Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20115E973 + (04:22:12, 13 December 2024)
- JAFP-96-0275, Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant + (04:22:13, 13 December 2024)
- ML20115E971 + (04:22:13, 13 December 2024)
- 3F0485-05, Forwards Rev 4 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR73.21) + (04:22:14, 13 December 2024)
- 1CAN048503, Discusses Inspectability of Sleeved once-through Steam Generator Tubes,Per 850228 Request.Addl Time Necessary for Complete Response.Info Will Be Provided by 850510 + (04:22:15, 13 December 2024)
- ST-HL-AE-5425, Submits Change to Distribution List for Transmittals Re Facility + (04:22:15, 13 December 2024)
- ML20115E915 + (04:22:16, 13 December 2024)
- ML20115E902 + (04:22:17, 13 December 2024)
- 05000325/LER-1992-024, :on 920919,relay Failure Resulted in RPS B Power Loss Causing ESF Actuation Signals.Caused by Broken T-Bar in Relay 1-C71B-K1B.Relay Repaired,Fuse Replaced & RPS Bus B Restored + (04:22:23, 13 December 2024)
- BECO-92-119, Forwards Anticipated Operator Licensing Exam Schedule,Per GL 92-06, Operator Licensing Natl Exam Schedule + (04:22:25, 13 December 2024)
- ST-HL-AE-1225, Forwards Effective Page Listing to FSAR Through Amend 45. Listing Not Formal Addition & Will Be Updated Periodically + (04:22:25, 13 December 2024)
- ML20115E892 + (04:22:26, 13 December 2024)
- 05000325/LER-1992-021, :on 920920,south CS Room Fire Protection Sprinkler Sys Placed Under Clearance W/O Required Fire Watch.Event Reviewed W/Operations Personnel Emphasizing Need for Precise Communications Between Groups + (04:22:33, 13 December 2024)
- ML20115E887 + (04:22:34, 13 December 2024)
- ML20115E879 + (04:22:35, 13 December 2024)
- RC-96-0168, Submits Suppl Info,As Requested by NRC to Support SE Presented as Attachment II to Util ,Requesting Amend to TS Re MOVs Thermal Overload Protection & Bypass Devices + (04:22:36, 13 December 2024)
- ML20115E877 + (04:22:36, 13 December 2024)
- 05000341/LER-1992-010, :on 920918,auto-start Logic for All Station Air Compressors Lost When Modular Power Unit MPU-3 Deenergized. Caused by Personnel Error.Accountability Meeting Held to Address Event & AOP Revised + (04:22:38, 13 December 2024)
- ML20115E849 + (04:22:40, 13 December 2024)
- ML20115E852 + (04:22:40, 13 December 2024)
- ML20115E847 + (04:22:41, 13 December 2024)
- ML20115E844 + (04:22:41, 13 December 2024)
- ML20115E835 + (04:22:42, 13 December 2024)
- 05000341/LER-1992-008, :on 920919,electrician Did Not Open Bus 65F Trip Cutoff Switch,Resulting in Deenergization of Bus.Caused by Personnel Error.Continuing Training for Operations & Electrical Maint Will Be Emphasized + (04:22:44, 13 December 2024)
- ML20115E832 + (04:22:46, 13 December 2024)
- ML20115E825 + (04:22:47, 13 December 2024)
- ML20115E811 + (04:22:48, 13 December 2024)
- ML20115E804 + (04:22:49, 13 December 2024)
- ML20115E799 + (04:22:50, 13 December 2024)
- ML20115E780 + (04:22:51, 13 December 2024)
- ML20115E738 + (04:22:52, 13 December 2024)
- ML20115E746 + (04:22:52, 13 December 2024)
- 05000413/LER-1996-006-01, :on 960509,discovered Containment Floor and Equipment Sump Level Monitoring Inaccuracy.Caused by Inadequate Design Analysis.Added Water to Sumps to Ensure Sump Level Remains in Calibr Range + (04:22:55, 13 December 2024)
- ML20115E715 + (04:22:57, 13 December 2024)
- ML20115E713 + (04:22:58, 13 December 2024)
- ST-HL-AE-5405, Provides Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves + (04:22:59, 13 December 2024)
- 05000254/LER-1996-010-02, :on 960611,discovered Installed Gallery Steel Configuration Lacked Required Cross Bracing.Caused by Deficiency in Original Design Configuration Control Process. Installed Gallery Cross Bracing + (04:23:00, 13 December 2024)
- ML20115E699 + (04:23:02, 13 December 2024)
- ML20115E686 + (04:23:02, 13 December 2024)
- ST-HL-AE-5409, Requests NRC Authorization to Allow Certain Employees of DOL Access to Safeguards Info as Needed for Consideration of Cases Pending Before DOL Administrative Review Board + (04:23:06, 13 December 2024)
- ML20115E667 + (04:23:06, 13 December 2024)
- 05000454/LER-1996-003-10, :on 960417,identified Defective Tubes.Cause Undetermined.Removed Defective Tubes Either by Plugging or Sleeving + (04:23:08, 13 December 2024)
- ML20115E651 + (04:23:09, 13 December 2024)
- RC-96-0171, Forwards Mod to Plant NPDES Permit SC0030856.Rev Approved by Sc Dept of Health & Environ Control on 960624 + (04:23:10, 13 December 2024)
- PMNS20200471, Meeting with Nuclear Industry to Discuss Potential Emergency Preparedness Enforcement Guidance and Exemption Requests Due to the COVID-19 Public Health Emergency + (04:23:11, 13 December 2024)
- ML20115E618 + (04:23:12, 13 December 2024)
- NMP1L3339, R. E. Ginna Station - Constellation Energy Group, LLC: Notification of Change in Indirect Ownership + (04:23:13, 13 December 2024)
- ML20115E591 + (04:23:13, 13 December 2024)
- LR-N20-0025, 2019 Annual Radioactive Effluent Release Report (Rerr) + (04:23:16, 13 December 2024)
- ML20115E574 + (04:23:16, 13 December 2024)
- ML20115E573 + (04:23:17, 13 December 2024)