Interim Deficiency Rept DER 84-81 Re HPSI Valve Hesitation. Initially Reported on 841009.Due to Extensive Investigation & Evaluation Required,Next Rept Delayed Until 841212
ML20100P046
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 11/29/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-31257-TDS, DER-84-81, NUDOCS 8412130606
Download: ML20100P046 (2)


Text

'o p

[

Arizona Nuclear Power Project P.O. box 52034

  • PHOENIX, ARIZONA 85072-2034 Flf 12: 3 i November 29, 1984306ICIIV t3 ANPP-31257-TDS/TRB U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects

Subject:

Time Extension for Report - DER 84-81 A 50.55(e) Potentially Reportable Deficiency Relating To Unit 2 HPSI Valve Hesitation.

File: 84-019-026; D.4.33.2 Reference A) Telephone Conversation between D. Hollenbach and T. Bradish on October 9, 1984 B) ANPP-31071, dated November 6, 1984 (Interim Report)

Dear Sirt The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was eatimated that a Final Report would be available by November 30, 1984.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by December 12, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, bh (

E. E. Van Brunt , Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj cet See Page Two 0412130606 841129 )

PDR ADOCK 05000529 S pyg

_rE-17

'w .** n ,

~

~

, Mr. D. F. Kirsch

, DER 84-81 Page Two cc: Richard DeYoung, Director Office of Inspection'and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C..;20555 T. G. Woods, Jr.

D. B. Karner ,

W. E. Ide D. B. Fasnacht

-A. C. Rogers L. A. Souza D. E. Fowler-T. D. Shriver C. N. Russo B. S. Kaplan J. R. Bynua s J. M. Allen A. C. Gehr W. J.-Stubblefield .

W. G. Bingham R. L. Patternon R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman L. Clyde M. Matt T. J. Bloom Records Center Insti'ute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlants, GA 30339 i

i

t ..

+

i