Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20116L239 + (03:18:24, 13 December 2024)
- U-602615, Forwards semi-annual Fitness for Duty Report for Period Ending 960630 + (03:18:25, 13 December 2024)
- BVY-96-095, Monthly Operating Rept for July 1996 for VT Yankee Nuclear Power Station + (03:18:26, 13 December 2024)
- ML20116L227 + (03:18:26, 13 December 2024)
- ML20116L215 + (03:18:27, 13 December 2024)
- ML20116L210 + (03:18:28, 13 December 2024)
- ML20116L212 + (03:18:28, 13 December 2024)
- ML20116L205 + (03:18:32, 13 December 2024)
- ML20116L200 + (03:18:33, 13 December 2024)
- ML20116L190 + (03:18:34, 13 December 2024)
- ML20116L194 + (03:18:34, 13 December 2024)
- ML20116L181 + (03:18:35, 13 December 2024)
- ML20116L173 + (03:18:36, 13 December 2024)
- ML20116L164 + (03:18:39, 13 December 2024)
- ML20116L161 + (03:18:40, 13 December 2024)
- ST-HL-AE-4258, Special Rept:On 921007,SDG Tripped on Turbocharger Thrust Bearing Failure.Caused by Improper Installation of New Eutectic or Degradation of Turbocharger.Turbocharger Replaced.Vendor Manual,Drawings & Procedures Revised + (03:18:43, 13 December 2024)
- ML20116L145 + (03:18:44, 13 December 2024)
- ML20116L142 + (03:18:48, 13 December 2024)
- ML20116L131 + (03:18:49, 13 December 2024)
- ML20116L135 + (03:18:49, 13 December 2024)
- RC-96-0208, Confirms Schedule for Next Operator Licensing Exams to Be Administered at Plant + (03:18:50, 13 December 2024)
- ML20116L123 + (03:18:51, 13 December 2024)
- ML20116L116 + (03:18:51, 13 December 2024)
- RBG-37720, Special Rept:On 921013,Div I EDG Automatically Shutdown During Regular Monthly Surveillance Test.Caused by Failure of Shutdown Control Valve P-4.Valve Replaced & Surveillance Test Completed Approx 12 H After Valid Failure + (03:18:55, 13 December 2024)
- ML20116L087 + (03:18:55, 13 December 2024)
- ML20116L084 + (03:18:56, 13 December 2024)
- ML20116L077 + (03:19:00, 13 December 2024)
- ML20116L050 + (03:19:00, 13 December 2024)
- ML20116L043 + (03:19:01, 13 December 2024)
- ML20116L022 + (03:19:02, 13 December 2024)
- ML20116L021 + (03:19:03, 13 December 2024)
- B15839, Forwards Operational Readiness Plan Punchlist Items Identified for Restart as of 960808 for Plant,Unit 3, Correlation of Plant Sys to Sys Numbers & Abbreviations Used in Punchlist & Plan + (03:19:05, 13 December 2024)
- ML20116L016 + (03:19:09, 13 December 2024)
- ML20116L009 + (03:19:12, 13 December 2024)
- ML20116L002 + (03:19:13, 13 December 2024)
- ML20116K986 + (03:19:14, 13 December 2024)
- ML20116K987 + (03:19:14, 13 December 2024)
- ML20116K979 + (03:19:15, 13 December 2024)
- ST-HL-AE-4253, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-498/92-26 & 50-499/92-26 on 921016.Corrective Actions: Util Will Assemble NRC & Util Reportability Documents & Consolidate Guidance.Ler 92-009-00 for Unit 1 Encl + (03:19:20, 13 December 2024)
- ML20116K967 + (03:19:21, 13 December 2024)
- ML20116K959 + (03:19:22, 13 December 2024)
- ML20116K965 + (03:19:22, 13 December 2024)
- ML20116K955 + (03:19:26, 13 December 2024)
- 05000373/LER-1985-034-01, :on 850330,RHR Sys Shutdown Cooling Inboard Isolation Valve 1E12-F009 Isolated Four Times.Possibly Caused by Environmentally Qualified Pressure Switches W/O Pressure Snubbers.Pressure Snubbers Installed + (03:19:28, 13 December 2024)
- ML20116K947 + (03:19:32, 13 December 2024)
- ML20116K945 + (03:19:36, 13 December 2024)
- ML20116K939 + (03:19:37, 13 December 2024)
- ST-HL-AE-4254, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-498/92-26 & 50-499/92-26 on 921016.Corrective Actions: Plant Procedures Revised to Control Use of Changing Acceptance Criteria by 921130 + (03:19:37, 13 December 2024)
- ML20116K899 + (03:19:38, 13 December 2024)
- ML20116K926 + (03:19:38, 13 December 2024)
- ML20116K894 + (03:19:43, 13 December 2024)