ML20107F301

From kanterella
Jump to navigation Jump to search
Forwards List of Sf Shipments Left at Plant as of 751217
ML20107F301
Person / Time
Site: Oyster Creek
Issue date: 12/22/1975
From: Greenman E
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML18039A986 List: ... further results
References
FOIA-95-258 NUDOCS 9604220288
Download: ML20107F301 (2)


Text

L

'I.

2 2 bl5)

  • A*S'

,.g.

i Memo to File i

Thru:

D. L. Caphton, Section Leader, Reactor Projects Section No. 2 Region I, Reactor Operations and Nuclear Support Branch I

OYSTER CAEEK I

(DN 50-219)

I SPENT FUEL WHIPMENTS The following spent fuel shipments left the Oyster Creek site as of December 17, 1975.

Shipment Number Fuel Bundle Number Time of Departure 86 JC535, JC338 1:20 p.m. 10/23/75 87 JC255, JC359 7:30 p.m. 10/25/75 88 JC399, JC365 3:20 p.m. 10/27/75 89 JC29, JC405 7:45 p.m. 10/29/75 90 JC415, JC181 3:30 p.m. 10/31/75 91 JC403, JC419 12:15 p.m. 11/3/75 92 JC194, JC422 7:00 p.m. 11/5/75 93 JC99, JC442 4:30 p.m. 11/7/75 94 JC482, JC187 2:45 p.m. 11/9/75 95 JC144, JC498 11:30 p.m. 11/12/75 96 JC272, JC376 7:30 p.m. 11/13/75 97 JC354, UC281 11:45 p.m. 11/16/75 i

98 JC396, JC269 8:45 p.m. 11/16/75 l

99 JC497, JC262 4:25 p.m. 11/18/75 100 JC176, JC353 6:00 p.m. 11/19/75 101 JC324, JC166 2:30 p.m. 11/21/75 1

' 102 JC311, JC139 4:00 p.m. 11/23/75 103 JC124, JC70 6:00 p.m. 11/20/75 104 JC270, JC120 9:00 p.m. 12/1/75 105 JC402, JC253 4:45 p.n. 12/1/75 106 JC167, JCS21 3:45 p.m. 12/3/75 107 JC528, JC169 5:00 p.m. 12/4/75 108 JC557, JC208 5:00 p.m. 12/5/75 109 JC216, JC441 2:10 p.m. 12/7/75 12/9/75 i

110 JC217, JC386 12/10/75 111 JC232, JC16 12/15/75 112 JC234, JC17 Prior shipments bring the total movement to date to 224 bundles. The last shipment completed the licensee's contract with NFS for storage of spent fuel at the West Railey, New York site. The licensee achieved i

fell core loading capability (560. bundles). Spent fuel pool space available as of 12/17/75 is 572 bundles.

/

p1 9604220288 960213 PDR FOIA DEKOK95-258 PDR

..c,

-i 1e

_2 268 spent fual bundles remain in the pool. This concludes the periodic status report maintained by the projects.

i Edward G. G m n Reactor Inspector f

4 cc.:

J. P. O'Railly

.E. J. Brunner J. P. Stohr P. d. Knapp 4

i i

1 1

1 7

i

,c V

l l

)

l

,~

Y

\\

e

!p' DEC 2 21975 2

g\\&,

Memo to File f

-Wcy; Thru:-

D. L. Caphton, Section Leader, Reactor Projects Section No. 2 Region 1, Reactor Operations and Nuclear Support Branch OYSTER CREEK (DN 50-219)

SPENT FUEL SHIPMENTS The following spent fuel ' shipments lef t tiie Oyster Creek site as of December 17, 1975.

Shipment Number Fuel Bundle Number Time of Departure 86 JC535, JC338 1:20 p.m. 10/23/75 87 JC255, JC359 7:30 p.m. 10/25/75 88 JC399, JC365 3:20 p.m. 10/27/75 89 JC29, JC405 7:45 p.m. 10/29/75 90 JC415, JC181 3:30 p.m. 10/31/75 91 JC403, JC419 12:15 p.m. 11/3/75 92 JC194, JC422 7:00 p.m. 11/5/75 93 JC99, JC442 4:30 p.m. 11/7/75 94 JC482, JC187 2:45 p.m. 11/9/75 95 JC144, JC498 11:30 p.m. 11/12/75 96 JC272, JC376 7:30 p.m. 11/13/75 97

. JC354, JC281 11:45 p.m. 11/16/75 98 JC396, JC269 8:45 p.m. 11/16/75 99 JC497, JC262 4:25 p.m. 11/18/75 100 JC176, JC353 6:00 p.m. 11/19/75 101 JC324, JC166 2:30 p.m. 11/21/75 102 JC311, JC139 4:00 p.m. 11/23/75 103 JC124, JC70 6:00 p.m. 11/28/75 104 JC270, JC120 9:00 p.m. 12/1/75 105 JC402, JC253 4 :45 p.m.12/1/75 106 JC167, JCS21 3:45 p.m. 12/3/75 107 JC528, JC169 5:00 p.m. 12/4/75 108 JC557, JC208 5:00 p.m. 12/5/75 109 JC216, JC441 2:10 p.m. 12/7/75 12/9/75 110 JC217, JC386 111 JC232, JC16 12/10/75 12/15/75 112 JC234, JC17 Prior shipments bring the total movement to date to 224 bundles.

The last shipment completed the licensee's contract with NFS for storage of spent fuel at the West Valley,.New York site.

The licensee achieved

'f611 core loading capability (560 bundles).

Spent fuel pool space available as of 12/17/75 is 572 bundles.

g01

-ncnzadr ey

J.

a h-i i.*

268 spent fuel bundles remain in the pool. This concludes the periodic status report maintained by the projects.

j,

(*

p Edward G. Greenman Reactor Inspector cc:

J. P. O'Reilly

~

i E. J. Brunner-J. P. Stohr P. J. Knapp i

1 e

1

OmW g

i

.i