Part 21 Rept Re Hexcel/Mci Pipe Restraints Found W/Average Dynamic Crush Strength Values Below Acceptable Values. Initially Reported on 841101.Replacement Program in Progress
ML20099F392
Person / Time
Site: Byron, Braidwood, LaSalle, 05000000
Issue date: 11/08/1984
From: Preston R
AFFILIATION NOT ASSIGNED, HEXCEL CORP.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
REF-PT21-84 NUDOCS 8411260400
Download: ML20099F392 (3)


Text

n--

IEi!NCEL "

m:i divi ~izn

!ECEIVED

+ ,

!n0 NOVEMBER 8, 198h LOV 13 a !) r4 q' Er'"'+'"' y ; :

MR. J. B. MARTIN, REGIONAL ADMINISTRATOR UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V SUITE 210 1450 MARIA LANE WALNUT CREEK, CA 94596 RE: 10CFR PART 21 NOTIFICATION DEAR SIR:

IN ACC'.nDANCE WITH REFERENCED REGULATIONS WE ARE PROVIDING THE FOLLOWING WRITTEN REPORT TO A MPLIFY THE VERBAL REPORT GIVEN TO YOUR OFFICE ON NOVEMBER 1, 1984.:

1) NAME AND ADDRESS OF INDIVIDUALS INFORMING THE COMMISSION:

MR. B. JENKINS MR. R. PRESTON MR. H. GRAPER HEXCEL/ MCI DIVISION 140 NORTH ORANGE AVENUE CITY OF INDUSTRY, CA 91744

2) IDENTIFICATION OF FACILITYCS) TO WHICH BASIC COMPONENTS HAVE BEEN SUPPLIED WHICH MAY FAIL TO COMPLY OR WHICH MAY CONTAIN A DEFECT:

AT THIS TIME, WE BELIEVE THAT THE FOLLOWING FACILITIES HAVE BEEN SUPPLIED WITH MATERIALS WHICH MAY FAIL TO COMPLY OR WHICH MAY CONTAIN A DEFECT:

BYRON PLANTS COMMONWEALTH EDISON COMPANY 4450 GERMAN LHURCH BYRON, ILL 61010 BRAIDWOOD PLANT COMMONWEALTH EDISON COMPANY E. SIDE OF RTE 53 BRAIDWOOD, IL 60408 LASALLE PLANT COMMONWEALTH EDISON COMPANY ROUTE 1 MARSEILLES, IL 61341 8411260400 841108 PDR S

ADOCK 05000373 PDR 140 N. Orange Avenue, City of Industry, California 91744, (818) 961-9971 f,L? - l}

yCl

r a 0

PAGE 3) THE IDENTIFICATION OF THE FIRM WHICH SUPPLIED THE BASIC COMPONENT-WHICH MAY FAIL TO COMPLY OR WHICH MAY CONTAIN A DEFECT:

HEXCEL/ MCI DIVISION 140 NORTH ORANGE AVENUE CITY OF INDUSTRY, CA 91744

4) NATURE OF THE DEFECT OR FAILURE TO COMPLY AND THE SAFETY HAZARD WHICH COULD BE CREATED BY SUCH DEFECT OR FAILURE TO COMPLY:

SOME SAMPLES RECENTLY TESTED FROM ENERGY ABSORBING PIPE REbYRAINTS FABRIC ATED BY HEXCEL/ MCI DURING THE PERIOD 1978-1979 AND WHICH WERE ORIGINALLY SUPPLIED TO COMMONWEALTH EDISON IN ILLINOIS HAVE BEEN FOUND TO HAVE AVERAGE DYNAMIC CRUSH STRENGTH (ADCS) VALUES BELOW THE ACCEPTABLE VALU15 SPECIFIED AT TIME OF MANUFACTURE. THE ACCEPTABLE RANGE FOR THIS TEST AS SPECIFIED BY COMMONWEALTH EDISON WAS 5400-7000 PSI.

THE AVERAGE VALUES FOR SAMPLES WHICH WERE SUPPLIED TO HEXCEL/ MCI INDICA E THAT THEY ARE WITHIN.THE SPECIFICATION RANGE, HOWEVER A FEW SAMPLES WERE BELOW THE LOWER LIMIT.

THE SAFETY HAZARD WHICH MAY BE CREATED BY THE FAILURE OF SOME OF THOSE RESTRAINTS TO MEET THE ADCS VALUES IS UNCERTAIN AT THIS TIME. THE SAFETY HAZARD, IF ANY, WOULD DEPEND ON THE LOCATION, NUMBER OF RESTRAINTS AND THE ACTUAL ADCS VALUES FOR THOSE RESTRAINTS IN POSITION WHEN EVALUATED IN RELATION TO THE ANTICIPATED DESIGN REQUIREMENTS FOR SUCH RESTRAINTS CORRECTED FOR DESIGN SAFETY FACTOR.

5) THE DATE OF WHICH THE IMFORMATION OF A POSSIBLE DEFECT OR POSSIBLE FAILURE TO COMPLY WAS OBTAINED:

SAMPLES SUPPLIED WERE TESTED BEGINNING 10-29-84. SOME VALUES DELOW THE ORIGINAL SPECIFICATION LIMIT WERE OBSERVED AS THESE SAMPLES WERE BEING TESTED, HOWEVER, IT WAS NOT UNTIL 10-30-84 THAT PRELIMINARY TESTING WAS f COMPLETED, EVALUATED AND AN ASSESSMENT MADE AS TO THE APPARENT MEANINGFULNESS OF THESE TEST RESULTS. WE THEN VERBAltY REPORTED TO YOUR OFFICE ON 11-1-84 ADVISING YOU Ai THAT TIME THAT WE WOULD BE SUBMITTING A WRITTEN REPORT WITHIN 5 WORKING DAYS THEREAFTER IN ACLORDANCE WITH THE REGULATIONS.

l L

fh[

N 1-

7. .

PAGE 6) ~THE NUMBER AND LOCATION OF ALL SUCH COMPONENTS.

IN USE AT, SUPPLIED FOR, OR BEING SUPPLIED FOR

.ONE OR1MORE FACILITIES SUBJECT TO THE REGULA-

.TIONS'IN THIS PART:

.AT THE WRITING OF'THIS REPORT, WE BELIEVE THAT SUSPECT MATERIALS HAVE BEEN SUPPLIED TO THOSE LOCATIONS INDI-CATED UNDER 2, ABOVE. OUR INVESTIGATIONS ARE-CONTINUING AND SHOULD IT BE ESTABLISHED SUBSEQUENTLY THAT OTHER LOCATIONS MAY HAVE-RECEIVED SUSPECT' MATERIALS WE WILL SO ADVISE THE-COMMISSION.

7) THE CORRECTIVE / ACTION WHICH IS BEING AND WILL.

BE TAKEN; THE NAME OF THE ORGANIZATION RESPONSIBLE FOR THE ACTION AND THE LENGTH OF-TIME THAT WILL BE TAKEN TO CJHPLETE THE ACTION:

HEXCEL/ MCI DIVISION HAS AND WILL.BE COORDINATING THE CORRECTIVE ACTION WITH COMMONWEALTH EDISON. AT THIS PHASE IN THE INVESTIGATION, HEXCEL/ MCI DIVISION WILL TEST AND REPORT REdVLTS TO COMMONWEALTH EDISON.

HEXCEL/ MCI IS PURSUING A PROGRAM OF PROVIDING REPLACE-MENT MATERIALS AS REQUIRED.

SHOULD OUR ONGOING INVESTIGATION INDICATE THAT MATERIAL.

l OTHER THAN THAT TO BL USED FOR COMMONWEALTH EDISON l

INSTALLATIONS MAY BE INVOLVED WE WILL-SO ADVISE THE E

LICENSEES: INVOLVED WITH THE DESIGN, SPECIFICATIONS AND USE OF SUCH MATERIAL. THE CORRECTIVE ACTIONS WE PROPOSE l WILL BE THE SAME.

WE ANTICIPATE THAT WE WILL COMPLETE THE TESTING OF l SAMPLES SUPPLIED ON OR ABOUT THE END OF NOVEMBER. WE ANTICIPATE THAT OUR EVALUATION OF OUR RECORDS OF ALL SUCH MATERIALS MANUFACTURED WHICH HAVE BEEN SUPPLIED TO CUSTOMERS SUBJECT TO 10CFR REGULATIONS WILL BE COMPLETED BY THE END OF NOVEMBER.

VERY LY S, i sf

x R. S. PRESTON l DIRECTOR OF OPERATIONS RSP