ML20101J215
| ML20101J215 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 03/25/1996 |
| From: | Dennis Morey SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9604010344 | |
| Download: ML20101J215 (2) | |
Text
._
Southem Nuciser Operating Comptny Post Offica Box 1295 i
Birmingham, Alabama 35201 1
Telgphorts (205) 868-5131 L
Southern Nudear Operating Company o.ve morey Vice President Farley Project the southem electnc system March 25, 1996 Docket Numbers 50-348 50-364 l
U. S. Nuclear Regulatory Commission i
ATIN: Document Control Desk Washington, DC 20555 1
Joseph M. Farley Nuclear Plant 1995 Annual Diesel Generator Reliability Data Reoort Ladies and Gentlemen:
Attached is the Annual Diesel Generator Reliability Data Report for 1995, which is submitted in accordance with Farley Nuclear Plant (FNP) Technical Specification 6.9.1.12. This report provides i
the number of tests (valid or invalid) for 1995. There were no failures of an FNP diesel generator in 1995; therefore, no information identified in Regulatory Position C.3.b of Regulatory Guide 1.108, Revision 1, August 1977, is required to be reported.
If there are any questions, please advise.
Respectfully submitted,
[b )/lcze' Dave Morey DRC/maf:dg-ar-95. doc
Attachment:
1995 Annual Diesel Generator Reliability Data Report cc:
U. S. Nuclear Regulatory Commission. Washincton. DC Mr. B. L. Siegel, NRR Senior Project Manager U. S. Nuclear Regulatory Commission. Region II Mr. S. D. Ebneter, Regional Administrator Mr. T. M. Ross, FNP Senior Resident inspector 9604010344 951231 PDR ADOCK 05000348 R
PDR 010C87 IV
\\\\
4 i
i i
l i
i 1
j 1995 ANNUAL DIESEL GENERATOR RELIABILITY DATA REPORT
(
1 I
i Diesel Generator 1-2A IB 2B IC Totals Valid Successful Tests 15 17 16 14 62 Invalid Tests 15 21 23 11 70 l
Valid Failures 0
0 0
0 0
1 1
i invalid Failures 0
0 0
0 0
t l
ATTACllMENT PAGE 1 OF 1
. _ _ -