Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20115F062 + (04:21:51, 13 December 2024)
- ML20115F047 + (04:21:52, 13 December 2024)
- 05000289/LER-1992-002-01, :on 920918,reactor Tripped as Result of Inadequate Review for Removal of Circulation Water Pump Trip on High Condenser Inlet Water Box Pressure.Procedures Will Be Revised to Provide Addl Guidance + (04:21:58, 13 December 2024)
- ML20115F042 + (04:21:59, 13 December 2024)
- ML20115F030 + (04:22:00, 13 December 2024)
- ML20115F024 + (04:22:01, 13 December 2024)
- ML20115F011 + (04:22:02, 13 December 2024)
- 05000324/LER-1992-005, :on 920528,MCC 2-2XB-2 Declared Inoperable Due to Seismic Support & Anchorage Deficiencies.Root Cause Analysis in Progress.Subj MCC Repaired & Engineering Evaluation Procedure ENP-12 Will Be Revised + (04:22:08, 13 December 2024)
- ML20115E999 + (04:22:09, 13 December 2024)
- ML20115E995 + (04:22:10, 13 December 2024)
- ML20115E982 + (04:22:11, 13 December 2024)
- ML20115E974 + (04:22:11, 13 December 2024)
- ML20115E973 + (04:22:12, 13 December 2024)
- JAFP-96-0275, Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant + (04:22:13, 13 December 2024)
- ML20115E971 + (04:22:13, 13 December 2024)
- 3F0485-05, Forwards Rev 4 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR73.21) + (04:22:14, 13 December 2024)
- 1CAN048503, Discusses Inspectability of Sleeved once-through Steam Generator Tubes,Per 850228 Request.Addl Time Necessary for Complete Response.Info Will Be Provided by 850510 + (04:22:15, 13 December 2024)
- ST-HL-AE-5425, Submits Change to Distribution List for Transmittals Re Facility + (04:22:15, 13 December 2024)
- ML20115E915 + (04:22:16, 13 December 2024)
- ML20115E902 + (04:22:17, 13 December 2024)
- 05000325/LER-1992-024, :on 920919,relay Failure Resulted in RPS B Power Loss Causing ESF Actuation Signals.Caused by Broken T-Bar in Relay 1-C71B-K1B.Relay Repaired,Fuse Replaced & RPS Bus B Restored + (04:22:23, 13 December 2024)
- BECO-92-119, Forwards Anticipated Operator Licensing Exam Schedule,Per GL 92-06, Operator Licensing Natl Exam Schedule + (04:22:25, 13 December 2024)
- ST-HL-AE-1225, Forwards Effective Page Listing to FSAR Through Amend 45. Listing Not Formal Addition & Will Be Updated Periodically + (04:22:25, 13 December 2024)
- ML20115E892 + (04:22:26, 13 December 2024)
- 05000325/LER-1992-021, :on 920920,south CS Room Fire Protection Sprinkler Sys Placed Under Clearance W/O Required Fire Watch.Event Reviewed W/Operations Personnel Emphasizing Need for Precise Communications Between Groups + (04:22:33, 13 December 2024)
- ML20115E887 + (04:22:34, 13 December 2024)
- ML20115E879 + (04:22:35, 13 December 2024)
- RC-96-0168, Submits Suppl Info,As Requested by NRC to Support SE Presented as Attachment II to Util ,Requesting Amend to TS Re MOVs Thermal Overload Protection & Bypass Devices + (04:22:36, 13 December 2024)
- ML20115E877 + (04:22:36, 13 December 2024)
- 05000341/LER-1992-010, :on 920918,auto-start Logic for All Station Air Compressors Lost When Modular Power Unit MPU-3 Deenergized. Caused by Personnel Error.Accountability Meeting Held to Address Event & AOP Revised + (04:22:38, 13 December 2024)
- ML20115E849 + (04:22:40, 13 December 2024)
- ML20115E852 + (04:22:40, 13 December 2024)
- ML20115E847 + (04:22:41, 13 December 2024)
- ML20115E844 + (04:22:41, 13 December 2024)
- ML20115E835 + (04:22:42, 13 December 2024)
- 05000341/LER-1992-008, :on 920919,electrician Did Not Open Bus 65F Trip Cutoff Switch,Resulting in Deenergization of Bus.Caused by Personnel Error.Continuing Training for Operations & Electrical Maint Will Be Emphasized + (04:22:44, 13 December 2024)
- ML20115E832 + (04:22:46, 13 December 2024)
- ML20115E825 + (04:22:47, 13 December 2024)
- ML20115E811 + (04:22:48, 13 December 2024)
- ML20115E804 + (04:22:49, 13 December 2024)
- ML20115E799 + (04:22:50, 13 December 2024)
- ML20115E780 + (04:22:51, 13 December 2024)
- ML20115E738 + (04:22:52, 13 December 2024)
- ML20115E746 + (04:22:52, 13 December 2024)
- 05000413/LER-1996-006-01, :on 960509,discovered Containment Floor and Equipment Sump Level Monitoring Inaccuracy.Caused by Inadequate Design Analysis.Added Water to Sumps to Ensure Sump Level Remains in Calibr Range + (04:22:55, 13 December 2024)
- ML20115E715 + (04:22:57, 13 December 2024)
- ML20115E713 + (04:22:58, 13 December 2024)
- ST-HL-AE-5405, Provides Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves + (04:22:59, 13 December 2024)
- 05000254/LER-1996-010-02, :on 960611,discovered Installed Gallery Steel Configuration Lacked Required Cross Bracing.Caused by Deficiency in Original Design Configuration Control Process. Installed Gallery Cross Bracing + (04:23:00, 13 December 2024)
- ML20115E699 + (04:23:02, 13 December 2024)
- ML20115E686 + (04:23:02, 13 December 2024)