OPERATING DATA REPORT DOCKET N0 50-369 DATE Acril 15. 1996 0FERATING STATUS CONPLETED BY R.A. Williaes TELEPHONE 704-382-5346

1. Unit Nase: McGuire 1
2. Reporting Period: March 1, 1996-March 31, 1996
3. Licensed Thereal Power (Mt): 3411
4. Naseplate Rating (6 toss We): 1305e Notes *Naseplate Rating
5. Design Electrical Rating (Net NWe): 1180 (Gross W e) calculated as
6. Maxisue Dependable Capacity (6ross He):  !!?! 1450.000 MVA a .90 power
7. Maxieue Dependable Capacity (Net NWe): 1129 factor per Page 111,
8. If Changes occur in capacity Ratings (!!ees Nueber 3 Through 7) Since Last NUREG-0020.

Report. Give Reasons: ,,,__.,

9. Powr, !? vel To Which Restricted, If Any (Net Me): l

, 10. Re a r "3r Restrictions, if any: )

.l 1

l l' ThisMonth Yr.-to-Date Cueulative l

11. Hours in Reporting Period 744.0 2184.0 125640.0
12. Number Of Hours Reactor Was critical 744.0 1605.5 90044.8
13. Reactor Reserve Shutdown Hours --0-- --0-- -
14. Hours 6enerator On-Line 744.0 1513.8 89045.3
15. Unit Reserve Shutdown Hours - --0-- --0--
16. Gross Thersal Energy Generated (MWH) 2533375 5002244 279756346
17. Gross Electrical Ehergy Gen,'.ated (MWH) 881107 1730261 96105541
18. Het Electrical Energy Generated (MH) 849934 1656923 91824494
19. Unit Service Factor 100.0 69.3 70.9
20. Unit Availability factor 100.0 69.3 70.9
21. Unit Capacity Factor (Using MDC Net) 101.2 67.2 63.8
22. Unit Capacity factor (Using DER Net) 96.8 64.3 61.9 i

!' 23. Unit Forced Outage Rate 0.0 3.7 13.4 I

j. 24. Shutdown Scheduled Over Next 6 Months (Type, Dh, and Duration of Each): j
None

, 25. If Shut Denn At End Of Repcrt Period. Estiaated Date of Startup

26. Units in Test Status (Prior to Coseercial Operation): Forecast Achieved l

i I j INITIAL CRITICALITY INITIAL ELECTRICITY j COMERCIAL OPERATION I i

, 9604220293 960415 PDR ADOCK 05000369  !

p PDR t

OPERATING DATA REPORT DOCKET NO 50-369 UNIT McGuire 1 DATE April 15, 1996 COMPLETED BY R.A. Williams  !

TELEPHONE 704-382-5346 I

MONTH Harch. 1996 My, AYERA6E DAILY POWER LEVEL DE . AVERA6E DAILY POWER LEVEL l (Me-Net) (Me-Net)

'1 1143 17 1143 2 1142 18 1142 3 1141 19 1142 4 1142 20 1144 5 1144 21 1143 6 1144 22 1143 7  !!43 23 1142  !

1 8 1142 24 1143 l

9 1143 25 1143 10 1142 26 1142 11 1142 27 1139 12 . 1142 28 1138  ;

I 13 1144 29 1142

, l l

14 1144 30 1141 i-l 15 1144 31  !!41 L

f 16  !!44

)

i I i

.] -

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 U N I T N A M E M w y 1 x t. 1 DATE us/id/96 REPORT MONTH March 1996 COMPLETED BY K. A. Willi ~ams TELEPHONE (/us)-362-d346 (1) (2) (3) (4) (5) -

R MET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1) (2) (3) (4)

F Forced Reason: Method: Exhibit G - Instructions S Scheduled A-Equioment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram EntU Sheets For Licensee C-Refueling 3-Automatic Scram (LER D-Regulato g Restriction 4-Other (Explain) Event File Report ( M EG-0161))

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)

i .

l l

i l DOCKET: 50 - 369 l

r UNIT: McGuire 1 Date: 04/15/96 l

NARRATIVE

SUMMARY

l l

l MONTH: March,1996 McGuire Unit I began the month of March in operating at 100% full power. The unit operated at or near 100% full power for the entire month.

l j .:

r I

i Prepared by: R. A. Williams Telephone:(704)- 382-5346

1 1

l l

l

! I MONTHLY REFUELING INFORMATION REOUEST  ;

l l

1. Facility name: McGuire. Unit 1
2. Scheduled next refueling shutdown: Eebruary 1997 I
3. Scheduled restart following refueling: May 1997 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF l ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 l THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT. l l
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

i

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

l l 6. Important licensing considerations (new or different design or supplier, unreviewed design or l performance analysis methods, significant changes in design or new operating procedures).

l l

l 7. Number of Fuel assemblies (a) in the core: 192 (b) in the spent fuel pool: 223

8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: - .:
9. Projected date of last refueling which can be accommodated by present license capacity: hiarrgh a

2006***

DUKE POWER COMPANY DATE: Acril 15.1996 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 I

l i

i n

4 i

i

OPERATING DATA REPORT DOCKET NO 50-370 DATE April 15. 1996 0FERATING STATUS COMPLETED BY R.A.Willians TELEPHONE 704-362-5346

1. Unit Nase: McGuire 2
2. Reporting Period: March 1, 1996-March 31, 1996
3. Licensed Thersal Power (MWti: 3411
4. Naseplate Rating (Gross MWel 1305e Notes eNaseplate Rating
5. Design Electrical Rating (Net MWe):  !!80 (Gross MWel calculated as
6. Maxisus Dependable Cap: city (6 toss MWe): 1171 1450.000 MVA x .90 power
7. Maxisus Dependable Capacity (Net MWel: 1129 factor per Page iii,
8. If Changes Occur in Capacity Ratings (!tess Fusber 3 Through 7) Since Last NUREB-0020.

Report. Give Reaaens:

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If anyt _

This Month Yr.-to-Date Cusulative j  !!. Hours in Reporting Period 744.0 2184.0 105936.0

12. Wusber Of Hours Reactor Was Critical 744.0 2184.0 83939.6
13. Reactor Reserve Shutdown Hours --0-- --0-- - 14. Hours Benerator On-Line 744.0 2184.0 82914.8
15. Unit Reserve Shutdown Hours --0-- - --0--

16, 6ross Thereal Energy Generated (MWH) 2452599 7345463 272585112 l 17. Gross Electrical Energy Generated (MWH) 890710 2591302 95094578

18. Net Electrical Energy Generated (MWH) 849617 2499143 91Ln500
19. Unit Service Facter 100.0 100.0 78.3
20. Unit Availability Factor 100.0 100.0 78.3
21. Unit Capacity Factor (Using MDC Net) 101.2 101.4 75.5
22. Unit Capacity Factor (using DER Net! 96.8 97.0 73.0
23. Unit Forced Outage Rate 0.0 0.0 6.2
24. Shutdoun Scheduled Over Next 6 Months (Type, Date, and Duration of Eacht:

! Refueling - April 05. 1996 - 45 days

, 25. If Shut Down At End Of Report Period. Estlaated Date of Startup:

26. Units In Test Status (Prior to Consercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERAi!0N

OPERATIN6 DATA REPORT DOCKET NO- 50-370 UNIT NcGuire 2 DATE April 15. 1996 COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 MONTH March. 1996 081 . AYERA6E DAILY POWER LEVEL l$Al AVERASE DAILY POWER LEVEL' (MWe-Net) (MWe-Net)

'l  !!47 17 '!!48 2 1085 .18 1145  ;

3- 1033 19 1140 4 1145 20 1145 5 1150 21 1146 6  !!51 22 1148 7 1151 23 - 1148 8 1140 24 1149 9 1148 25 1148 10 1147 26 1149 11 1147 27 1145 12  !!40 2B 1143 13 1150 29  !!49 14 1150 30 1148 15 1150 31 1148 l.

l- 16 1150 i

l l

{

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 UNIT NAME muuy1x4 z DATE ve/1d/so REPORT MONTH March 1996 CCMPLETED BY x. a. willi,ams TELEPHONE (fueJ-Juz-dded (1) (2) (3) (4) (5) '.

R MET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O WN REPORT TEM COMPONENT ACTION TO DATE E HOURS N RX- NO. CODE CODE PREVENT RECURRENCE ~

NO SHUTDOWNS OR REDUCTION S (1) (25 (3) (4)

F Forced .b.eason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent w Sheets For Licensee Event Report (LER C-Refueling 3-Automatic Scram D-Regulaton Restriction 4-Other (Explain) File ( N G-0161))

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)

r- 1 1

l i

l DOCKET: 50 - 370 i

l UNIT: McGuire 2 Date: 04/15/96 -

l l

l-NARRATIVE

SUMMARY

l MONTH: March,1996 i McGuire Unit 2 began the month of March operating at 100% full power. The unit operated at or near 100% full power for the entire month.

1 i

l l

l l.

I l

l l

Prepared by: R. A. Williams l

Telephone: (704)- 382-5346 i

i a

h i

t I

v - - - . -

~ = - - ,-wwr r,-

4 MONTHLY REFUELING INFOllMATION REOUEST l

1. Facility name: McGuire. Unit 2
2. Scheduled next refueling shutdown: April 1996

)

3. Scheduled restart following refueling: May 1996 l

THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 j THROUGH 6 WILL NO LONGER BE MAINTALNED IN THIS REPORT. '

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?  !

I

5. Scheduled date(s) for submitting proposed licensing action and supporting information. I l
6. Important licensing considerations (new os different design or supplier, unreviewed design or l performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 19]

(b) in the spent fuel pool: 39)  ;

8. Present licensed fuel pool capacity: 14M Size of requested or planned increase: - -
9. Projected date of last refueling which can be accommodated by present license capacity:

December 200.]

DUKE POWER COMPANY DATE: April 15.1996 Name of

Contact:

R. A. Williams Phone: (704)- 382-5345