OPERATING DATA REPORT DOCKET NO.
50-296T
- h..
DATE 11-5-84 f
C051PLETED BY
.T. K. Salisbury-TELEPHONE A02-82s-3811 OPERATING STATUS
- 1. Unit Name:
Cooper Nuclear Station Notes
- 2. Reporting Period:
October. 1984 k
- 3. Licensed Thermal Power (51Wt):
2381 836
/.
- 4. Nameplate Rating (Gross htWe):
778 I'
- 5. Design Electrical Rating (Net SIWE):
- 6. Sinimum Dependable Capacity (Gross 31We):
787
- 7. hinimum Dependable Capacity (Net SIWE):
764
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Level To Which Restricted,if Any (Net alWe):
}-
10.' Reasons For Restrictions,if Any:
P This 51onth Yr. to Date Cumulatise
- 11. Hours in Reporting Period 745.0 7.320.0 90.625.0
- 12. Number Of Hours Reactor Was Critical 0.0 5.952.6 72.955.6
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On.Line 0.0 5.902.1 71.820.6
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
}
- 16. Gross Thennal Energy Generated (5tWH) 0.0 10,926,853.0 141,440,011.0 17.' Gross Electrical Energy Generated (htWH) 0.
1;618;141 0 45;024 496 0
- 18. Net Electrical Energy Generated (5tWH) 0.0 3.469.953.0 43.386.612.0
- 19. Unit Service Factor 0.0 30.S 79.3
- 20. Unit Availability Factor 0.0 80.6 79.3
- 21. Unit Capacity Factor (Using AfDC Net) 0.0 62.0 62.7
- 22. Unit Capacity Factor (Using DER Net) 0.0 60.9 61.5
- 23. Unit Forced Outage Rate 0.0 2.2 3.7
' 24. Shutdowns Scheduled Over Next 6 Sfonths IType. Date.and Duration of Eacht:
1984 Refueling and Maintenance starting September 10, 1984, with an approximate 7 mnneh Anrnrinn
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
May 1, 1985
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICALITY INITIA L ELECTRICITY CO.\\l\\1ERCIAL OPER ATION
/
8412130470 1 31..
~
PDR ADOCK O (W771
\\
\\
R PDR
m
,a
- =
y; AVERAGE DAILY UNIT POWER k.EVEL s
e
- s., '
f'
~
DOCKET NO.
50-298' UNIT CNS
.DATE 11-5-84
_CO.\\1PLETED BY J.K. Salisbury.
TELEPif 0NE. 4n9-825-1811
.\\f0NT11 Octnber. 1984
.f.
DAY-AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL O!We Neti (31We-Net) 9.
2 n
gg n
t 3
"U-~
19 0
'4 0
20 0
5' O
21 0
6 0
0 22 0
,,,,_,p_,_
7
,,_,,,2,_
S O
24 0'
0 9
25 0
0 0
10 26 13 0
27 0
12 0
o 33 0
0 13 29 14 0
30 0
15 0
yg o
16 0
INS'IT!UCTIONS
' On this format list the verage daily urut power levelin NtWe Net for es h day in the reporting month. Compute to the nearest whole megswatt.
5 9
6---
- ]
' ~
DOCKET NO.
50-298-UNITSHU1 DOWNS AND POWER REDUCTIONS UNIT NAME - CNS DATE 11-5-84 1
COMPLETED BY - J.K: Salisburv REPORT MONTif October-1984 TELEPHONE 402-8?s-lai1 w.
E E
E5 Licensee
.,E*
j3
!g 3 j5 t
Cause & Corrective No.
Date E
Actioni to
~ 5j 5*
2 Event g?
gO Prevent Recurrence F
$=
5
~5g Report a mU o
v e
Q (Ncne during thi s repor :ing period)
J i
t h
i I
2 1
3 4
F: Forced Reased:
Method:
Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for, Preparation of Data
. B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee 3-Automatie Scram.
Event ReporI(LER) File (NUREG.
C. Refueling 4 Other (Explain) 0161)
D-Reg 6Iatory Restriction E. Operator Training & License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I-Same Source t'7/77)
Il-Other(Explain)
t Operations Narrative Cooper Nuclear Station October, 1984-The plant remained shutdown in the month of October for the 1984 Rufueling and Maintenance Outage.
4
~
.o a y, -
COOPER NUCLEAR STATION Nebraska Public Power District
'" " * ;'A"t,, o='lM; L".",^,5"^ "
a*
CNSS840429 November 6, 1984 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Monthly Operation Status Report for October 1984 Docket No. 50-298 Gentlemen:
Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for October 1984. The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown Data, and a Narrative Summary of Operating Experience.
Should you have any comments or require additional information regarding this report, please contact me.
Sincerely, h(
um**w P. V. Thomason Division Manager of Nuclear Operations PVT:1b Enclosure cc:
G. D. Watson w/ene.
A. C. Gehr w/ enc.
R. D. Martin w/ enc.
bc:
D. E. Schaufelberger w/ enc.
L. G. Kunc1 w/ enc.
R. E. Wilbur w/ enc.
L. R. Berry w/ enc.
E. N. Sloth w/ enc.
D. E. Foland w/ enc.
J. R. Bull w/ enc.
J. J. Brix w/ enc.
T. J. Oakes w/ enc.
M. L. Rief w/ene.
J. L. Citta Jr. w/ enc.
/ g P. L. Ballinger w/ enc.
jLF 1 INPO Records Center w/ enc.
/,
3 R. W. Beck and Associates w/ene.
ANI Library w/ enc.
.