Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20126B661 + (01:13:45, 13 December 2024)
- ML20126B659 + (01:13:46, 13 December 2024)
- ML20126B658 + (01:13:48, 13 December 2024)
- ML20126B657 + (01:13:48, 13 December 2024)
- ML20126B656 + (01:13:49, 13 December 2024)
- U-600029, Forwards List of Selected Operating Events to Be Used in Sys Function & Task Analysis,Per 850424 Responses to NRC Comments on Dcrdr Program Plan.Plan Process Fulfills Suppl 1 to NUREG-0737 Requirements + (01:13:50, 13 December 2024)
- ML20126B651 + (01:13:51, 13 December 2024)
- ML20126B653 + (01:13:51, 13 December 2024)
- ML20126B650 + (01:13:52, 13 December 2024)
- ML20126B649 + (01:13:53, 13 December 2024)
- ML20126B648 + (01:13:54, 13 December 2024)
- ML20126B646 + (01:13:54, 13 December 2024)
- PNO-II-80-028, on 800219,criticality Warning Sys Experienced False Alarm.Fuel Mfg Bldg Evacuated.No Abnormal Radiation Levels Existed + (01:13:55, 13 December 2024)
- ML20126B639 + (01:13:56, 13 December 2024)
- ML20126B636 + (01:13:57, 13 December 2024)
- ML20126B637 + (01:13:57, 13 December 2024)
- ML20126B635 + (01:13:58, 13 December 2024)
- ML20126B634 + (01:13:59, 13 December 2024)
- ML20126B633 + (01:13:59, 13 December 2024)
- ML20126B632 + (01:14:01, 13 December 2024)
- PNO-II-80-032C, updating PNO-II-80-032.Plant Remains in Stable Hot Standby.Repairs & Testing of Inoperable Decay Heat Closed Cycle Cooling Pump Expected to Be Completed Today.After Testing,Unit Will Be Shut Down + (01:14:02, 13 December 2024)
- ML20126B629 + (01:14:02, 13 December 2024)
- ML20126B625 + (01:14:03, 13 December 2024)
- ML20126B627 + (01:14:03, 13 December 2024)
- ML20126B623 + (01:14:04, 13 December 2024)
- ML20126B620 + (01:14:05, 13 December 2024)
- ML20126B617 + (01:14:06, 13 December 2024)
- ML20126B618 + (01:14:06, 13 December 2024)
- ML20126B616 + (01:14:10, 13 December 2024)
- PNO-III-85-047, on 850609,unit Tripped at 90% Power Due to Feedwater Pump Problems.Both Auxiliary & Main Feedwater Pumps Tripped,Leaving Steam Generators W/O Feedwater & at Low Water Level.Auxiliary Pumps Manually Restored + (01:14:11, 13 December 2024)
- ML20126B612 + (01:14:12, 13 December 2024)
- ML20126B613 + (01:14:12, 13 December 2024)
- ML20126B610 + (01:14:13, 13 December 2024)
- ML20126B608 + (01:14:14, 13 December 2024)
- ML20126B609 + (01:14:14, 13 December 2024)
- ML20126B606 + (01:14:15, 13 December 2024)
- ML20126B604 + (01:14:16, 13 December 2024)
- ML20126B603 + (01:14:17, 13 December 2024)
- ML20126B601 + (01:14:18, 13 December 2024)
- ML20126B600 + (01:14:18, 13 December 2024)
- ML20126B599 + (01:14:19, 13 December 2024)
- ML20126B596 + (01:14:20, 13 December 2024)
- ML20126B592 + (01:14:21, 13 December 2024)
- ML20126B590 + (01:14:22, 13 December 2024)
- ML20126B589 + (01:14:22, 13 December 2024)
- JSP-614-92, Application for Amend to License NPF-62,revising TS 3/4.3.2, Containment & Rv Isolation Control Sys, to Provide Reasonable Period of Time to Detect & Correct Inoperabilities of Differential Temp Isolation Instruments + (01:14:23, 13 December 2024)
- ML20126B586 + (01:14:24, 13 December 2024)
- ML20126B585 + (01:14:25, 13 December 2024)
- ML20126B583 + (01:14:25, 13 December 2024)
- ML20126B581 + (01:14:26, 13 December 2024)
- 05000461/LER-1992-010, Re-isssed LER 92-010-00:on 921122,turbine Driven RFP B Min Flow Valve Failed Open Due to Broken Instrument Air Supply Line.Copper Tubing Air Supply Line Replaced W/Flexible Stainless Steel Hoses + (01:14:27, 13 December 2024)
- ML20126B578 + (01:14:28, 13 December 2024)