Forwards Addendum to ,Requesting Relief from ASME Section XI Requirements for Class 1 & 2 Insulated Pressure Retaining Bolted Connections Which Receive VT-2 Visual Exam During Performance of Sys Pressure Testing
ML20101J425
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/27/1996
From: Gabe Taylor
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NRR-950001, TAC-M94364, NUDOCS 9604010427
Download: ML20101J425 (5)


Text

{{#Wiki_filter:. South Carolina Eltetric & Gas Company Gary J.Teylor PO. Box 88 Vice President Jenkinsville, SC 29065 Nuclear Operations (803) 345-4344 SCE&G namacm March 27,1996 Document Centrol Desk l U. S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 ASME SECTION XI RELIEF REQUEST - ADDENDUM (NRR 950001) Ref: G. J. Taylor to Document Control Desk dated December 20,1995 (RC-95-0315) t i South Carolina Electric & Gas Company (SCE&G) hereby submits the foliowing addendum to our letter dated December 20,1995 (NRC TAC # M94364), requesting relief from the ASME Section XI requirements for Class 1 and 2 insulated pressure retaining bolted connections which receive VT-2 Visual Examination during the performance of System Pressure Testing. The enclosure contains additional components for which this relief is requested. This relief is modeled after Code Case N-533, expanded to include specified Class 2 connections inside containment. This relief is to exempt the applicable Class 1 and 2 pressure retaining bolted connections that are insulated,in systems borated for the purpose of reactivity control. Specifically, SCE&G requests to exempt the additional applicable connections from the requirements of ASME Section XI IWA 5242(a), which specifies that insulation must be removed from pressure retaining bolted connections for VT-2 visual examination during the performance of System Pressure Testing. As an alternate, SCE&G shall remove the insulation and conduct the VT-2 visual examination of pressure retaining bolted connections on applicable Class 1 connections once per refueling outage at static or atmospheric pressure. Applicable Class 2 connections will be similarly inspected once each inspection period during a refueling outage. Insulation will then be reinstalled and upon repressurization of a l bolted connection, a four-hour hold time will be utilized to assess potential leakage. SCE&G contends that the proposed alternate testing provides the equivalent, acceptable level of quality and safety as that provided by the Code. SCE&G desires relief from the above requirements so as not to create an undue hardship without a compensating increase in quality or safety. ) SCE&G requests that the NRC review and approve this addendum as soon as possible, in order to support inspection activities scheduled to begin in April,1996. 9604010427 960327 PDR ADOCK 05000395 g i p PDR i

~ Documtnt Control Desk NRR 950001 Pige 2 of 2 l l l i Should you have any questions on this issue, please call Mr. M.J. Zaccone at (803) 345-4328. Very truly yours, $ 6hQfnt-rur-a s r w,- s.ssne l Gary J. Taylor 1 MJZ/GJT/nkk Enclosure c: J. L. Skolds W. F. Conway ((w/o Enclosure) R. R. Mahan w/o Enclosure) R. J. White

5. D. Ebneter J. l. Zimmerman l

NRC Resident inspector J. B. Knotts Jr. NSRC DMS (RC-96-0089) RTS (NRR 950001) File (810.19-2) i l 4 i 4 NUCLEAR EXCELLENCE-A SUMMER TRADITIONI

Enclosure NRR 950001 Page 1 of 1 Addendum to Attachment I Code Class 1 Bolted Connections AP ^ SIZE COMPONENT DESCRIPTION CLASS DRAWING OC O XVj0

4 bI 12" 1

51 ACCUM A DISCH HEADER CHECK VALVE RB-412-227-48 39 692 l XVj-692 -{b' 12" 1 51 ACCUM B DISCH HEADER CHECK VALVE RB-412-130-40 30 i I 12" 1 51 ACCUM C DISC.H HEADER CHECK VALVE RB-436-032-60 3 -692 14 i XPP0030A REACTOR COOLANT PUMP A SEAL #1 302-671 F-13 LEAKOFF LINE FLANGE XPP00308 REACTOR COOLANT PUMP B SEAL #1

  • 75" 1

RB-436-125-35 302-672 F-12 LEAKOFF LINE FLANGE XPP0030C REACTOR COOLANT PUMP C SEAL #1 '75" 1 RB-436-030-35 302-673 F-12 LEAKOFF LINE FLANGE l l l l l l l l k i l l 1 4 1 ) I ~.. _

Enclosure N,RR 950001 Page 1 of 2 Addendum to Attachment ll Code Class 2 Bolted Connections COD A X ^ SIZE COMPONENT DESCRIPTION C 55 DRAWING O O .75" 2 RC PUMP A SEAL LEAKOFF OUTLET VALVE RB-436-245-36 3 6 E 4 V .75" 2 RC PUMP B SEAL LEAKOFF OUTLET VALVE RB-436-140-45 3 6 E 13 $g 3 E 13 814' S .75" 2 RC PUMP C SEAL LEAKOFF OUTLET VALVE RB-436-050-45 (g$,08'4 I .75" 2 RC PUMP SEAL BYPASS HEADER 150L VALVE RB-412-252-47 5 373 C O7 1" 2 RCP "A" #1 SEAL LEAKOFF CHECK VALVE RB-425 30 67 C 1 1" 2 RCP "B" #1 SEAL LEAKOFF CHECK VALVE RB-423 30 672 C 1" 2 RCP "C" #15EAL LEAKOFF CHECK VALVE RB-424 30 673 C HCv 1" 2 EXCESS LETDOWN HT EXCH FLOW CONTROL VLV RB-412-350-50 92-673 B-07 0 C5 2" 2 673 C-0 RC PUMP SEAL RETURN HDR ! SOL ViV(IRC) RB-412-285-68 lg2-673 A- 0 V 2" 2 LETDOWN FLOW CONTROL H DR RELIEF VALVE RB-412-030-52 S 2-673 ;04 2" 2 RC PUMP SEAL RETURN HEADER RELIEF VALVE RB-412-285-62 (g$,0 I .75" 2 RC PUMP SEAL BYPASS HEADER 150L VALVE RB-412-252-47 673 C O7 Xv 43;95 C5 1" 2 LETDOWN 3 WAY VALVE RB-412-350-50 39 g 3" 2 RCS NORMAL CHARGING HEADER 150L VALVE RB 412-030-52 0 -6 3 B-3" 2 RCS ALTERNATE CHARGING HEADER 150L VLV RB-412-030-52 0 673 3 X C0 CS 3" 2 CVCS CHARGING HEADER CHECK VALVE (IRC) RB-412-285 52 0 _673 O

Enclosure NRR 950001 Page 2 of 2 Addendum to - 1 Code Class 2 Bolted Connections ^ ^ SIZE COMPONENT DESCRIPTION C 55 DRAWING O O Xj08879^;3 bI .75" 2 XVC08948A-SI TEST LINE ISOLATION VALVE RB-412-227-48 3 g9, C X 0 bI 3 692 k3 .75" 2 XVC089488-Si TEST LINE ISOLATION VALVE RB-412-130-40 $,0 .75" 2 XVC08948C-Si TEST LINE ISOLATION VALVE RB-436-015-58 692 13 .75" 2 RC PUMP A #2 SEAL LEAKOFF LINE FLANGES RB-436-245-35 302-671 F 3 3h2-672 F-12.75" 2 RC PUMP B #2 SEAL LEAKOFF LINE FLANGES RB-436-125-35 .75" 2 RC PUMP C #2 SEAL LEAKOFF LINE FLANGES RB-436-030-35 302-673 F-2 k l i l i i I 5 I i i J -}}