Text
--
q y
MEIVEy era Arizona Nuclear Power Project T3I Fra j g
'c, b [f PO BOX 52034 e PHOENIX, AFUZONA 85072-2034 i
November 12, 1984 rec,ra y~
ANPP-31115-TDS /TRB U. S. Nuclear Regulatory Commission Region V 1450 Maria 1.ane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Reactor Safety and Projects Subject Final Report - DER 84-63 A 50.54e) Reportable Condition Relating To SIT Vent Valve Did Not Close During Testing.
File 84-019-026; D.4.33.2 1,e fe rence : A) Telephone Conversation between P. Narbut and T. Bradish on August 31, 1984 B) ANPP-30681, dated September 27, 1984 (Interim Report)
C) ANPP-30929, dated October 23, 1984 (Time Extension)
D) ANPP-31073, dated November 6, 1984 (Time Extension)
Dear Sir:
Attached is our final written report of the deficiency referenced above, which hac been determined to be Hot Reportable under the requirements of 10CFR50.55(e).
Very truly yours, 22.\\b\\bd/mc E. E. Van Brunt, Jr.
APS Vice President Nucicar Production ANPP Project Director EEVD/TRB/nj Attaciunent cc:
See Page Two 8411260426 841112 PDR ADOCK 05000528 S
PDR 8l4 L
1E.L7
'v...,
~ - - '
i,..
g 4
4
-> ; ; ; y 3...
s r
4 9
r 3
+
+
.i Mr. T. W.I Bishop
~
DER 84 Page 'heo ec c Richard DeYoung, Director
~0ffice of-Inspection and Enforcement U. lSi Nuclear -Regulatory Commission
+
Washington,'D.-C. :20555 ;
il T. C. Woods' Jr..,
D. B. Karner,<
W.~E. Ide:
~ e.
' D. B. Fasnacht.-
LA. C. Rgers '
L'. A.'Souza=
D. E. Fowler-T. D. Shriver.
- d. N. Russo' B. S.-Kaplan J. R. Bynum-J. M. ' Allen A. C. Gehr W. J. Stubblefield W. C. Bingham.
R. L. Patterson-1 W. Welcher h
D. Foster D. R. Lukinson R. P. Zimmerman L. Clyde M. Woods T. J. Bloom D.
N.' Stover J. D. Houchen J. E. Kirby D. Canady Records Center.
Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite '1500 Atlanta, CA 30339 i
I t
_.-__.,__,.__,-__.m.,.
,.,,___.,,__,.m.,
l fl
',f
~
4,. p 4
?
FINAL REPORT - DER:84-63~
DEFICIENCY EVALUATION 50.55(e)
ARIZONA PUBLIC SERVICE COMPANY (APS)
PVNGS UNIT 1 F
I
,I.
Description of Deficiency The folletting deficiency was identified with Target" Rock Solenoid Valves JSIB-HV613; and reported in NCR SM-4623.
Valve JSIB-HV613 is located on 'a Safety Injection Tank '(SIT)" vent line. This valve is required for relieving pressure-during cooldown of the reactor. This is a failed close valve and did not close when -
required during testing. The valve was opened when SIT pressure was -
600 psig and would not close via the handswitch at '200 peig. The power was shut off to the valve and it still would not close.
Investigation of the valve condition mentioned above indicated that the valve was mechanically stuck and could not be made to operate.-
The evaluation; reportability assessment; and torrective action plan is defined in DER 84-58.
un.-
---ww,ve-u
,.--m,,,,.,
n r.
,,.. _ _.