Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20107F338 + (07:12:02, 13 December 2024)
- 05000352/LER-1996-009, :on 960314,five of Six as-found Setpoint Tests on Main Steam Sys SRVs Found Outside Required Pressure Ranges.Caused by Setpoint Drift Due to Corrosion Induced Bonding.Modified Pilot Disc Installed in SRVs + (07:12:04, 13 December 2024)
- ML20107F330 + (07:12:05, 13 December 2024)
- IR 05000219/1975026 + (07:12:27, 13 December 2024)
- ML20107F318 + (07:12:28, 13 December 2024)
- ML20107F313 + (07:12:29, 13 December 2024)
- ML20107F311 + (07:12:30, 13 December 2024)
- ML20107F302 + (07:12:34, 13 December 2024)
- ML20107F301 + (07:12:35, 13 December 2024)
- ML20107F294 + (07:12:36, 13 December 2024)
- ML20107F284 + (07:12:37, 13 December 2024)
- ML20107F273 + (07:12:38, 13 December 2024)
- ML20107F270 + (07:12:39, 13 December 2024)
- ML20107F268 + (07:12:39, 13 December 2024)
- 05000353/LER-1996-003-02, :on 960314,failed to Perform Accelerated Surveillance Testing of Unit 2 EDG Due to Inadequate Evaluation Program.Reviewed & Enhanced Program & Associated Implementing Documents for Failure Evaluations + (07:12:41, 13 December 2024)
- ML20107F248 + (07:12:42, 13 December 2024)
- ML20107F238 + (07:12:43, 13 December 2024)
- 05000353/LER-1996-002-02, :on 960315,ESFA Occurred Due to Loss of Power to Rps/Ups Power Distribution Panel.Caused by Inadvertent Actuation of Underfrequency Relay.Created Necessary Addl Physical Barriers Arounds Units 1 & 2 + (07:12:45, 13 December 2024)
- ML20107F230 + (07:12:46, 13 December 2024)
- ML20107F232 + (07:12:46, 13 December 2024)
- ML20107F221 + (07:12:47, 13 December 2024)
- ST-HL-AE-1190, Forwards Response to Site Analysis Branch Questions 310.1 Through 310.10 Received on 850129.Questions & Responses Address Environ Rept - Ol,Including Description of Changes in Station External Layout + (07:12:48, 13 December 2024)
- ML20107F218 + (07:12:49, 13 December 2024)
- 05000293/LER-1995-011, :on 951206,RCICS Was Inoperable Due to Unplanned Maint to Replace Intermittent Tripping Power Inverter.Mr 19503503 Was Initiated to Perform Initial Troubleshooting + (07:12:51, 13 December 2024)
- ML20107F213 + (07:12:52, 13 December 2024)
- ML20107F210 + (07:12:53, 13 December 2024)
- ML20107F209 + (07:12:54, 13 December 2024)
- ML20107F201 + (07:12:55, 13 December 2024)
- ML20107F199 + (07:12:56, 13 December 2024)
- ML20107F190 + (07:12:57, 13 December 2024)
- ML20107F187 + (07:12:58, 13 December 2024)
- NSD-NRC-96-4692, Forwards Draft Rev to Portions of AP600 Initial Test Program (SSAR Chapter 4).Table 1 Provides Revised Table of Contents for Initial Test Program & Identifies Portions Included in Encl + (07:12:59, 13 December 2024)
- ML20107F181 + (07:12:59, 13 December 2024)
- B11330, Provides Info Re Assurance That Facility Designed & Constructed Per Applicable FSAR Requirements,In Response to NRC 840813 Request.Review & Responses Requested to Allow Resolution by 841130 + (07:13:02, 13 December 2024)
- 05000315/LER-1985-003, :on 840116,Train a Battery Not Declared Inoperable Per Tech Spec 4.8.2.4.2.Caused by Misunderstanding Between Personnel.Requirement Will Be Added to Surveillance Procedure + (07:13:04, 13 December 2024)
- ML20107F152 + (07:13:06, 13 December 2024)
- ML20107F151 + (07:13:07, 13 December 2024)
- RBG-19-211, Forwards Updated Seismic Category 1 safety-related Equipment Master List for Both Balance of Plant & Nsss.List Reflects Projected Status of Each Component as of 841029 + (07:13:07, 13 December 2024)
- ML20107F133 + (07:13:08, 13 December 2024)
- ML20107F131 + (07:13:09, 13 December 2024)
- ML20107F120 + (07:13:10, 13 December 2024)
- ML20107F118 + (07:13:11, 13 December 2024)
- ML20107F116 + (07:13:12, 13 December 2024)
- ML20107F113 + (07:13:13, 13 December 2024)
- NLS8400020, Responds to IE Bulletin 84-03, Refueling Cavity Water Seal. Summary Rept on Each on Seven Areas of Concern Submitted.Gross Seal Failure Considered Remote Possibility Due to Passive Design of Reactor Well Bellows Seal + (07:13:14, 13 December 2024)
- ML20107F103 + (07:13:15, 13 December 2024)
- ML20107F100 + (07:13:16, 13 December 2024)
- ML20107F099 + (07:13:17, 13 December 2024)
- ML20107F091 + (07:13:18, 13 December 2024)
- B11338, Forwards Comments on NUREG-1031, SER Re Operation of Millstone Nuclear Power Station Unit 3 + (07:13:19, 13 December 2024)
- 05000322/LER-1985-003, :on 850104,discrepancy Between Requirements to Maintain Fire Watches & to Remove People from Area Reconciled.Subsequent Review W/Nrc Brought About Slight Changes in Procedures Re Fire Watches + (07:13:21, 13 December 2024)