Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101J506 + (09:43:26, 13 December 2024)
- ML20101J505 + (09:43:27, 13 December 2024)
- ML20101J502 + (09:43:27, 13 December 2024)
- HL-5127, Ei Hatch Nuclear Plant Annual Environ Surveillance Rept for 1995 + (09:43:29, 13 December 2024)
- ML20101J456 + (09:43:30, 13 December 2024)
- W3P84-3547, Forwards Executed Amend 2 to Indemnity Agreement B-92 + (09:43:30, 13 December 2024)
- 3F0396-21, Special Rept 96-01:on 960218,RM-A1 Taken Out of Svc Due to Failure of Detector to Respond to Check Source.Replacement Detector from Stores & Bench Calibrate.Expects to Return RM-A1 to Svc Prior to Restart from Refueling Outage + (09:43:31, 13 December 2024)
- ML20101J447 + (09:43:32, 13 December 2024)
- ML20101J442 + (09:43:33, 13 December 2024)
- ML20101J436 + (09:43:33, 13 December 2024)
- ML20101J432 + (09:43:34, 13 December 2024)
- ML20101J425 + (09:43:35, 13 December 2024)
- 05000373/LER-1984-083, :on 841124,pipe Chase Opening Found Located Above Drywell Personnel Access Hatch 740 Elevation of Reactor Bldg.Caused by Error During Const.Work Request 43798 Initiated to Fabricate Cover + (09:43:37, 13 December 2024)
- ML20101J421 + (09:43:38, 13 December 2024)
- ML20101J416 + (09:43:39, 13 December 2024)
- B11390, Forwards Comments on Jr Benjamin & Assoc Review of Revised Millstone Unit 3 Probabilistic Safety Study Seismic Fragility. Seismic Hazard Analysis Contained in Probabilistic Safety Study Reevaluated.Info Not Current + (09:43:40, 13 December 2024)
- ML20101J415 + (09:43:40, 13 December 2024)
- ML20101J387 + (09:43:41, 13 December 2024)
- ST-HL-AE-5324, Forwards Response to Emergency Preparedness Program Weakness Identified During NRC Insp Repts 50-498/96-13 & 50-499/96-13.Corrective Actions:Condition Rept 96-2626 Written to Address Weakness Incurred During Insp + (09:43:42, 13 December 2024)
- ML20101J347 + (09:43:43, 13 December 2024)
- ML20101J341 + (09:43:44, 13 December 2024)
- ML20101J339 + (09:43:45, 13 December 2024)
- ML20101J335 + (09:43:53, 13 December 2024)
- ML20101J291 + (09:43:54, 13 December 2024)
- 05000271/LER-1996-005, :on 960227,Group 6 Isolation for HPCI Sys Inadvertently Degraded Without Taking Actions Included by Ts.Caused by Personnel Error.Plant Processes Involved W/ Design Change Preparation Reviewed + (09:44:01, 13 December 2024)
- ML20101J259 + (09:44:02, 13 December 2024)
- ML20101J247 + (09:44:03, 13 December 2024)
- ML20101J250 + (09:44:03, 13 December 2024)
- ML20101J241 + (09:44:04, 13 December 2024)
- ML20101J219 + (09:44:05, 13 December 2024)
- ML20101J231 + (09:44:05, 13 December 2024)
- ML20101J215 + (09:44:06, 13 December 2024)
- ML20101J198 + (09:44:07, 13 December 2024)
- ML20101J209 + (09:44:07, 13 December 2024)
- ML20101J193 + (09:44:08, 13 December 2024)
- ML20101J187 + (09:44:09, 13 December 2024)
- ML20101J175 + (09:44:10, 13 December 2024)
- ML20101J178 + (09:44:10, 13 December 2024)
- ML20101J173 + (09:44:11, 13 December 2024)
- ML20101J156 + (09:44:12, 13 December 2024)
- ML20101J163 + (09:44:12, 13 December 2024)
- ML20101J152 + (09:44:13, 13 December 2024)
- ML20101J144 + (09:44:14, 13 December 2024)
- ML20101J123 + (09:44:20, 13 December 2024)
- ML20101J109 + (09:44:25, 13 December 2024)
- 05000361/LER-1996-001-02, :on 960205,waste Gas Sys H Monitor Was Declared Inoperable.Caused by Blown Fuse.Replaced Blown Fused & Performed Channel Calibr + (09:44:33, 13 December 2024)
- ML20101J081 + (09:44:34, 13 December 2024)
- ML20101J076 + (09:44:35, 13 December 2024)
- ML20101J071 + (09:44:36, 13 December 2024)
- 05000354/LER-1995-042, :on 951212,fuel Bundle Was Confirmed to Be Misoriented During Operating Cycle.Caused by Less than Adequate Procedural & Human Factor Controls Being Established.Revised Procedures + (09:44:43, 13 December 2024)
- ML20101J066 + (09:44:44, 13 December 2024)