Vermont Yankee Nuclear Power Station + (11:34:47, 13 December 2024)
- ML20099F538 + (11:34:48, 13 December 2024)
- ML20099F542 + (11:34:48, 13 December 2024)
- ML20099F537 + (11:34:49, 13 December 2024)
- SNRC-1149, Comments on NUREG/CR-4050, Review of Shoreham Nuclear Power Station Pra. Initiator Frequencies Increased by Utilizing Bayesian two-stage Analyzer.Initiator Not Discriminated Due to Initial Power Level for ATWS Evaluation + (11:34:50, 13 December 2024)
- ML20099F531 + (11:34:51, 13 December 2024)
- ML20099F527 + (11:34:52, 13 December 2024)
- ML20099F526 + (11:34:53, 13 December 2024)
- ML20099F514 + (11:34:53, 13 December 2024)
- ML20099F511 + (11:34:54, 13 December 2024)
- ML20099F505 + (11:34:55, 13 December 2024)
- ML20099F501 + (11:34:56, 13 December 2024)
- ML20099F493 + (11:34:58, 13 December 2024)
- ML20099F491 + (11:34:59, 13 December 2024)
- RBG-19370, Final Deficiency Rept DR-164 Re Intermixing of Welding Rods. Weld Joints Adequate to Perform Intended Safety Function. Conditions Not Reportable Per 10CFR50.55(e) + (11:35:00, 13 December 2024)
- 05000483/LER-1984-054, :on 841019 & 21,power Range Nuclear Instrumentation Channels Caused Fluctuations in Steam Generator Water Levels.Caused by High Gain Input to Steam Generator Level Control Circuitry + (11:35:02, 13 December 2024)
- ML20099F480 + (11:35:03, 13 December 2024)
- ML20099F449 + (11:35:03, 13 December 2024)
- ML20099F442 + (11:35:04, 13 December 2024)
- SNRC-1109, Submits Rept on Util Representatives 841004-12 Trip to Saudi Arabia to Review Engine Operating Records for Rafha Electric Co Tdi Diesel Generators.Based on Limited Data,Tdi Engines Proved Highly Reliable + (11:35:05, 13 December 2024)
- ML20099F431 + (11:35:05, 13 December 2024)
- 0CAN118408, Remits Payment of Civil Penalty in Amount of $20,000 Imposed by NRC + (11:35:06, 13 December 2024)
- ML20099F428 + (11:35:06, 13 December 2024)
- ML20099F415 + (11:35:07, 13 December 2024)
- ML20099F409 + (11:35:08, 13 December 2024)
- W3P84-3252, Forwards Proprietary Rev 3 to STD-P-04-002 & Rev a to FI-013 & Nonproprietary Rev 0 to Procedure RW-1-210 Re Radwaste Solidification Process Control Program.Proprietary Procedures Withheld (Ref 10CFR2.790) + (11:35:09, 13 December 2024)
- ML20099F403 + (11:35:09, 13 December 2024)
- ML20099F398 + (11:35:10, 13 December 2024)
- ML20099F392 + (11:35:11, 13 December 2024)
- ML20099F388 + (11:35:11, 13 December 2024)
- ML20099F387 + (11:35:12, 13 December 2024)
- ML20099F386 + (11:35:13, 13 December 2024)
- W3P84-3263, Forwards marked-up FSAR Page 8.3-51 Reflecting Static Uninterruptible Power Supply Change on Frequency Regulation & C-E Documentation to Justify Rev + (11:35:13, 13 December 2024)
- ML20099F384 + (11:35:14, 13 December 2024)
- ML20099F380 + (11:35:15, 13 December 2024)
- ML20099F377 + (11:35:16, 13 December 2024)