ML20101J259
| ML20101J259 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf, Arkansas Nuclear, River Bend, Waterford |
| Issue date: | 03/28/1996 |
| From: | Dewease J ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CNRO-96-00008, CNRO-96-8, NUDOCS 9604010359 | |
| Download: ML20101J259 (6) | |
Text
\\
EntIrgy Cpir;tions,Inc.
PO Ekw 31995
-==~ENTERGY m s e s a928c-995 Tel 601368 5760 Fax 601368 5768 Jerrold G. Dewease vee Neent Opr<ators %ppxt March 28,1996 U.S. Nuclear Regulatory Commission Mail Station O-PI-37 Washington, D.C. 20555 Attention:
Document Control Desk
SUBJECT:
Nuclear Onsite Property Damage Insurance [10 CFR 50.54(w)(3)]
Arkansas Nuclear One Units 1 & 2 Grand Gulf Naclear Station Docket Nos. 50-313 & 50-368 Docket No. 50-416
)
License Nos. DPR-51 & NPF-6 License No. NPF-29 Waterford 3 Steam Electric Station River Bend Station Docket No. 50-382 Docket No. 50-458 License No. NPF-38 License No. NPF-47 CNRO-96/00008 Gentlemen:
In accordance with 10 CFR 50.54(w)(3), the attached summary is submitted to document the primary l
and excess onsite property damage insurance coverage for the nuclear sites of Entergy Operations, Inc. With this submittal, Entergy Operations, Inc. has initiated a consolidated reponing process on behalf of each nuclear unit. The insurance certificates identified in the attachment are available in i
Entergy's itisk Management files.
Should there be any questions concerning this joint submittal, please contact J. L. Taylor-Brown of our Corporate staff at (601) 368-5756.
j i
Sincerely, I
JGD/jlt-b Attachment cc:
(See Next Page) 9604010359 960325
\\ yo PDR ADOCK 05000313 ks J
\\
\\
o Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)]
March 29,1996 CNRO-96/00008 Page 2 of 2 cc:
Mr. J. L. Blount Mr. L. J. Callan Mr. J. N. Donohew Mr. C. R. Hutchinson Mr. G. Kalman Mr. J. R. McGaha Mr. R. B. McGehee Mr. C. P. Patel Mr. N. S. Reynolds Mr. M. B. Sellman Mr L. H. Waldinger Mr. D. L. Wigginton Mr J. W. Yelverton t.
Nuclear Onsite Property Damage Insurance [10 CFR 50.54(w)(3)]
March 29,1996 CNRO-96/00008 Page1of4 Entergy Operations,IncJ Arkansas Power & Light Company Arkansas Nuclear One i
Nuclear Property Insurance i
Effective April 1,1996 i
1 Combined Amount of Primary and Excess Property Insurances is $2.75 Billion.
j Primary:
Policy Period: 4/1/96-97 Insurer: Nuclear Mutual Limited Policy Number: P96-045 Policy Limit: $500,000,000 Excess:
Policy Period: 11/15/95-96 Insurer: Nuclear Electric Insurance Limited 11 Policy No. X95-002 Policy Limit: $1,400,000,000 i
Policy Period: 11/15/95-96 Insurer: Nuclear Electric Insurance Limited Ill Policy No. UX95-002 Policy Limit: $850,000,000
l j
s Nuclear Onsite Property Damage Insurance [10 CFR 50.54(w)(3)]
March 29,1996 CNRO-96/00008 Page 2 0f 4 Entergy Operations,IncJ System Energy Resources,IncJ South Mississippi Electric Pcwer Associatica Grand Gulf Nuclear Station j
Nuclear Property Insurance Effective April 1,1996 Combined Amount of Primary and Excess Property Insurances is $2.75 Billion.
Primary:
Policy Period: 4/1/96-97 Insurer: Nuclear Mutual Limited Policy Number: P96-026 Policy Limit: $500,000,000 Excess:
Policy Period: 11/15/95-96 Insurer: Nuclear Electric insurance Limited 11 Policy No. X95-047 Policy Limit: $1,400,000,000 Policy Period: 11/15/95-96 Insurer: Nuclear Electric Insurance Limited til Policy No. UX95-047 Policy Limit: $850,000,000 i
I I
l l
l
l l
s>
l l_
Nuclear Onsite Property Damage insurance [10 CFR 50.54(w)(3)]
March 29,1996 CNRO-96/00008 Page 3 of 4 l
Entergy Operations,IncJ Louisiana Power & Light Company l
Waterford 3 Steam Electric Station Nuclear Property Insurance l
Effective April 1,1996 t
Combined Amount of Primary and Excess Property Insurances is $2.75 Billion.
l Primary:
Policy Period: 4/1/96-97 Insurer: Nuclear Mutual Limited Policy Number: P96-036 Policy Limit: $500,000,000 1
Excess:
Policy Period: 11/15/95-96 Insurer: Nuclear Electric Insurance Limited 11 Policy No. X95-053 Policy Limit: $1,400,000,000 Policy Period: 11/15/95-96
(
Insurer: Nuclear Electric Insurance Limited 111 l
Policy No. UX95-053 l-Policy Limit: $850.000,000 4
i
e O
Nuclear Onsite Property Damage Insurance [10 CFR 50 54(w)(3))
March 29,1996 CNRO-96/00008 Page 4 of 4 Entergy Operations,IncJ Gulf States Utilities Company /
Cajun Electric Power Cooperative,Inc.
River Bend Station Nuclear Property Insurance Effective April 1,1996 Combined Amount of Primary and Excess Property Insurances is $2.75 Billion.
Primary:
Policy Period: 4/1/96-97 Insurer: American Nuclear Insurers / Mutual Atomic Energy Liability Underwriters Policy Number: 96203 Limits: $500,000,000 Excess:
Policy Period: 11/15/95-96 Insurer: Nuclear Electric Insurance Limited 11 Member Insured: Gulf States Utilities Company Respective Interest. 70%
Member Insured: Cajun Electric Power Cooperative, Inc.
Respective Interest: 30%
Policy No. X95-066 Limits: $1,400,000,000 Policy Period: 11/15/95-96 Insurer: Nuclear Electric Insurance Limited 111 Member Insured: Gulf States Utilities Company (Cajun is an Insured)
Policy Number: UX95-066 Limits: $595,000,000 (70% of $b50,000,000)
Policy Period: 1/1/96-11/15/96 Insurer: American Nuc' ear Insurers / Mutual Atomic Energy Liability Underwriters Named Insured: Cajun Electre Power Cooperative, Inc. (GSU is an Insured)
Policy Number: XS96260 Limits: $255,000,000 (30% of $850,000,000)