Interim Deficiency Rept DER 84-63 Re SIT Valve Not Closing During Testing.Initially Reported on 840831.Investigation Continuing.Final Rept Delayed Until 841116
ML20099F567
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/06/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-31073-TDS, DER-84-63, NUDOCS 8411260495
Download: ML20099F567 (2)


Text

. m.,.. w

.;. >, w...

. y.

. y..e. _ : :. : ; - r
a

~y,

m
2. :n c.

. +,;

o.

6 -

nEcuvEO Arizona Public Service Company 5' NT! -9 L'i ll: ip 4

November 6,198ECM V,'t,r ANPP-31073-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Reactor Safety and Projects

Subject:

Time Extension For Report - DER 84-63 A 50.55(e) Potentially Reportable Deficiency Relating To SIT Vent Valve Did Not Close During Testing.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and T. Bradish on August 31, 1984 (B) ANPP-30681, dated September 27, 1984 (Interim Report)

(C) ANPP-30929, dated October 23, 1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by November 8, 1984.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by November 16, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim K'eport at this time.

Very truly yours, bdo

'3.%

C E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director s

EEVB/TRB/nj cc: See Page Two 8411260495 84110e PDR ADOCK 05000528

)

S PDR 22 27

y;w yw

3 u ~.W

--s t_

.s s s

e, t

t Mr. T. W.: Bishop t

DER 84-63

- Page Two, c

cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 T. G. Woods, Jr.

. D. B.. Karner W. E. Ide D. B. Fasnacht A. C. Rogers s

L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo B. S. Kaplan J.~Vorees J. R. Bynum J. M. Allen A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R. P.,Zimmeruan L. Clyde M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339 t