ML20101J241
| ML20101J241 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 12/12/1984 |
| From: | Danni Smith COMMONWEALTH EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 84-08, 84-8, 9519N, NUDOCS 8412280468 | |
| Download: ML20101J241 (2) | |
Text
,
x,.
hp1 (&
, Commonwealth Edison
> One Fir;t Nation'l Ptar, Ctucigo. Illinois
? Address Rip!y tJ: Post Offica Box 't67 Chicago, lihnois 60690 December 12, 1984 Mr. James G. Keppler Regional Administrator U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137
Subject:
Braidwood Station Units 1 and 2 10 CFR 50.55(e) No. 84-08 Interim Report Ventilation, Housing Installation NRC Docket Nos. 50-456/457 References (a):
E. D. Swartz letter to J. G. Keppler dated July 18, 1984 (b):
D. H. Smith letter to J. G. Keppler dated October 9, 1984
Dear Mr. Keppler:
References (a) and (b) provided information concerning a deficiency reportable pursuant to 10 CFR 50.55(e) regarding the adequacy of installation and inspection of the quarter-inch liner plates for the Auxiliary Building Ventilation Exhaust Filter Huusings, the Unit 1 and 2 Reactor Containment Fan Cooler Housing, and the Unit 1 and 2 eighty-four inch return air risers at our Braidwood Station.
The purpose of this letter is to provide an updated status of the corrective actions taken to resolve this issue.
This letter is considered to be an Interim Report.
STATUS OF CORRECTIVE ACTION Sargent & Lundy (S&L) will field verify and evaluate the as-built conditions of the subject housings and risers.
Following evaluation, S&L will develop sketches and drawings to be used by Pullman Sheet Metal (PSM) to document remaining configuration and weld quality inspections.
PSM is continuing to review and organize existing documentation to identify missing weld quality inspection records.
Following completion of this review, PSM will use the S&L sketches and drawings to conduct the necessary inspections to develop a complete inspection record.
l At this time, it is anticipated that the S&L field verification effort will be initiated in January, 1985.
However, an overall implementation schedule for all corrective actions has not been developed.
An interim report updating the status of corrective actions will be submitted by March 15, 1985.'
@ 1 4 1984 8412280468 841212 PDR ADOCK 05000456 B
PDR j
.T 6J 7 Q
) -l L Please address any questions that you or your staff may have concerning this matter to this office.
Veritrulypurs, N
D David H.
mith Nuclear Licensing Administrator cc:
NRC Resident Inspector - Braidwood Director of Inspection and. Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 9519N
.