ML20115E825
| ML20115E825 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 07/10/1996 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Public Service Electric & Gas Co, Philadelphia Electric Co, Delmarva Power & Light Co, Atlantic City Electric Co |
| Shared Package | |
| ML20115E829 | List: |
| References | |
| DPR-75-A-165 NUDOCS 9607160245 | |
| Download: ML20115E825 (5) | |
Text
'
gn Reco
[
4 UNITED STATES E
NUCLEAR REGULATORY COMMISSION f
WASHINGTON D.C. 20566 4001 s...../
l PUBLIC SERVICE ELECTRIC & GAS COMPANY PHILADELPHIA ELECTRIC COMPANY DELMARVA POWER AND LIGHT COMPANY
~
l ATLANTIC CITY ELECTRIC COMPANY i
DOCKET N0. 50-311 SALEM NUCLEAR GENERATING STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.165 License No. DPR-75 1.
The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
A.
The application for amendment filed by the Public Service Electric &
Gas Company, Philadelphia Electric Company, Delmarva Power and Light l
Company and Atlantic City Electric Company (the licensees) dated 1
May 7,1996, as supplemented June 14, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-75 is hereby amended to read as follows:
J 9607160243 960710 PDR ADOCK 05000311 P
(2) Technical Soecifications and Environmental Protection Plan The Technical Specifications contained in Appendices A and B, as revised through Amendment No.165, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance, to be implemented within 30 days.
FOR.THE NUCLEAR REGULATORY COMMISSION
} ni /b-~W John F. Stolz, Director Project Directorate 1-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: July 10,1996 L
l 0
L i
ATTACHMENT TO LICENSE AMENDMENT NO.165 r
FACILITY OPERATING LICENSE NO. DPR-75 DOCKET NO. 50-311 i
f Revise Appendix A as follows:
l Remove Paaes Insert Paaes 3/4 7-15 3/4 7-15 l
3/4 7-16 3/4 7-16 l
l i
i j
e i
(
i l
__~ _.
i PLANT SYefEMS 3/4.7 G CONTROL ROOM EMERGENCY AIR CONDITIONING SYSTEM LIMITING _ CONDITION FOR OPERATION l
3.7.6 The control room emergency air conditioning system shall be OPERABLE with:
a.
Two fans, b.
One cooling coil, c.
One charcoal adsorber and HEPA filter train, and d.
At least two isolation dampers in each outside air intake duct.
APPLICABILITY: ALL MODES #
l ACTION:
MODES 1, 2,
3, and 4 a.
With one fan inoperable, restore the inoperable fan to OPERABLE status within 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b.
With the cooling coil inoperable, restore the cooling coil to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
c.
With the filter train inoperable, restore the filter train to OPERABLE
{
status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, d.
With only one isolation damper in an outside air intake duct' OPERABLE, close the affected duct within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one isolation damper secured in the closed position or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
MODES 5 and 6 #
l With less than the full complement of control room emergency air a.
conditioning system components OPERABLE, restore the inoperable components to OPERABLE within the time. intervals allowed by the ACTION statement for MODES 1, 2,
3, and 4 or initiate and maintain operation of the control room emergency air conditioning system in the recirculation mode.
b.
With both fans, the cooling coil or the filter train inoperable or with less than two OPERABLE isolation dampers in each outside air intake duct, suspend all operations involving CORE ALTERATIONS or positive reactivity changes.
The provisions of Specification 3.0.3 are not applicable in MODE 6.
c.
- MODES S and 6 are excluded from the specification's applicability until entry into MODE 4 following startup from the current 1996 extended outage.
The specification's applicability will return to ALL MODES following entry into MODE 4.
SALEM - UNIT 2 3/4 7-15 Amendment No.165 l
e l
PLANT SYSTEMS f
SURVEILLTMCE REQUIREMENTS 4.7.6.1 The control room emergency air conditioning system shall be demonstrated OPERABLE:
At least once per 31 days by initiating flow through the HEPA a.
filter and charcoal adsorber train and verifying that the train operates for at least one hour and maintains the control room air temperature less than or equal to 120'F with each fan operating for at least 15 minutes.
b.
At least once per 18 months or (1) after any structural maintenance on the HEPA filter or charcoal adsorber housings, or (2) following painting, fire or chemical release in any ventilation zone communicating with the system, by:
1.
Verifying that the charcoal adsorbers remove a 99% of a halogenated hydrocarbon refrigerant test gas and that the HEPA filter banks remove = 99% of the DOP when they are tested in-place using the test procedure guidance of Regulatory Positions C.S.a, C.5.c and C.S.d of Regulatory Guide 1.52, Revision 2, March 1978 (except for the provisions of ANSI N510 Sections 8 and 9), and the system flow rate is 7410 cfm i 10%.
2.
Verifying within 31 days after removal that a laboratory analysis of a representative carbon sample obtained in I
accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, meets the laboratory i
testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978.
3.
Verifying a system flow rate of 7410 cfm i 10% during system operation.
1 After every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal adsorber operation by c.
verifying within 31 days after removal that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978.
l SALEM - UNIT 2 3/4'7-16 Amendment No.g165
_