Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20100P046 + (10:28:13, 13 December 2024)
- ML20100P038 + (10:28:14, 13 December 2024)
- ML20100P030 + (10:28:15, 13 December 2024)
- ML20100P016 + (10:28:16, 13 December 2024)
- ML20100P019 + (10:28:16, 13 December 2024)
- ML20100P015 + (10:28:17, 13 December 2024)
- ML20100N980 + (10:28:18, 13 December 2024)
- ML20100N976 + (10:28:21, 13 December 2024)
- ML20100N972 + (10:28:22, 13 December 2024)
- ML20100N968 + (10:28:23, 13 December 2024)
- ML20100N966 + (10:28:23, 13 December 2024)
- ML20100N959 + (10:28:24, 13 December 2024)
- LIC-96-0033, Forwards Rev 11 to Site Security Plan & Rev 1 to Safeguards Contingency Plan.Revs Withheld + (10:28:25, 13 December 2024)
- ML20100N957 + (10:28:25, 13 December 2024)
- ML20100N950 + (10:28:26, 13 December 2024)
- ML20100N948 + (10:28:27, 13 December 2024)
- ML20100N947 + (10:28:28, 13 December 2024)
- PY-CEI-NRR-2033, Submits Addl Info to Support 960116 LAR on Drywell Leak Rate Testing Requirements,Per 960228 Telcon W/Nrc.Proposed TS Page mark-ups in Present Format & Amend 69 Format (Improved TS) Encl + (10:28:29, 13 December 2024)
- ML20100N939 + (10:28:30, 13 December 2024)
- ML20100N938 + (10:28:31, 13 December 2024)
- ML20100N930 + (10:28:31, 13 December 2024)
- ML20100N928 + (10:28:32, 13 December 2024)
- ML20100N926 + (10:28:33, 13 December 2024)
- ML20100N906 + (10:28:34, 13 December 2024)
- ML20100N898 + (10:28:35, 13 December 2024)
- ML20100N892 + (10:28:36, 13 December 2024)
- ML20100N886 + (10:28:37, 13 December 2024)
- ML20100N889 + (10:28:37, 13 December 2024)
- ML20100N884 + (10:28:38, 13 December 2024)
- ML20100N882 + (10:28:39, 13 December 2024)
- ML20100N876 + (10:28:40, 13 December 2024)
- 05000416/LER-1984-051, :on 841102 & 03,two RCIC Isolations Occurred Due to High Flow on RCIC Steam Line.Caused by Water Collected in Elbow Top Loop Seals for Steam Flow Transmitter.Pressure Equalized + (10:28:41, 13 December 2024)
- ML20100N871 + (10:28:42, 13 December 2024)
- ML20100N865 + (10:28:43, 13 December 2024)
- ML20100N862 + (10:28:44, 13 December 2024)
- ML20100N858 + (10:28:45, 13 December 2024)
- ML20100N854 + (10:28:46, 13 December 2024)
- 05000331/LER-1984-040, :on 841104,auxiliary Transformer Failed,Causing Main Generator & Auxiliary Transformer Breakers to Nonessential Buses to Open.Caused by Short Circuit Between Turns in High Voltage Winding of Phase Coil + (10:28:47, 13 December 2024)
- ML20100N849 + (10:28:48, 13 December 2024)
- ML20100N845 + (10:28:49, 13 December 2024)
- 05000454/LER-1984-001-08, :on 841104,hourly Fire Watch Patrol Not Executed in Areas W/Degraded Fire Barriers.Addl Instruction Re Staffing for Fire Watches Provided to Security Supervisors + (10:28:50, 13 December 2024)
- ML20100N832 + (10:28:51, 13 December 2024)
- ML20100N829 + (10:28:52, 13 December 2024)
- ML20100N827 + (10:28:53, 13 December 2024)
- 05000247/LER-1984-021, :on 841002,during Surveillance Test of Svc Water Pumps,Back Leakage Across Check Valves on Discharge Side of Two Pumps Observed.Affected Check Valves Repaired & Tested Satisfactorily + (10:28:54, 13 December 2024)
- ML20100N810 + (10:28:56, 13 December 2024)
- ML20100N815 + (10:28:56, 13 December 2024)
- ML20100N808 + (10:28:57, 13 December 2024)
- ML20100N793 + (10:28:58, 13 December 2024)
- ML20100N790 + (10:28:59, 13 December 2024)
- ML20100N767 + (10:28:59, 13 December 2024)
- BSEP-84-2460, Forwards Monthly Operating Repts for Oct 1984.Gross Thermal Energy Generator Incorrect Due to Apparent Software Problem. Corrected Rept Will Be Forwarded Upon Resolution.Error Does Not Affect Other Rept Parameters + (10:29:00, 13 December 2024)